Senior Program Engineer – Schedule & Risk (FBM)

Lockheed Martin Corporation

Littleton (CO)

On-site

USD 96,000 - 178,000

Full time

8 hours ago
Be an early applicant

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Benefits offered by this job

Medical benefits
401(k) match
Paid time off
Flexible work arrangements
Education assistance

Job summary

Lockheed Martin is seeking a Reentry Integrator for the Fleet Ballistic Missile (FBM) program. You will manage the end-to-end lifecycle of schedule, cost, and risk, driving integration of all program artifacts from concept to execution.

You will build and maintain the integrated master schedule, perform critical-path verification, time‑phased analyses, and schedule‑risk assessments for senior leadership decisions.

Qualifications

  • Bachelor’s degree plus 3 years professional experience.
  • Proficiency in Word, Excel, and PowerPoint.
  • Experience with ERP/SAP or other MRP systems (e.g., SAIL).
  • Excellent written and oral communication; demonstrated briefing experience to senior leadership.
  • Strong analytical mindset; translate complex risk into mitigation actions.
  • US citizenship and ability to obtain US DoD Top Secret clearance; pass drug/background checks.

Responsibilities

  • Own end‑to‑end lifecycle of schedule, cost, and risk management for the program.
  • Develop and maintain the integrated master schedule; verify critical path.
  • Perform time‑phased predictive analyses and schedule‑risk assessments.
  • Translate insights into actionable recommendations for senior leadership.
  • Collaborate with FBM Material Management, GOE Reentry, and long‑range life‑of‑type forecasts to protect schedule continuity.

Skills

3 years experience
Word, Excel, PowerPoint
ERP/SAP or MRP systems
Excellent communication
Analytical mindset
US Citizenship & DoD clearance

Education

Bachelor’s degree in engineering or related field

Tools

SAIL

Job description

Lockheed Martin is seeking a Reentry Integrator for the Fleet Ballistic Missile (FBM) program. You will manage the end-to-end lifecycle of schedule, cost, and risk, driving integration of all program artifacts from concept to execution.

You will build and maintain the integrated master schedule, perform critical-path verification, time‑phased analyses, and schedule‑risk assessments for senior leadership decisions.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

FBM Risk & Opportunities Engineer
FBM Risk & Opportunities Engineer

Lockheed Martin Corporation • Titusville (FL)

On-site
USD 105,000 - 195,000
Senior Systems Engineer, Requirements & Verification (FBM)
Senior Systems Engineer, Requirements & Verification (FBM)

Lockheed Martin Corporation • Littleton (CO)

On-site
USD 96,000 - 178,000
Medical benefits
Dental benefits
Vision benefits
+7
Senior Mechanical Systems Integration Engineer - SEIT
Senior Mechanical Systems Integration Engineer - SEIT

Lockheed Martin Corporation • Littleton (CO)

On-site
USD 145,000 - 270,000
Medical, Dental, Vision
Flexible work arrangements
4x10 schedule
Flight Software Engineer - Real-Time Embedded (Early Career)
Flight Software Engineer - Real-Time Embedded (Early Career)

Lockheed Martin Corporation • Littleton (CO)

On-site
USD 75,000 - 140,000
Medical insurance
Dental insurance
Vision insurance
+6
Senior Systems Engineer - Flight Sciences Integration
Senior Systems Engineer - Flight Sciences Integration

Lockheed Martin Corporation • Littleton (CO)

On-site
USD 118,000 - 219,000
Space FBM Project Engineering Manager – Flexible Hours
Space FBM Project Engineering Manager – Flexible Hours

Lockheed Martin Corporation • Littleton (CO)

On-site
USD 145,000 - 270,000
Medical
Dental
Vision
+3
FBM Production Operations Lead (Onsite)
FBM Production Operations Lead (Onsite)

Lockheed Martin Corporation • Littleton (CO)

On-site
USD 88,000 - 164,000
Medical, Dental, Vision insurance
Flexible work arrangements
401(k) match
+2
Systems Engineer, Requirements & Verification (FBM)
Systems Engineer, Requirements & Verification (FBM)

Lockheed Martin Corporation • Littleton (CO)

On-site
USD 79,000 - 147,000
Medical insurance
Dental insurance
Vision insurance
+11
Senior Integrated Program Planner & Scheduler Lead
Senior Integrated Program Planner & Scheduler Lead

Lockheed Martin Corporation • Lexington (KY)

On-site
USD 80,000 - 149,000
Medical insurance
Dental insurance
401(k) match
+1
Lead Project Engineer, Space Avionics & Age Management
Lead Project Engineer, Space Avionics & Age Management

Lockheed Martin Corporation • Denver (CO)

On-site
USD 105,000 - 195,000
Medical, Dental, Vision
401(k) match
Paid time off