Scheduling Manager - Data Center Construction - Portsmouth, OH

KALCON

Portsmouth (OH)

Ibrido

USD 150.000 - 225.000

Tempo pieno

11 giorni fa

Aumenta le possibilità di ricevere una risposta da questo datore di lavoro

Il tuo curriculum e una lettera di presentazione personalizzati, che corrispondono esattamente a ciò che sta cercando.

Supera i filtri ATS

Vantaggi offerti da questo lavoro

Medical Insurance
Dental Insurance
Vision Insurance
Life Insurance
Accident Insurance
Long Term Disability
401(k) retirement plan with 4% Kalcon"
Paid time off (15 days)
8 national holidays
Certification/license reimbursement

Descrizione del lavoro

KALCON in Portsmouth, OH is seeking a Scheduling Manager to provide Owner Rep P6 schedule oversight of GC schedules on a data center build. This hybrid remote flex role requires 25-50% travel to the Portsmouth site.

The role demands a Bachelor's in CM/Engineering, 3-10+ years of scheduling, strong CPM skills, and expert P6 knowledge. Responsibilities include audits, framework development, critical path tracking, and risk analysis, with a comprehensive benefits package.

Competenze

  • Bachelor's degree in CM, Engineering, or related field or equivalent
  • 3–10+ years related experience
  • Understand CPM scheduling theory and its application to projects
  • Ability to interpret drawings, specs, and contracts at all design levels
  • Expert knowledge of Primavera P6 (latest version)
  • Extensive experience with MS Office (Excel, PowerPoint, SharePoint, Word)
  • Data center experience is a plus

Mansioni

  • Independently audit GC Primavera P6 schedules (XER) for accuracy and conformance to client standards
  • Help establish a national, repeatable scheduling framework with templates and reporting formats
  • Track and report critical milestones for data-driven client decisions
  • Perform Monthly baseline audits and Weekly focused audits as needed
  • Track OFCI equipment delivery dates and coordinate with superintendents and subs
  • Run DCMA checks and analyze variances, identify risk drivers and corrective actions
  • Standardize L1/L2 milestones to compare different projects
  • Validate critical path logic and constraint assignments
  • Translate and update schedule sequences to PDF drawings for visuals
  • Contribute to planning and sequencing from concept to commissioning
  • Develop policies and procedures for scheduling and training
  • Develop scheduling plans from concept through commissioning
  • Review and analyze critical path schedules and provide comprehensive variance analysis
  • Run Monte Carlo and other risk analyses to assess schedule risk

Conoscenze

Scheduling proficiency
CPM theory
Drawings & specs comprehension
Leadership/communication

Formazione

Bachelor's Degree in Construction Management/Engineering or related field

Strumenti

Primavera P6
MS Office

Descrizione del lavoro

Seeking a Scheduling Manager to provide Owner Rep P6 schedule oversight of General Contractor schedules on a data center build.

This is a hybrid remote flex role that will require commitment to 25-50% travel to the Portsmouth, OH site.

Minimum Qualifications
  • Bachelor's Degree in Construction Management, Engineering, or relevant functional discipline or equivalent combination of education and experience
  • 3-10+ years related work
  • Understand the Critical Path Method of scheduling theoretically and as it applies to projects
  • Ability to understand and accurately interpret construction documents (drawings, specifications, contracts/general conditions) at all levels of design.
  • Expert knowledge of Primavera Scheduling Software (P6, latest Version) and MS
  • Extensive experience using Microsoft Office software tools such as Excel, PowerPoint, SharePoint, and Word.
  • Data center experience is a plus.
Duties And Responsibilities
  • Independently audit general contractor (GC) Primavera P6 schedules (XER files) for accuracy and conformance to client standards and project requirements.
  • Help to establish and maintain a national, repeatable scheduling framework—including templates, coding structures, and reporting formats.
  • Track and report critical milestones, enabling client leadership to make timely, data‑driven decisions.
  • Baseline & Progress Audits: Monthly at minimum; Focused Audits: Weekly, upon GC update receipt or at client request
  • Track OFCI equipment delivery dates and highlight problem areas, with the afore mentioned superintendent and subcontractor buy‑in to solutions.
  • Run DCMA Checks. 2. Compare against contractual baseline & previous period. 3. Review activities that are running in parallel. 4. Review multiple float paths. 5. Identify variance drivers & risks. 6. Recommend corrective actions.
  • Standardize L1 and L2 Milestones to be able to compare different construction projects
  • Validate that constraints are assigned only to required L1 and L2 identifies milestones and ensure that the critical path is logical.
  • Ability to translate, create and update schedule sequences to PDF drawings for visual
  • You will join the Project Controls team in providing professional scheduling capabilities and enable Client's ability to profoundly affect and accelerate speed to market
  • Responsible for developing policies and procedures for scheduling and facilitating user training with our internal and external stakeholders
  • Contribute to the development of planning and sequencing of activities from concept through commissioning
  • Define activities and associated scope, durations, logic, and interface between activities and resource loading of those activitie
  • Review and analyze critical path schedules, in an efficient and comprehensive manner with
  • Develop comprehensive plans that communicates the programs, projects, and strategic goals
  • Monitor schedule performance data, develop complex data analysis, and issue schedule reports required by management and project procedures
  • Investigate and incorporate project constraints in planning effort
  • Perform Time Impact Analysis and Claims analyzation
  • Develop schedule variance analysis
  • Run schedule risk scenarios based on Monte Carlo and other risk analysis
Benefits Offered
  • Medical insurance
  • Dental insurance
  • Vision insurance
  • Life Insurance
  • Accident Insurance
  • Long Term Disability
  • 401(k) retirement plan with 4% KALCON match when an employee contributes at least 5%
  • 15 days of paid time off
  • 8 paid national holidays
  • Reimbursement for professional licenses and certifications
Submission Requirements
  • List of all Educational Achievements
  • List of all Professional Licenses or Certificates
  • List of Awards Received
  • Detailed Employment History with each company
  • Name of the firm or agency
  • Start Date and End Date (Month & Year)
  • Positions Held
  • List of Projects/Programs Managed including project value, location of assignment, roles and responsibilities and contribution to each project

At KALCON we are committed to creating an inclusive, diverse, and equitable workplace where every individual is respected and valued. We are an equal opportunity employer and all applicant and employees will receive consideration for employment as we do not tolerate discrimination of any kind based on race, color, religion, gender, sexual orientation, gender identity, national origin, age, disability, genetics, protected veteran status or any other protected characteristic as outlined by federal, state, or local laws. We believe that a diverse workforce contributes to the success of our company and the innovation behind the exceptional projects we deliver. We encourage and support applicants from all backgrounds, experiences, and perspectives to join our team and thrive. Our hiring and employment practices are guided by principles of fairness, equality, and opportunity for all.

Salary Range: $150,000 USD - $225,000 USD

Ottieni la revisione del curriculum gratis e riservata.

o trascina qui il file.

Similar jobs

Offerte di lavoro simili che vale la pena confrontare

Data Center Scheduling Lead | Owner's Rep
Data Center Scheduling Lead | Owner's Rep

KALCON • Pittsburgh

In loco
USD 90.000 - 130.000
Scheduling Manager (Owner's Representative) - Data Center Construction
Scheduling Manager (Owner's Representative) - Data Center Construction

KALCON • Pittsburgh

In loco
USD 90.000 - 130.000
Medical insurance
Dental insurance
Vision insurance
+3
Planning and Delivery Manager - Data Center Construction (Hybrid)
Planning and Delivery Manager - Data Center Construction (Hybrid)

KALCON • Tulsa (OK)

In loco
USD 140.000 - 200.000
Medical insurance
Dental Insurance
Vision Insurance
+7
Planning and Delivery Manager - Data Center Construction (Hybrid)
Planning and Delivery Manager - Data Center Construction (Hybrid)

KALCON • Colorado City (TX)

In loco
USD 140.000 - 200.000
Medical insurance
Dental Insurance
Vision Insurance
+4
Planning and Delivery Manager - Data Center Construction (Hybrid)
Planning and Delivery Manager - Data Center Construction (Hybrid)

KALCON • Lubbock (TX)

In loco
USD 140.000 - 200.000
Medical insurance
Dental Insurance
Vision Insurance
+7
Planning and Delivery Manager - Data Center Construction (Hybrid)
Planning and Delivery Manager - Data Center Construction (Hybrid)

KALCON • Buffalo (NY)

In loco
USD 140.000 - 200.000
Medical insurance
Dental Insurance
Vision Insurance
+5
Planning and Delivery Manager (Owner's Representative) - Data Center Construction (Hybrid)
Planning and Delivery Manager (Owner's Representative) - Data Center Construction (Hybrid)

KALCON • River Bend (LA)

In loco
USD 140.000 - 200.000
Medical insurance
Dental insurance
Vision insurance
+7
Planning and Delivery Manager (Owner's Representative) - Data Center Construction (Hybrid)
Planning and Delivery Manager (Owner's Representative) - Data Center Construction (Hybrid)

KALCON • Lubbock (TX)

In loco
USD 140.000 - 200.000
Medical insurance
Dental Insurance
Vision Insurance
+9
Planning and Delivery Manager - Data Center Construction (Hybrid)
Planning and Delivery Manager - Data Center Construction (Hybrid)

KALCON • Lebanon (IN)

In loco
USD 140.000 - 200.000
Medical insurance
Dental Insurance
Vision Insurance
+7
Planning and Delivery Manager (Owner's Representative) - Data Center Construction (Hybrid)
Planning and Delivery Manager (Owner's Representative) - Data Center Construction (Hybrid)

KALCON • Tulsa (OK)

In loco
USD 140.000 - 200.000
Medical insurance
Dental Insurance
Vision Insurance
+8