QA/QC Manager- Data Center Construction Projects

Lemartec Corporation

Dallas (TX)

On-site

USD 120,000 - 150,000

Full time

2 days ago
Be an early applicant

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Benefits offered by this job

Medical, Dental, and Vision insurance
401(k) with company match
Employee Stock Purchase Plan (ESPP)
Flexible spending account

Job summary

Lemartec Corporation is seeking a Quality Control Manager to develop and enforce process quality standards across construction and manufacturing. The role involves testing, inspection, data analysis, and coordination with subcontractors and labs, with a focus on documentation control and turnover.

The ideal candidate will have a Bachelor’s degree in engineering, 5+ years’ experience, strong communication and interpersonal skills, and the ability to travel within the United States.

Qualifications

  • Bachelor’s degree in engineering.
  • 5+ years of related experience; or equivalent combination of education and experience.
  • Proven ability to manage multiple projects in a dynamic fast pace environment.
  • Superior communication and organization development skills.
  • Ability to stand or walk on concrete floor for 8+ hours; lift and/or move up to 50 lbs.
  • Strong interpersonal skills and ability to work with and manage cross-functional teams.
  • Experience with Microsoft Office and Procore.
  • Ability to travel and relocate within the United States.
  • Experience in projects greater than $100 million.
  • Bilingual (English/Spanish).

Responsibilities

  • Oversee the implementation of all related process quality standards.
  • Test, measure and analyze those standards; evaluate procedural methods.
  • Manage subcontractors/labs for testing products and formulating data.
  • Perform all related QA/QC inspections.
  • Maintain inspections logs.
  • Maintain all subcontractors/Lab's job files.
  • Attend weekly meetings; project monthly testing report generation.
  • Establish program to evaluate precision and accuracy of process equipment.
  • Identify process faults and report as necessary.
  • QC process punch-list management.
  • Mentoring preparation and control of project quality system documentation.
  • Ensure all project site compliance with Document Control system.
  • Ensure proper turnover of complete quality control and turnover documentation.
  • Check and monitor progress/approval reports; track storage, loading and delivery.
  • Check that all materials and equipment used are approved by EOR/AOR.
  • Pre-project surveys and verify site plans.
  • Confirm new and existing construction layouts are made properly.
  • Verify documentation/order of specifications and plans.
  • Verify testing and inspections follow AHJ standards.
  • Ensure areas/items inspected follow contract documents.
  • Create a construction check list for tasks to verify materials, staff, safety.
  • Maintain communication with Project Team and General Superintendent.

Skills

Interpersonal skills
Communication
Organizational skills
Cross-functional leadership
Travel willingness
Team management

Education

Bachelor’s degree in engineering

Tools

Microsoft Office
Procore

Job description

Overview

The Quality Control Manager is responsible for developing and applying process quality control standards in the designated project. These standards may be related to the manufacturing process, Construction process, materials utilized, overall product or a combination of all four. The QC Manager will also be involved in testing, inspecting and evaluating design and construction methods, procedures as well as final products.

Location & Travel Details

You’ll get the opportunity to travel across the US, helping our team build infrastructure projects. This is a traveling position that requires travel up to 100% of the time. You may support projects located in various states throughout the US. Potential project locations may include, but are not limited to, PA, KS, NC, SC, VA, GA, TX, FL, IA, and WY, with additional locations added frequently as our organization continues to grow.

COMPANY OVERVIEW

Founded in 1979, Lemartec is a national general contractor and construction management firm and is part of the General Building group within MasTec's Clean Energy and Infrastructure segment.

As MasTec's vertical construction arm, Lemartec delivers complex projects across industrial, aviation, power, and large commercial markets. Led at the segment level by Manny García-Tuñón, the General Building Operating Group represents MasTec's vertical construction capabilities and serves as the platform for future growth in this space. As a MasTec company, Lemartec maintains international capabilities and strategic partnerships throughout the Americas and the Caribbean, enabling the execution of some of the most complex projects in the industries we serve. Through MasTec's network of more than 22,000 professionals and subject matter experts in Engineering, Procurement, and Construction across over 400 locations throughout North America and the Caribbean, Lemartec is uniquely positioned to serve a diversified customer base.

With experience across all 16 disciplines of construction, Lemartec combines deep technical expertise with the strength, scale, and financial backing of MasTec to successfully deliver projects of any size and complexity.

MasTec's Clean Energy & Infrastructure (CE&I) segment generates over $4 billion in annual revenue, providing construction services across industrial, renewables and infrastructure sectors. In infrastructure, we specialize in general heavy civil construction, underground utilities, structures, electrical work, material production, roadways, bridges, specialty pavement overlays, environmental projects and commercial buildings. Sustainability and safety are foundational to our culture and influence everything we do.

MasTec, a minority-owned Fortune 500 company, has shaped the construction industry for more than 90 years. With over 35,000 employees and 400 offices nationwide, we provide flexibility and career growth in dynamic work environments. Join one of the largest construction firms in the country (Engineering News-Record [ENR]: #1 in Power, #17 Top 50 Domestic Heavy Contractors, #20 Transportation Contractor).

Responsibilities
  • Oversee the implementation of all related process quality standards.
  • Test, measure and analyze those standards. Evaluate procedural methods.
  • Manage subcontractors/labs for testing products and formulating the appropriate data.
  • Perform all related QAQC inspections.
  • Maintain inspections logs.
  • Maintain all subcontractors/Lab's job files.
  • Attend weekly meetings. Project Monthly Testing Report Generation.
  • Establishes program to evaluate precision and accuracy of process equipment.
  • Identifies process faults (deficiencies/short comings) and records and reports as necessary.
  • QC Process Punch-List Management.
  • Mentoring preparation and control of project quality system management documentation prior to project/ Activity commencement.
  • Ensuring all project site compliance with Document Control system.
  • Ensuring proper turnover of complete quality control, ensure that turnover documentation is maintained, organized, and turned over on schedule.
  • Check & monitor progress/approval reports status daily, weekly, and monthly, track storing, loading and delivery to the project site.
  • Check & monitors that all materials and equipment's being used have been properly approved by the EOR / AOR.
  • Prior beginning the project, study the existing survey of the site / project to compare with the proposed site plan and verify.
  • Confirm new and existing construction layouts are made properly, checking existing perimeters structures, setbacks, elevations, existing structures.
  • Prior commencement verifies that the specification, plans, all documents control system is in order and fulfil schedule.
  • Verify that all testing and inspection needed for that specific job, system is created and follows standards set by the AHJ including but not limited to city, county, AOR, EOR, special inspector, etc.
  • Verify that all areas/items inspected follows the current contract documents. i.e. Project's Drawings, Shop Drawings, Specifications, Sketches, etc.
  • To perform our QA/QC inspection before calling for inspections. Verify that the specification of the material (concrete, steel, wood soil, MEP equipment.) to be used is the same on plans, specification and in Subcontractor documents then verify on site during construction.
  • Create a construction check list for each important task to verify material, staff, inspection, safety, etc.
  • Maintain good communication with Project Team and General Superintendent to inform any important problem, discrepancy in the design, codes interpretations, specs or drawing, or anything.
Qualifications
  • Bachelor’s degree in engineering.
  • 5+ years of related experience; or equivalent combination of education and experience.
  • Proven ability to manage multiple projects/activities in a dynamic fast pace environment.
  • Superior communication and organization development skills.
  • Ability to stand or walk on concrete floor for 8+ hours; lift and/or move up to 50 lbs.
  • Strong interpersonal skills and ability to work with and manage cross-functional teams.
  • Experience with Microsoft Office and Procore.
  • Ability to travel and/or relocate within the United States.
  • Experience in projects greater than $100 million.
  • Bilingual (English/Spanish).
What's in it for You
Financial Wellbeing
  • Compensation $120K-$150K / year, commensurate with experience
  • Competitive pay with ongoing performance review and merit increase
  • 401(k) with company match & Employee Stock Purchase Plan (ESPP)
  • Flexible spending account (Healthcare & Dependent care)
Health & Wellness
  • Medical, Dental, and Vision insurance (plan choice) - coverage for spouse, domestic partner, and children
  • Diabetes Management, Telehealth Coverage, Prescription Drug Plan, Pet Insurance
Family & Lifestyle
  • Paid Time Off, Paid Holidays, Bereavement Leave
  • Military Leave, including Differential Pay and Benefits Continuation
  • Employee Assistance Program
Planning for the Unexpected
  • Short and long-term disability, life insurance, and accidental death & dismemberment
  • Voluntary life insurance, accident, critical illness, hospital indemnity coverage
  • Emergency Travel Assistance Program
  • Group legal plan

Position may be subject to pre-employment screening, which may include background check and drug testing. Accessibility: If you need accommodation as part of the employment process, contact ceicareers@mastec.com. Due to the high volume of applications received, we are unable to respond to individual requests regarding application status. Please log into your candidate profile for up-to-date information.

MasTec, Inc. is an Equal Employment Opportunity Employer. The Company's policy is not to unlawfully discriminate against any applicant or employee on the basis of race, color, sex, sexual orientation, gender identity, religion, national origin, age, disability, genetic information, military status, or any other consideration made unlawful by applicable federal, state, or local laws. The Company also prohibits harassment of applicants and employees based on any of these protected categories. It is also MasTec's policy to comply with all applicable state, federal and local laws respecting consideration of unemployment status in making hiring decisions.

MasTec Clean Energy & Infrastructure and our subsidiaries do not work with any third-party recruiters or agencies without a valid signed agreement and partnership with the Corporate Talent Acquisition Team.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Senior Electrical Project Manager
Senior Electrical Project Manager

Lemartec • Kansas City (KS)

On-site
USD 150,000 - 195,000
Life insurance
Vision insurance
Flexible benefit account
+3
Safety Manager or Sr. Safety Manager Multiple Locations Available
Safety Manager or Sr. Safety Manager Multiple Locations Available

Lemartec Corporation • United States

On-site
USD 110,000 - 160,000
Competitive pay
401(k) with company match
Healthcare benefits
+1
Area Safety Manager
Area Safety Manager

Lemartec Corporation • Miami (FL)

On-site
USD 120,000 - 170,000
Per diem
Vehicle allowance
Relocation assistance
Senior MEP Project Manager- Data Center
Senior MEP Project Manager- Data Center

Lemartec Corporation • Bethalto (IL)

On-site
USD 150,000 - 195,000
Competitive salary $150k–$195k+
401(k) with company match
Flexible spending account
+2
Senior MEP Project Manager- Data Center
Senior MEP Project Manager- Data Center

Lemartec Corporation • Troy Grove (IL)

Remote
USD 150,000 - 195,000
401(k) with company match
Medical, Dental, Vision insurance
Flexible spending account (FSA)
Senior MEP Project Manager- Data Center
Senior MEP Project Manager- Data Center

Lemartec Corporation • Fairview Heights (IL)

On-site
USD 150,000 - 195,000
Health insurance
401(k) with company match
Flexible spending account
+1
Senior MEP Project Manager- Data Center
Senior MEP Project Manager- Data Center

Lemartec Corporation • Glen Carbon (IL)

On-site
USD 150,000 - 195,000
401(k) with company match
Employee Stock Purchase Plan (ESPP)
Healthcare coverage
Senior MEP Project Manager- Data Center
Senior MEP Project Manager- Data Center

Lemartec Corporation • O'Fallon (IL)

On-site
USD 150,000 - 195,000
Medical, Dental, Vision insurance
401(k) with company match
Flexible Spending Account (FSA)
+1
Senior MEP Project Manager- Data Center
Senior MEP Project Manager- Data Center

Lemartec Corporation • East Alton (IL)

On-site
USD 150,000 - 195,000
401(k) with company match
Medical, Dental, Vision insurance
Paid Time Off
+2
Senior MEP Project Manager- Data Center
Senior MEP Project Manager- Data Center

Lemartec Corporation • Wood River (IL)

On-site
USD 150,000 - 195,000
401(k) with company match & ESPP
Flexible spending account
Medical, Dental, Vision insurance
+1