QA/QC Inspector – Data Center Construction (Travel)

Essel Skilled Trades

Independence (MO)

On-site

USD 44,000 - 83,000

Full time

6 days ago
Be an early applicant

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

Essel Skilled Trades is seeking QA/QC inspectors for large data center construction projects. You will inspect electrical and mechanical installs, test equipment against specs, and maintain thorough quality records ahead of startup.

In this role you will travel 75%+ to sites, log and report deficiencies, and provide daily progress updates to the site supervisor. A 3–5 year background in QA/QC is required along with strong Excel skills.

Qualifications

  • 3–5 years in QA/QC, inspection, commissioning, or electrical/mechanical construction.
  • Able to read construction drawings and specs.
  • Knowledge of test equipment; proficient with Excel and Office.
  • Able to travel 75%+ of the time.
  • Must pass background check, drug screen, and driving record check.

Responsibilities

  • Inspect electrical and mechanical installs against drawings and specs.
  • Test installed equipment and keep testing gear calibrated.
  • Photograph, log and report deficiencies, then re-check once fixed.
  • Keep inspection reports, checklists and non-conformance records current.
  • Give daily progress updates to the site supervisor.

Skills

QA/QC experience
Inspection work
Reading drawings
Travel 75%+

Tools

Test equipment
Excel

Job description

Essel Skilled Trades is hiring QA/QC inspectors for large data center construction projects. You'll inspect electrical and mechanical installs, test equipment against spec, and keep quality records in order ahead of startup.

What you'll do:
  • Inspect electrical and mechanical installs against drawings and specs
  • Test installed equipment and keep testing gear calibrated
  • Photograph, log and report deficiencies, then re-check once fixed
  • Keep inspection reports, checklists and non-conformance records current
  • Give daily progress updates to the site supervisor
Must-haves:
  • 3–5 years in QA/QC, inspection, commissioning, or electrical/mechanical construction
  • Able to read construction drawings and specs
  • Working knowledge of test equipment; comfortable with Excel and Microsoft Office
  • Able to travel 75%+ of the time
  • Must pass background check, drug screen, and driving record check

Pay: $32–$60/hr, depending on experience

Type: Temp-to-hire, full-time

Travel: 75%+

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

QA/QC Inspector – Data Center Construction (Travel)
QA/QC Inspector – Data Center Construction (Travel)

Essel Skilled Trades • Frederick (MD)

On-site
USD 44,000 - 83,000
QA/QC Inspector – Data Center Construction (Travel)
QA/QC Inspector – Data Center Construction (Travel)

Essel Skilled Trades • Santa Teresa (NM)

On-site
USD 44,000 - 83,000
QA/QC Inspector – Data Center Construction (75% Travel)
QA/QC Inspector – Data Center Construction (75% Travel)

Essel Skilled Trades • Frederick (MD)

On-site
USD 44,000 - 83,000
Travel-Heavy QA/QC Inspector for Data Center Builds
Travel-Heavy QA/QC Inspector for Data Center Builds

Essel Skilled Trades • Santa Teresa (NM)

On-site
USD 44,000 - 83,000
QA/QC Inspector - Data Center Field Projects
QA/QC Inspector - Data Center Field Projects

Essel Skilled Trades • Independence (MO)

On-site
USD 44,000 - 83,000
QA/QC Engineer
QA/QC Engineer

CloudHQ LLC • Ashburn (VA)

On-site
USD 75,000 - 120,000
QA/QC Engineer, Data Center — 50-75% Travel, Home Office
QA/QC Engineer, Data Center — 50-75% Travel, Home Office

Salute • Charlotte (NC)

Hybrid
USD 55,000 - 75,000
Quality Engineer - Data Centers
Quality Engineer - Data Centers

Empiric • Virginia (MN)

Remote
USD 90,000 - 115,000
Electrical QA/QC Specialist - Data Center Commissioning
Electrical QA/QC Specialist - Data Center Commissioning

Essel • Dallas (TX)

On-site
USD 90,000 - 130,000
Health benefits
401(k) and profit sharing
PTO and holidays
QA/QC Electrical Inspector
QA/QC Electrical Inspector

VG Project Consulting • Philadelphia

On-site
USD 60,000 - 80,000