Duet in Denver seeks a Purchasing Manager to own every order from quote through punch for Duet Design and Duet Build. You’ll sit with the team, confirm specs, and ensure on-time delivery in a fast-paced design-build environment.
You’ll manage releases, expedites, and approvals, while coordinating with designers, project managers, and accounting. A college degree and Studio Designer skills are required.
You’re the person who reads an acknowledgement line by line, catches the wrong finish on a pair of sconces, and has it fixed before the factory cuts metal. You know where every open order stands without looking it up, and when a date slips, the designer hears it from you first.
You have five to seven years purchasing for high-end residential or commercial design, a college degree, and Studio Designer skills other people come to you for. You know showrooms, reps, workrooms and lead times, and you have references who vouch for you without hesitating.
We’re hiring a Purchasing Manager for Duet, our design‑build group in Denver. You’ll own every order for Duet Design and Duet Build, from the first quote to the last punch item in a client’s home. You report to our Principal at Duet Design on the design side and the President of Duet Build on the build side.
Why this role exists.
We’ve run purchasing through an outside partner, and it taught us what we want: one person, in house, who sits with the team and owns every order start to finish. So we’re bringing purchasing home.
Your lane is clear. Our designers and project managers specify and release. Our Superintendents own the site. Accounting pays the bills. You own the order and everything that follows it: placing it, confirming it, tracking it, fixing it when it goes sideways, receiving it, getting it installed on the date we promised and closing the punch list. On the design side that means furniture, lighting, rugs, window treatments and accessories. On the build side it means the fixtures, hardware, tile and materials Build buys directly.
How we run a project here.
We don’t make it up as we go. Here’s the system you’d be running:
Released means ordered. When a principal releases an item, it’s ordered within two business days. Client funds sitting on an item that isn’t ordered is the one thing we never want to find.
The release cycle. Every two weeks, three Studio Designer reports go out: office expenses, open orders with vendor balances due, and items with client funds applied but not yet ordered. The principals release. You place.
Tuesday is order day. Every Tuesday you touch every open line, confirm ship dates and send the weekly order summary to the project manager and the principals. Nothing buried, nothing chased.
Slips get named. Any ship date that slips more than two weeks gets escalated the week you learn about it. Anything discontinued or past the install window comes with two alternates.
Approvals before production. Every CFA, DFA and shop drawing goes to the principal before anything is made. Nothing outside a signed proposal or change order gets ordered.
Received means in hand. An item is marked received in Studio Designer only when it’s physically at the warehouse. Every piece is opened, inspected and photographed there, and any damage or wrong item is claimed within forty-eight hours.
Install dates are protected. Fourteen days out, the install plan is issued. Seven days out, every vendor, installer and delivery is reconfirmed in writing. The day after install, the punch list goes out with photos, room by room.
If it isn’t in Studio Designer, it didn’t happen.
What you’ll own, stage by stage.
Every Duet Design project runs through seven stages, and you own the purchasing side of each one, from the first quote to the last punch item. This is the job, in the order a project moves:
Build purchasing. You order the plumbing fixtures, door hardware, tile, lighting and other materials Build buys directly, once the client has signed the change order. You time deliveries with the Superintendents so materials land on site when the trades need them, and keep JobTread current on every one.
The weekly rhythm. Monday, the received-date report goes to the project managers. Tuesday, every open line gets touched and the order summary goes out. Every other week, the release cycle. Install weeks, you’re on site.
A week in the life
The received-date report goes to the project managers. Two pieces for a January install are still in production, so they go on the team agenda with a date next to each.
Release review with the principals. Fourteen items are released, and by Wednesday every one is ordered.
Order day. You touch every open line, confirm ship dates and send the weekly order summary by noon.
An acknowledgement comes back with the wrong finish on a pair of sconces. You catch it against the spec,