Production Technician - Weekend - First Shift (Fri, Sat, Sun)

Commonwealth Fusion Systems

Harvard (MA)

On-site

USD 41,000 - 56,000

Full time

14 days+

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

Commonwealth Fusion Systems is hiring a Production Technician for the Devens, MA manufacturing team to build and test superconducting magnets. You will operate and monitor processes, drive continuous improvement, and collaborate with Operations, Maintenance and Quality.

Role requires 6+ years in electro mechanical assembly and offers a Fri–Sun weekend shift from 6:00 am to 6:00 pm with pay of 30–41 USD per hour plus a 15% differential.

Qualifications

  • 6+ years' experience in electro mechanical assembly.

Responsibilities

  • Performing and monitoring the manufacturing processes required to build and test superconducting magnets.
  • Ensures functional operation and preventative maintenance of equipment and continuous improvement.
  • Close cooperation with Operations, Maintenance, Quality and other departments to ensure goals and objectives are met.

Job description

About Commonwealth Fusion Systems:

Commonwealth Fusion Systems is on a mission to deliver the urgent transition to fusion energy. Combining decades of research, top talent, and new technologies, we're designing and building commercially viable fusion power plants. And we're working with policymakers and suppliers to build the energy industry of the future. We're in the best position to make it happen. Since 2018, we've raised nearly $3 billion in capital, making us the largest and leading private fusion company in the world. Now we're looking for more thinkers, doers, builders, and makers to join us. People who'll bring new perspectives, solve tough problems, and thrive as part of a team. If that's you and this role fits, we want to hear from you.

Join the power movement as a Production Technician

The production technician is an integral part of the CFS team performing and monitoring the manufacturing processes required to build and test superconducting magnets. You will have the opportunity to work within a fast-paced, exciting atmosphere to help the team meet the global necessity for clean energy. Ensures functional operation and preventative maintenance of equipment and continuous improvement. Responsibilities include close cooperation with Operations, Maintenance, Quality and other departments to ensure goals and objectives are met. This role will lead the way to making Earth sustainable for the future to come.

This production technician position requires 6+ years' experience in electro mechanical assembly.

Hours: 6:00 am - 6:00 pm

Work Friday, Saturday, Sunday

Rate of pay: $30 - $41 per hour + 15% differential

Job posting details for Production Technician - Weekend - First Shift (Fri, Sat, Sun) at Commonwealth Fusion Systems in Devens, MA. Compensation / salary range: 30 - 41 USD, hourly. ClimateTechList gathers 21,000+ job openings from over 938 climate tech companies and updates them daily.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Production Technician - Weekend - Second Shift (Fri, Sat, Sun)
Production Technician - Weekend - Second Shift (Fri, Sat, Sun)

Commonwealth Fusion Systems • Harvard (MA)

On-site
USD 41,000 - 56,000
Production Technician - First Shift
Production Technician - First Shift

Commonwealth Fusion Systems • Somerville (MA)

On-site
USD 41,328 - 56,481
Production Technician Contractor - Second Shift
Production Technician Contractor - Second Shift

Commonwealth Fusion Systems • Somerville (MA)

On-site
USD 41,000 - 56,000
Lead Production Technician - First Shift
Lead Production Technician - First Shift

Commonwealth Fusion Systems • Somerville (MA)

On-site
USD 44,000 - 72,000
Lead Production Technician - Third Shift
Lead Production Technician - Third Shift

Commonwealth Fusion Systems • Somerville (MA)

On-site
USD 44,000 - 72,000
Lead Production Technician - Second Shift
Lead Production Technician - Second Shift

Commonwealth Fusion Systems • Somerville (MA)

On-site
USD 44,000 - 72,000
10% differential
Competitive hourly pay
Production Technician Contractor
Production Technician Contractor

Commonwealth Fusion Systems • Somerville (MA)

On-site
USD 41,000 - 56,000
Production Technician - First Shift
Production Technician - First Shift

Cfsenergy • Harvard (MA)

On-site
USD 41,000 - 56,000
Equity
Health, dental, and vision insurance
401(k) with employer matching
+5
Production Technician - Second Shift
Production Technician - Second Shift

Cfsenergy • Harvard (MA)

On-site
USD 41,000 - 56,000
Equity
Health insurance
Dental insurance
+5
Production Technician - Third Shift
Production Technician - Third Shift

Cfsenergy • Harvard (MA)

On-site
USD 41,000 - 56,000
Health insurance
Dental insurance
Vision insurance
+5