Get a reply from this employer
Your resume and cover letter, tailored to exactly what they’re hiring for.
Toray Advanced Composites in Fairfield, CA is seeking a Production Scheduler/Planner I to develop production schedules for assigned equipment, coordinate with procurement, and issue shop floor work orders. You will monitor material availability and adjust plans to meet customer commitments while minimizing inventory.
The role requires at least a high school diploma with 3+ years in production/inventory control; APICS certification is a strong plus.
If you are unable to complete this application due to a disability, contact this employer to ask for an accommodation or an alternative application process.
Full Time Fairfield, CA, US
4 days ago Requisition ID: 1737
Salary Range: $27.50 To $35.00 Hourly
Toray Advanced Composites (TAC) is a leading supplier of advanced composite materials for the aerospace, sporting goods, motorsport, and industrial markets. You will find our thermoset composite products on nearly every satellite, space launch vehicle, unmanned aircraft, military and commercial aircraft in production today. TAC also provides composites materials to industrial and recreational applications including mountain bikes, medical prosthetics, and sports equipment.
Our thermoplastic prepregs, known in the industry as Cetex®, are found in a wide range of commercial and military aircraft, including large wing structures and interior applications like seats and galleys. Our Cetex® products are available in unidirectional tape or fabric form in a variety of engineered thermoplastic resins including PEEK, PPS, PEI as well as a full line of performance thermoplastics including Nylon, PET, HDPE, and PP.
The Scheduler/Planner 1 is responsible developing production schedules for assigned production equipment, expediting production as necessary, determining time-phased raw material requirements and providing them to procurement, generating all required shop floor production work orders, and providing status of assigned open orders to others as needed. The Scheduler/Planner 1 reviews current schedules and work orders while making recommendations to help determine what resources (i.e. materials, labor, outside processing, and equipment) are required and how to allocate them to achieve optimum manufacturing efficiencies. When changes arise, the Scheduler/Planner 1 must revise production schedules and communicate any changes that will negatively affect any internal departments and the end customer. This requires coordination with supervisors and other employees, vendors and customers.