Principal Data Center Construction Manager

Oracle

Abilene (TX)

On-site

USD 102,000 - 210,000

Full time

20 hours ago
Be an early applicant
Application generator

An application made for this job — a tailored resume and cover letter that speak straight to the posting.

Get past ATS filters

Job summary

Oracle Cloud Infrastructure (OCI) — Data Center Infrastructure Delivery is seeking a Senior Data Center MEP PM to lead field-based management of MEP systems for large hyperscale data center projects in the Abilene/Shackelford, Texas area.

The role emphasizes electrical and mechanical MEP delivery, schedule tracking, QA/QC, and coordination with internal teams, contractors, and vendors to ensure safety, quality, and on-time turnover to Oracle standards.

Qualifications

  • 5+ years of experience delivering data center, hyperscale, or mission‑critical construction projects.
  • Direct experience supporting MEP construction on data centers or mission‑critical infra projects.
  • Experience with electrical MEP systems including medium‑voltage, switchgear, UPS, generators, and power distribution.
  • Mechanical data center experience such as cooling, CRAH/CRAC, piping, pumps, and fire protection.
  • Experience on hyperscale data center projects and strong knowledge of project execution, QA/QC, scheduling, and issue resolution.

Responsibilities

  • Provide field-based PM support for MEP systems on hyperscale data center projects.
  • Coordinate with contractors, vendors, QA/QC, and commissioning teams to monitor MEP scope.
  • Support delivery of electrical and mechanical systems including power, cooling, and controls.
  • Track schedules, milestones, risks, and dependencies for MEP construction activities.
  • Review installations, documentation, punch lists, and non-conformance issues.
  • Coordinate RFIs, submittals, and change orders with stakeholders.
  • Participate in MEP coordination meetings, look‑ahead planning, and commissioning readiness.
  • Communicate project status, risks, and critical issues to Oracle sponsors.
  • Promote safety culture and ensure alignment with Oracle safety standards.
  • Assist in ensuring infrastructure meets performance, reliability, and operational readiness.

Skills

MEP coordination
Project management
Data center delivery
Electrical systems
Mechanical systems
QA/QC processes
Scheduling
Stakeholder communication
Reading drawings

Education

Bachelor’s degree in Electrical Engineering/Mechanical Engineering/Construction Management

Tools

Procore
Primavera
MS Project
Autodesk Construction Cloud
Bluebeam
SharePoint
Aconex

Job description

Oracle Cloud Infrastructure (OCI) — Data Center Infrastructure Delivery
Job Description
About the Role:

Oracle Cloud Infrastructure (OCI) — Data Center Infrastructure Delivery

Location

Abilene / Shackelford, Texas area

Work Location Requirement

This role is expected to be approximately 85% on-site at the Abilene/Shackelford data center location.

Oracle Cloud Infrastructure (OCI) is seeking a Senior Data Center MEP PM to support the delivery of large-scale data center infrastructure in the Abilene/Shackelford, Texas area. This role will be part of the OCI Data Center Infrastructure Delivery organization and will help drive the successful execution of mission‑critical mechanical, electrical, and plumbing systems across hyperscale data center construction projects.

The Senior Data Center MEP PM will work closely with internal Oracle teams, construction partners, developer‑led construction teams, QA/QC oversight teams, design consultants, commissioning agents, contractors, vendors, and other key stakeholders to ensure that MEP scope is delivered safely, on schedule, within quality expectations, and aligned with Oracle’s infrastructure standards.

This role may be suited for candidates with either an electrical or mechanical background, with strong preference for experience managing electrical MEP systems in data center or mission‑critical environments.

Responsibilities

Responsibilities include:

  • Provide field-based project management support for MEP systems on hyperscale data center construction projects.
  • Work closely with construction teams, developer representatives, QA/QC oversight teams, general contractors, trade partners, and vendors to monitor execution of MEP scope.
  • Support delivery of electrical and/or mechanical systems, including power distribution, switchgear, UPS systems, generators, cooling systems, piping, controls, fire protection, and associated infrastructure.
  • Track project schedule, milestones, constraints, risks, and dependencies related to MEP construction activities.
  • Review and monitor installation quality, field progress, construction documentation, issue resolution, and punch-list closure.
  • Partner with QA/QC teams to support inspections, documentation, non-conformance tracking, corrective actions, and quality verification.
  • Coordinate with commissioning teams to ensure systems are installed, tested, and turned over in accordance with project requirements.
  • Identify risks, blockers, design conflicts, constructability issues, and schedule impacts; elevate issues with clear recommendations.
  • Support review of RFIs, submittals, change impacts, field directives, and technical coordination items.
  • Participate in construction meetings, MEP coordination meetings, look‑ahead planning sessions, QA/QC reviews, and commissioning readiness discussions.
  • Maintain clear communication with Oracle stakeholders regarding project status, progress, risks, and critical issues.
  • Promote a strong safety culture and support compliance with site safety expectations and construction best practices.
  • Help ensure data center infrastructure is delivered to Oracle’s performance, reliability, quality, and operational readiness standards.
Qualifications
  • 5+ years of experience in data center, hyperscale, mission‑critical, industrial, or large‑scale construction project delivery.
  • Direct experience supporting MEP construction on data center or mission‑critical infrastructure projects.
  • Experience with electrical MEP systems such as medium‑voltage distribution, switchgear, UPS, generators, transformers, power distribution, grounding, controls, and related systems.
  • Mechanical background may also be considered with relevant data center MEP experience, including cooling, chilled water, CRAH/CRAC, piping, pumps, air handling, fire protection, or controls.
  • Prior experience working on hyperscale data center projects is required.
  • Strong understanding of construction project execution, field coordination, QA/QC processes, schedule tracking, and issue resolution.
  • Experience working with general contractors, trade contractors, construction managers, developers, design teams, vendors, and commissioning teams.
  • Ability to read and interpret construction drawings, specifications, schedules, submittals, RFIs, and technical documentation.
  • Strong communication skills with the ability to clearly summarize project risks, issues, status, and next steps.
  • Demonstrated ability to work in a fast‑paced construction environment with multiple stakeholders and competing priorities.
  • Must be willing and able to work approximately 85% on‑site in the Abilene/Shackelford, Texas area.
  • Ability to travel locally as needed to support project execution, vendor coordination, or stakeholder meetings.
Preferred Qualifications
  • Bachelor’s degree in Electrical Engineering, Mechanical Engineering, Construction Management, or a related technical field.
  • Strong electrical background with experience in data center power infrastructure, including utility coordination, medium‑voltage systems, backup power, redundancy, and commissioning.
  • Experience with hyperscale cloud, colocation, or large enterprise data center construction.
  • Familiarity with data center commissioning levels, integrated systems testing, turnover packages, and operational readiness requirements.
  • Experience with construction reporting tools, scheduling platforms, document control systems, and issue tracking processes such as Procore, Autodesk Construction Cloud, Primavera P6, Microsoft Project, Aconex, Bluebeam, SharePoint, or similar tools.
  • Experience managing or supporting QA/QC processes, inspection readiness, non‑conformance resolution, and punch‑list management.
  • Knowledge of construction safety practices, electrical safety, lockout/tagout awareness, and mission‑critical site protocols.
  • PMP, CCM, PE, LEED, or other relevant professional certification.
  • Experience working with developer‑led construction delivery models.
  • Ability to influence without direct authority and drive alignment across internal teams, contractors, vendors, and external partners.
  • Strong analytical, organizational, and problem‑solving skills with the ability to operate independently as a senior individual contributor.
Disclaimer

Certain U.S. based or U.S. customer or client‑facing roles may be required to comply with applicable requirements, such as immunization/occupational health mandates, and/or drug testing requirements.

Range and benefit information provided in this posting are specific to the stated locations only

US: Hiring Range in USD from: $102,300 - $209,500 per year. May be eligible for bonus and equity.

Oracle maintains broad salary ranges for its roles in order to account for variations in knowledge, skills, experience, market conditions and locations, as well as reflect Oracle's differing products, industries and lines of business.

Candidates are typically placed into the range based on the preceding factors as well as internal peer equity.

Oracle US offers a comprehensive benefits package which includes the following:
  • Medical, dental, and vision insurance, including expert medical opinion
  • Short term disability and long term disability
  • Life insurance and AD&D
  • Supplemental life insurance (Employee/Spouse/Child)
  • Health care and dependent care Flexible Spending Accounts
  • Pre‑tax commuter and parking benefits
  • 401(k) Savings and Investment Plan with company match
  • Paid time off: Flexible Vacation is provided to all eligible employees assigned to a salaried (non‑overtime eligible) position. Accrued Vacation is provided to all other employees eligible for vacation benefits. For employees working at least 35 hours per week, the vacation accrual rate is 13 days annually for the first three years of employment and 18 days annually for subsequent years of employment. Vacation accrual is prorated for employees working between 20 and 34 hours per week. Employees working fewer than 20 hours per week are not eligible for vacation.
  • 11 paid holidays
  • Paid sick leave: 72 hours of paid sick leave upon date of hire. Refreshes each calendar year. Unused balance will carry over each year up to a maximum cap of 112 hours.
  • Paid parental leave
  • Adoption assistance
  • Employee Stock Purchase Plan
  • Financial planning and group legal
  • Voluntary benefits including auto, homeowner and pet insurance

As part of Oracle's onboarding process and consistent with applicable law, US-based employees are required to complete identity verification, which involves the collection and processing of their biometric information. Accommodations to this requirement may be granted following an individualized assessment.

About Us

Only Oracle brings together the data, infrastructure, applications, and expertise to power everything from industry innovations to life‑saving care. And with AI embedded across our products and services, we help customers turn that promise into a better future for all. Discover your potential at a company leading the way in AI and cloud solutions that impact billions of lives.

True innovation starts when everyone is empowered to contribute. That’s why we’re committed to growing a workforce that promotes opportunities for all with competitive benefits that support our people with flexible medical, life insurance, and retirement options. We also encourage employees to give back to their communities through our volunteer programs.

We’re committed to including people with disabilities at all stages of the employment process. If you require accessibility assistance or accommodation for a disability at any point, let us know by emailing accommodation-request_mb@oracle.com or by calling 1-888-404-2494 in the United States.

Oracle is an Equal Employment Opportunity Employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, sexual orientation, gender identity, disability and protected veterans’ status, or any other characteristic protected by law. Oracle will consider for employment qualified applicants with arrest and conviction records pursuant to applicable law.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Sr. Data Center MEP PM
Sr. Data Center MEP PM

Oracle • Town of Texas (WI)

On-site
USD 102,000 - 210,000
Relocation bonus
Bonus eligibility
Principal Data Center Construction Manager
Principal Data Center Construction Manager

Ll Oefentherapie • Abilene (TX)

On-site
USD 102,000 - 210,000
Medical insurance
401(k) plan
Paid time off
+1
Sr. Manager, Data Center Construction Management
Sr. Manager, Data Center Construction Management

Ll Oefentherapie • Abilene (TX)

On-site
USD 126,000 - 264,000
Medical, dental, vision coverage
401(k) with company match
Paid time off
Sr. Manager, Data Center Construction Management
Sr. Manager, Data Center Construction Management

Oracle • Town of Texas (WI)

On-site
USD 126,000 - 264,000
Relocation assistance
Comprehensive benefits package
Annual bonus potential
+1
Principal Data Center Fiber Deployment
Principal Data Center Fiber Deployment

Ll Oefentherapie • Abilene (TX)

On-site
USD 102,000 - 210,000
Health insurance
401(k) plan
Paid time off
Senior Data Center Project Manager, Special Projects (Nashville, TN)
Senior Data Center Project Manager, Special Projects (Nashville, TN)

Oracle • Nashville (TN)

On-site
USD 115,000 - 235,000
Medical insurance
401(k) match
Paid time off
+1
Lead Principal Data Center Project Controls
Lead Principal Data Center Project Controls

Ll Oefentherapie • Abilene (TX)

On-site
USD 126,000 - 264,000
Principal Data Center Construction Manager
Principal Data Center Construction Manager

Ll Oefentherapie • United States

On-site
USD 126,000 - 264,000
Medical insurance
Dental and vision insurance
401(k) with company match
+1
Principal Data Center Design Electrical Engineer
Principal Data Center Design Electrical Engineer

Oracle • United States

On-site
USD 115,000 - 235,000
Medical, dental, and vision insurance
Short term and long term disability
Life insurance and AD&D
+2
Senior Manager, Data Center Construction, Integration & Handover - Saline, MI
Senior Manager, Data Center Construction, Integration & Handover - Saline, MI

Oracle • Michigan

On-site
USD 126,200 - 264,100
Medical insurance
Dental insurance
Vision insurance
+2