Pipe Layer - Water & Sewer Utilities (Overtime)

J+M Infrastructure

Madison Heights (VA)

On-site

USD 22,041 - 31,684

Full time

14 days+
Application generator

Get a reply from this employer — a resume and cover letter tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

J+M Infrastructure in Madison Heights, Virginia, is seeking a skilled Pipe Layer to focus on installing water mains, sewer, and storm drainage systems. The ideal candidate will bring previous construction experience, a valid driver’s license, and the ability to lift heavy materials.

This role emphasizes a strong work ethic and safety awareness, with the expectation to work overtime on Saturdays. Candidates should be motivated, willing to learn, and able to successfully pass drug screenings and background checks.

Qualifications

  • Experience installing Water mains, Gravity Sewer, Storm Drainage, Conduits & Duct Banks.
  • Valid driver's license and own transportation to job sites required.
  • Must pass a drug test/screening and background check.

Responsibilities

  • Install Water mains, Gravity Sewer, and Storm Drainage systems.
  • Perform general construction tasks and maintain site safety.
  • Work overtime on Saturdays as needed.

Skills

Previous construction experience
Ability to lift 60lbs
Ability to read a tape measure
Willing to learn

Job description

J+M Infrastructure in Madison Heights, Virginia, is seeking a skilled Pipe Layer to focus on installing water mains, sewer, and storm drainage systems. The ideal candidate will bring previous construction experience, a valid driver’s license, and the ability to lift heavy materials.

This role emphasizes a strong work ethic and safety awareness, with the expectation to work overtime on Saturdays. Candidates should be motivated, willing to learn, and able to successfully pass drug screenings and background checks.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Pipe Layer - Water & Sewer Utilities (Overtime)
Pipe Layer - Water & Sewer Utilities (Overtime)

J+M Infrastructure • Amherst (VA)

On-site
Pipe Layer - Water & Sewer Utilities (Overtime)
Pipe Layer - Water & Sewer Utilities (Overtime)

J+M Infrastructure • Lynchburg (VA)

On-site
Pipe Layer - Water & Sewer Utilities (Overtime)
Pipe Layer - Water & Sewer Utilities (Overtime)

J+M Infrastructure • Richmond (VA)

On-site
USD 22,041 - 31,684
Pipe Layer: Water & Sewer Utilities (Overtime)
Pipe Layer: Water & Sewer Utilities (Overtime)

J+M Infrastructure • United States

On-site
USD 22,000 - 32,000
Pay: $16-23 per hour DOE
Pipe Layer - Water & Sewer Utilities (Overtime)
Pipe Layer - Water & Sewer Utilities (Overtime)

Infrastructure LLC • Madison Heights (VA)

On-site
Pipe Layer - Water & Sewer Utilities (Overtime)
Pipe Layer - Water & Sewer Utilities (Overtime)

Infrastructure LLC • Charlottesville (VA)

On-site
Pipe Layer: Civil Construction (Overtime)
Pipe Layer: Civil Construction (Overtime)

J+M Infrastructure • Forest (VA)

On-site
Pipe Layer - Water & Sewer Utilities (Overtime)
Pipe Layer - Water & Sewer Utilities (Overtime)

J+M Infrastructure • Forest (VA)

On-site
Pipe Layer: Water & Sewer Installations | Overtime
Pipe Layer: Water & Sewer Installations | Overtime

Energy Jobline ZR • Amherst (MA)

On-site
USD 22,000 - 32,000
Pipe Layer - Water & Sewer Utilities (Overtime)
Pipe Layer - Water & Sewer Utilities (Overtime)

J+M Infrastructure • Durham (NC)

On-site
USD 22,041 - 31,684