Pipe Layer - Water & Sewer Utilities (Overtime)

Infrastructure LLC

Lynchburg (VA)

On-site

USD 22,041 - 31,684

Full time

14 days+

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

Infrastructure LLC in Lynchburg, Virginia, is currently seeking a motivated Pipe Layer. The ideal candidate should have experience with Water mains, Gravity Sewer, Storm Drainage, and must be able to perform physically demanding tasks.

Pay ranges from $16 to $23 per hour, depending on experience. Candidates must have previous construction experience, valid driver's license, personal transportation, and a positive attitude.

Qualifications

  • Previous construction experience required.
  • Valid driver's license and personal transportation are mandatory.
  • Ability to lift 60 lbs and perform physical tasks.

Responsibilities

  • Install Water mains, Ductile & PVC, Gravity Sewer, and Storm Drainage.
  • Ensure safe work practices and pass drug testing.
  • Work overtime if necessary on Saturdays.

Skills

Water mains installation
Gravity Sewer installation
Storm Drainage installation
Ductile & PVC pipes installation
Heavy lifting (60 lbs)
Reading a tape measure

Job description

Infrastructure LLC in Lynchburg, Virginia, is currently seeking a motivated Pipe Layer. The ideal candidate should have experience with Water mains, Gravity Sewer, Storm Drainage, and must be able to perform physically demanding tasks.

Pay ranges from $16 to $23 per hour, depending on experience. Candidates must have previous construction experience, valid driver's license, personal transportation, and a positive attitude.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Pipe Layer - Water & Sewer Utilities (Overtime)
Pipe Layer - Water & Sewer Utilities (Overtime)

J+M Infrastructure • Lynchburg (VA)

On-site
USD 22,041 - 31,684
Pipe Layer - Water & Sewer Utilities (Overtime)
Pipe Layer - Water & Sewer Utilities (Overtime)

Infrastructure LLC • Virginia (MN)

On-site
USD 22,041 - 31,684
Pipe Layer - Water & Sewer Utilities (Overtime)
Pipe Layer - Water & Sewer Utilities (Overtime)

Infrastructure LLC • Forest (VA)

On-site
USD 22,041 - 31,684
Pipe Layer - Water & Sewer Utilities (Overtime)
Pipe Layer - Water & Sewer Utilities (Overtime)

Infrastructure LLC • Charlottesville (VA)

On-site
USD 22,041 - 31,684
Pipe Layer: Civil Construction (Overtime)
Pipe Layer: Civil Construction (Overtime)

Infrastructure LLC • Madison Heights (VA)

On-site
USD 22,041 - 31,684
Pipe Layer - Water & Sewer Utilities (Overtime)
Pipe Layer - Water & Sewer Utilities (Overtime)

Infrastructure LLC • Madison Heights (VA)

On-site
USD 22,041 - 31,684
Pipe Layer: Civil Construction (Overtime)
Pipe Layer: Civil Construction (Overtime)

Infrastructure LLC • Forest (VA)

On-site
USD 22,041 - 31,684
Pipe Layer - Water Mains & Sewer Installations
Pipe Layer - Water Mains & Sewer Installations

Infrastructure LLC • Richmond (VA)

On-site
USD 22,041 - 31,684
Pipe Layer: Civil Construction (Overtime)
Pipe Layer: Civil Construction (Overtime)

Infrastructure LLC • Virginia (MN)

On-site
USD 22,041 - 31,684
Pipe Layer - Civil Construction | Groundwork & Utilities
Pipe Layer - Civil Construction | Groundwork & Utilities

Infrastructure LLC • Richmond (VA)

On-site
USD 22,041 - 31,684