Pipe Layer: Precision Underground Utility Installations

Phillips Infrastructure

Palm Coast (FL)

On-site

USD 40,000 - 68,000

Full time

11 days ago

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

Phillips Infrastructure in Palm Coast, FL is seeking a Pipe Layer to join our construction crew. You will install water, sewer, and drainage pipes with precise alignment and grade, following project plans and specifications.

The role requires safe work practices, ability to read blueprints, teamwork, and effective communication with the crew and foreman across varying weather and job sites.

Qualifications

  • Proven experience as a Pipe Layer in the construction industry.
  • Proficiency in pipe installation techniques, including bedding and backfilling.
  • Knowledge of construction plans, blueprints, and underground utility installation procedures.
  • Strong commitment to safety and adherence to safety protocols.
  • Excellent teamwork and communication skills.
  • Willingness to work in varying weather conditions and at different job sites.

Responsibilities

  • Install pipes according to project plans, blueprints, and design specifications, ensuring proper alignment and grade.
  • Strictly adhere to safety procedures and guidelines for a safe working environment and regulatory compliance.
  • Assist in trenching and excavation tasks as needed to prepare the work area.
  • Safely handle pipes, materials, and equipment and position them for installation.
  • Ensure bedding and backfill meet project standards and design specifications.
  • Collaborate with the pipe crew, foreman, and other team members to coordinate activities.
  • Maintain clear communication with team members and supervisors, reporting progress or issues as needed.
  • Identify and address operational challenges during pipe laying and related tasks.
  • Assist in maintenance of tools and equipment used for pipe installation.

Skills

Pipe laying experience
Blueprints interpretation
Safety awareness
Teamwork
Communication
Weather adaptability

Job description

Phillips Infrastructure in Palm Coast, FL is seeking a Pipe Layer to join our construction crew. You will install water, sewer, and drainage pipes with precise alignment and grade, following project plans and specifications.

The role requires safe work practices, ability to read blueprints, teamwork, and effective communication with the crew and foreman across varying weather and job sites.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Pipe Layer: Precise Underground Utility Installations
Pipe Layer: Precise Underground Utility Installations

Phillips Infrastructure • Orlando (FL)

On-site
USD 25,000 - 39,000
Pipe Layer — Precise Underground Water & Sewer Installations
Pipe Layer — Precise Underground Water & Sewer Installations

Phillips Infrastructure • Jacksonville (FL)

On-site
USD 30,000 - 47,000
Precision Pipe Layer – Underground Utility Installations
Precision Pipe Layer – Underground Utility Installations

Phillips Infrastructure • Lakeland (FL)

On-site
USD 42,000 - 65,000
Underground Pipe Layer: Precision & Safety Installations
Underground Pipe Layer: Precision & Safety Installations

Phillips, Inc. • Orlando (FL)

On-site
USD 52,000 - 78,000
Underground Pipe Layer: Precise Installations & Safety
Underground Pipe Layer: Precise Installations & Safety

Phillips Infrastructure • Bartow (FL)

On-site
USD 28,000 - 41,000
Pipe Layer (Underground Utility)
Pipe Layer (Underground Utility)

Phillips Inc • Palm Coast (FL)

On-site
USD 35,000 - 60,000
Pipe Layer (Underground Utility)
Pipe Layer (Underground Utility)

Phillips Inc • Jacksonville (FL)

On-site
USD 55,000 - 85,000
Pipe Layer (Underground Utility)
Pipe Layer (Underground Utility)

Phillips Inc • Lakeland (FL)

On-site
USD 40,000 - 64,000
Pipe Layer (Underground Utility)
Pipe Layer (Underground Utility)

Phillips, Inc. • Orlando (FL)

On-site
USD 52,000 - 78,000
Pipe Layer (Underground Utility)
Pipe Layer (Underground Utility)

Phillips, Inc. • Orangeburg (SC)

On-site
USD 40,000 - 66,000