Night Shift Field Engineer — Construction Scheduling

JF White

Kennewick (WA)

Presencial

USD 70.000 - 80.000

Jornada completa

14 días+

Consigue una respuesta de este empleador

Tu currículum y tu carta de presentación, adaptados exactamente a lo que buscan contratar.

Supera los filtros ATS

Descripción de la vacante

JF White is seeking a Field Engineer for night shift operations to support construction activities, ensuring efficient execution and adherence to project specifications. You will coordinate with night shift foremen and superintendents, track plans, and report daily quantities installed and performed.

Responsibilities include analyzing budgeted vs. actual production rates, performing quantity take-offs, maintaining project logs, and developing Look-Ahead schedules with the project superintendent.

Formación

  • Bachelor’s degree in Civil Engineering, Construction Management, or related field preferred.
  • Experience of 2+ years in a similar role preferred.
  • Experience in night shift construction operations is a plus.
  • Foundational knowledge of drawing and specifications, estimating and CPM scheduling preferred.
  • Strong MS Excel, Outlook, Word, and PowerPoint skills.
  • Ability to multi-task, work independently, and drive efficiency in night operations.
  • Valid driver’s license for occasional required travel.
  • Strong problem-solving skills with the ability to analyze data and make informed decisions.
  • Moderate physical activity, including maneuvering on construction sites in various weather conditions.
  • Manual dexterity to handle construction-related tasks.

Responsabilidades

  • Collaborate with night shift foremen and superintendents to track and analyze work plans for maximum efficiency in field operations.
  • Develop, maintain, and report daily quantities installed and performed.
  • Analyze and compare budgeted vs. actual production rates and material yield.
  • Perform quantity take-offs from plans and contrast weekly field quantities with planned quantities.
  • Assist in developing Work Activity Plans and ensuring adherence to project standards.
  • Provide monthly quantity reports for verification and billing.
  • Ensure that night shift fieldwork is constructed within project specifications.
  • Support project engineers and superintendents as required.
  • Maintain and organize Plan Drawings, Revisions, and As-Builts.
  • Assist in maintaining all Project Logs.
  • Monitor and compare ordered materials vs. budgeted quantities.
  • Maintain a Daily Diary and provide schedule updates to the Project Engineer.
  • Initiate, drive, and control Field Operations Reports.
  • Develop Look-Ahead Schedules with the project superintendent.
  • Present information effectively in one-on-one and small group settings, including managers and employees.
  • Read and interpret documents such as safety rules, operating and maintenance instructions, procedure manuals, contracts, subcontracts, and purchase orders.
  • Perform additional duties as assigned.

Conocimientos

Multi-tasking
Problem solving
Drive efficiency
Team coordination
Valid driver’s license

Educación

Bachelor’s degree in Civil Engineering or related field
2+ years of experience in a similar role

Herramientas

MS Excel
MS Outlook
MS Word
MS PowerPoint

Descripción del empleo

JF White is seeking a Field Engineer for night shift operations to support construction activities, ensuring efficient execution and adherence to project specifications. You will coordinate with night shift foremen and superintendents, track plans, and report daily quantities installed and performed.

Responsibilities include analyzing budgeted vs. actual production rates, performing quantity take-offs, maintaining project logs, and developing Look-Ahead schedules with the project superintendent.

Consigue la evaluación confidencial y gratuita de tu currículum.

o arrastra y suelta tu archivo aquí

Similar jobs

Puestos de trabajo similares que vale la pena comparar

Night Shift Field Engineer – Construction Ops & Reporting
Night Shift Field Engineer – Construction Ops & Reporting

Dragados • Kennewick (WA)

Presencial
USD 70.000 - 80.000
Night Shift Field Engineer: Construction Ops & Reporting
Night Shift Field Engineer: Construction Ops & Reporting

J.F. White Contracting • Boston (MA)

Presencial
USD 70.000 - 80.000
Night Field Engineer: Construction Ops & Analytics
Night Field Engineer: Construction Ops & Analytics

J.F. White Contracting Co. • Boston (MA)

Presencial
USD 70.000 - 80.000
Field Engineer
Field Engineer

J.F. White Contracting Co. • Boston (MA)

Presencial
USD 70.000 - 80.000
Field Engineer
Field Engineer

Dragados • Kennewick (WA)

Presencial
USD 70.000 - 80.000
Field Engineer
Field Engineer

JF White • Kennewick (WA)

Presencial
USD 70.000 - 80.000
Field Engineer
Field Engineer

J.F. White Contracting • Boston (MA)

Presencial
USD 70.000 - 80.000
Night Shift Site Construction Leader
Night Shift Site Construction Leader

Worley Group, Inc • Brownsville (TX)

Presencial
USD 100.000 - 150.000
Paid time off
Holiday pay
Medical insurance
+3
Night Shift Site Construction Lead
Night Shift Site Construction Lead

Worley • Brownsville (TX)

Presencial
USD 120.000 - 170.000
Paid time off
Holiday pay
Medical insurance
+4
Field Engineer (night shift) - Data Center Construction
Field Engineer (night shift) - Data Center Construction

Sundt Gmbh • Temple (TX)

Presencial
USD 55.000 - 70.000