Mining Data Center Technician - 12-Hour Shifts

Bitdeer Technologies Group

Rockdale (TX)

On-site

USD 25,000 - 36,000

Full time

7 days ago
Be an early applicant

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

Bitdeer Technologies Group in Rockdale, TX seeks an Operations Technician to install, troubleshoot, repair, and maintain production and facility equipment in our mining data center. This is a physical, hands-on role working directly on machines on the floor.

We operate a compressed weekly schedule with 12-hour shifts (Sun–Wed or Wed–Sat). Night shifts include a $2/hour differential. The position is full-time with a 6-month probation period and background checks are required.

Qualifications

  • High School diploma or GED equivalent.
  • Solid mechanical aptitude and comfort working with hands.
  • Proficiency with standard software tools (MS Office/Outlook/Docs).
  • Ability to learn and analyze quickly in a dynamic mining environment.

Responsibilities

  • Diagnose problems, replace or repair parts, and test/adjust equipment with time-sensitive urgency.
  • Install and maintain production machines and plant facility equipment.
  • Provide emergency/unscheduled repairs and scheduled maintenance.
  • Physically supervise mining machines and network equipment.
  • Operate and manage cooling/heating systems daily.
  • Assist with replacement machine configuration and deployment.
  • Respond to power failures, network issues, and overheating events to keep machines running.

Skills

Mechanical aptitude
Hands-on
Good communication
Physical stamina

Education

High School diploma or GED equivalent

Tools

Microsoft Office
Outlook
Google Docs
Inventory management software
Machine monitoring software

Job description

Bitdeer Technologies Group in Rockdale, TX seeks an Operations Technician to install, troubleshoot, repair, and maintain production and facility equipment in our mining data center. This is a physical, hands-on role working directly on machines on the floor.

We operate a compressed weekly schedule with 12-hour shifts (Sun–Wed or Wed–Sat). Night shifts include a $2/hour differential. The position is full-time with a 6-month probation period and background checks are required.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Hands-On Operations Tech for Mining Data Center 12h Shifts
Hands-On Operations Tech for Mining Data Center 12h Shifts

Bitdeer Technologies Group • Rockdale (TX)

On-site
USD 42,000 - 56,000
Shift differential $2/hour
Compressed work week
Mining Data Center Technician — 12-Hour Shifts (Day/Night)
Mining Data Center Technician — 12-Hour Shifts (Day/Night)

Bitdeer Technologies Group • Rockdale (TX)

On-site
USD 60,000 - 78,000
Operations Technician
Operations Technician

Bitdeer Technologies Group • Rockdale (TX)

On-site
USD 60,000 - 78,000
Operations Technician (Mining Data Center)
Operations Technician (Mining Data Center)

Bitdeer Technologies Group • Rockdale (TX)

On-site
USD 25,000 - 36,000
Mining Data Center Technician — Hands-On Ops
Mining Data Center Technician — Hands-On Ops

Bitdeer Technologies Group • Georgia

On-site
USD 40,000 - 65,000
Operations Technician (Mining Data Center)
Operations Technician (Mining Data Center)

Bitdeer Technologies Group • Georgia

On-site
USD 40,000 - 65,000
Operations Technician (Mining Data Center)
Operations Technician (Mining Data Center)

Bitdeer Technologies Group • Rockdale (TX)

On-site
USD 42,000 - 56,000
Shift differential $2/hour
Compressed work week
Onsite Bitcoin Miner Technician (12h Shifts)
Onsite Bitcoin Miner Technician (12h Shifts)

Riot Platforms, Inc. • Rockdale (TX)

On-site
USD 25,000 - 44,000
401(k) retirement plan with generous 2
Comprehensive health coverage options
Paid time off and floating holidays
+1
On-Site Mining Technician: Install & Maintain Bitcoin Miners
On-Site Mining Technician: Install & Maintain Bitcoin Miners

Riot Platforms • Rockdale (TX)

On-site
USD 60,000 - 90,000
401(k) matching retirement plan
Company health coverage
Paid time off and floating holidays
+1
Data Center Technician I – Onsite Mining Hardware
Data Center Technician I – Onsite Mining Hardware

Hut 8 • Odessa (TX)

On-site
USD 32,000 - 48,000