MEP Quality Program Manager (Data Center Construction) - El Paso

TEKsystems

Canutillo (TX)

Presencial

USD 83.000 - 124.000

Jornada completa

hace 37 horas
Sé de los primeros/as/es en solicitar esta vacante

Una candidatura completa en un minuto

Currículum y carta de presentación personalizados, listos para enviar.

Supera los filtros ATS

Ventajas ofrecidas por este puesto de trabajo

Per Diem

Descripción de la vacante

TEKsystems is seeking a MEP Quality Program Manager for a large hyperscale data center campus in El Paso, TX. You will support the site QA/QC program across active construction areas, coordinating inspectors and quality SMEs to prioritize issues that impact safety, reliability, commissioning, and turnover.

You will lead or support NCRs, root-cause analysis, and corrective actions, while reviewing drawings/submittals and ensuring alignment with design intent.

Formación

  • Demonstrated experience managing inspectors, quality professionals, or discipline-specific SMEs on active construction projects.
  • Proven experience leading or supporting a site-level QA/QC program, not only performing inspections.
  • Direct data center construction experience strongly preferred, particularly on hyperscale or large mission-critical campuses.

Responsabilidades

  • Support the site Quality Manager in leading and coordinating discipline-specific inspectors and quality SMEs across active construction areas.
  • Prioritize quality findings based on safety, reliability, commissioning impact, schedule risk, and operational readiness.
  • Distinguish critical issues from routine deficiencies and recommend appropriate mitigation strategies.
  • Communicate quality risks, recommendations, and escalation requirements to site leadership.

Conocimientos

Site-level QA leadership
Risk-based QA decisions
DC QA/QC & commissioning

Herramientas

ACC/BIM 360
Procore
CxAlloy

Descripción del empleo

Owner: Meta


Company: TEKsystems (Third-Party Owners Rep)


Title: MEP Quality Program Manager


Location: El Paso, TX


Duration: 30+ months


Contract Type: W2


Compliance: Willing to consent to background check


Start Date: Nov 2026


Pay Rate: Hourly; Negotiable based on experience


Per Diem: Yes (if relocating or traveling)


Top Required Skills

Site-Level Quality Leadership -- Experience managing a quality function, inspection team, or multidisciplinary group of quality SMEs across an active construction site.


Risk-Based Quality Decision-Making -- Demonstrated ability to assess competing quality issues and determine which findings create the greatest risk.


Direct Data Center QA/QC and Commissioning Fluency -- Experience supporting quality on data center construction projects, combined with credible knowledge of data center commissioning stages, critical MEP systems, testing, issue closure, and turnover.


Required Qualifications


  • Demonstrated experience managing inspectors, quality professionals, or discipline-specific SMEs on active construction projects.

  • Proven experience leading or supporting a site-level QA/QC program, not only performing inspections.

  • Direct data center construction experience strongly preferred, particularly on hyperscale or large mission-critical campuses.

  • Strong understanding of data center electrical and mechanical infrastructure.

  • Working knowledge of data center commissioning stages, terminology, testing, and turnover requirements.

  • Experience assessing quality risk and prioritizing findings according to project impact.

  • Experience managing NCRs, root-cause analysis, corrective actions, and verification of closure.

  • Experience reviewing MEP drawings, submittals, specifications, vendor documentation, and testing procedures.

  • Experience auditing contractors, subcontractors, vendors, or third-party inspection organizations.

  • Experience developing quality metrics, dashboards, reports, and trend analysis.

  • Experience coordinating between design, construction, commissioning, and facility operations.

  • Ability to communicate difficult findings clearly, professionally, and proportionately.

  • Experience with construction quality and commissioning platforms such as ACC/BIM 360, Procore, CxAlloy, or comparable systems.


Role Overview

The QA/QC Program Engineer will support the site Quality Manager in leading and improving the construction quality program for a large, fast-paced hyperscale data center campus. This role is not an individual inspector position. The site already has civil, structural, architectural, mechanical, electrical, controls, and other discipline-specific inspectors who serve as technical subject matter experts.


The QA/QC Program Engineer Will Help Manage And Coordinate Those Inspection Resources, Assess The Significance Of Their Findings, Prioritize The Issues That Create The Greatest Project Risk, And Guide The Site Team Toward Appropriate Corrective Actions. The Successful Candidate Must Understand That Not Every Quality Finding Requires The Same Level Of Escalation. This Person Must Use Sound Judgment To Distinguish Routine Workmanship Issues From Conditions That Could Affect


Safety


Equipment reliability


Design intent


Commissioning readiness


Operational performance


Schedule


Cost


Final turnover


Primary Responsibilities

Quality Leadership & Risk Management


  • Support the site Quality Manager in leading and coordinating discipline-specific inspectors and quality SMEs across active construction areas.

  • Prioritize quality findings based on safety, reliability, commissioning impact, schedule risk, and operational readiness.

  • Distinguish critical issues from routine deficiencies and recommend appropriate mitigation strategies.

  • Communicate quality risks, recommendations, and escalation requirements to site leadership.


QA/QC Program Management


  • Support development and continuous improvement of the site QA/QC program, procedures, inspection strategies, and quality standards.

  • Analyze quality trends, NCRs, audit results, and recurring issues to drive corrective and preventive actions.

  • Monitor quality metrics and provide actionable recommendations to construction and quality leadership.

  • Support standardization of quality processes across multiple contractors and trades.

  • Lead contractor and trade-partner quality audits to verify compliance with approved quality requirements.

  • Manage NCRs and corrective actions from identification through verification and closure.

  • Validate that corrective actions address root causes and reduce repeat issues.

  • Escalate critical, aging, recurring, or commissioning-impacting deficiencies.


Design Review & Technical Quality Oversight


  • Review MEP drawings, specifications, submittals, vendor documentation, and construction procedures.

  • Identify design conflicts, installation risks, and quality concerns before they impact commissioning or schedule.

  • Verify installed work meets approved design intent, project standards, and manufacturer requirements.


Data Center Commissioning Integration


  • Support quality readiness from equipment procurement through installation, testing, commissioning, and turnover.

  • Review commissioning documentation, scripts, and test records for completeness and compliance.

  • Partner with commissioning teams to remove quality barriers to functional and integrated systems testing.

  • Demonstrate familiarity with hyperscale data center commissioning methodology, including FAT/FWT activities and industry-standard commissioning terminology.


Turnover & Operational Readiness


  • Review turnover packages, testing records, NCRs, warranties, O&M manuals, and as-built documentation.

  • Drive closure of outstanding quality issues prior to turnover.

  • Support successful handoff between construction, commissioning, and facility operations teams.


Cross-Functional Leadership


  • Collaborate with quality leadership, construction teams, contractors, design engineers, vendors, and commissioning agents.

  • Translate technical findings into practical recommendations focused on project risk, reliability, and operational performance.

  • Maintain a partner-oriented approach while holding contractors accountable to quality requirements.


Job Type & Location

This is a Contract position based out of El Paso, TX.


Pay And Benefits

The pay range for this position is $80.00 - $90.00/hr.


Individual compensation offered for this position within this range will depend on many factors, including qualifications, skills, relevant experience, job knowledge, geographic location, internal equity, and other pertinent job-related factors.


Eligibility requirements apply to some benefits and may depend on your job classification and length of employment. Benefits are subject to change and may be subject to specific elections, plan, or program terms. If eligible, the benefits available for this temporary role may include the following: Medical, dental & vision Critical Illness, Accident, and Hospital 401(k) Retirement Plan Pre-tax and Roth post-tax contributions available Life Insurance (Voluntary Life & AD&D for the employee and dependents) Short and long-term disability Health Spending Account (HSA) Transportation benefits Employee Assistance Program Time Off/Leave (PTO, Vacation or Sick Leave)


Job Type & Location

This is a Contract position based out of El Paso, TX.


Application Deadline

This position is anticipated to close on Nov 13, 2026.


Workplace Type

This is a fully onsite position in El Paso,TX.


About TEKsystems

We're partners in transformation. We help clients activate ideas and solutions to take advantage of a new world of opportunity. We are a team of 80,000 strong, working with over 6,000 clients, including 80% of the Fortune 500, across North America, Europe and Asia. As an industry leader in Full-Stack Technology Services, Talent Services, and real-world application, we work with progressive leaders to drive change. That's the power of true partnership. TEKsystems is an Allegis Group company.


The company is an equal opportunity employer and will consider all applications without regards to race, sex, age, color, religion, national origin, veteran status, disability, sexual orientation, gender identity, genetic information or any characteristic protected by law.


About TEKsystems And TEKsystems Global Services

Were a leading provider of business and technology services. We accelerate business transformation for our customers. Our expertise in strategy, design, execution and operations unlocks business value through a range of solutions. Were a team of 80,000 strong, working with over 6,000 customers, including 80% of the Fortune 500 across North America, Europe and Asia, who partner with us for our scale, full-stack capabilities and speed. Were strategic thinkers, hands-on collaborators, helping customers capitalize on change and master the momentum of technology. Were building tomorrow by delivering business outcomes and making positive impacts in our global communities. TEKsystems and TEKsystems Global Services are Allegis Group companies. Learn more at TEKsystems.com.


The company is an equal opportunity employer and will consider all applications without regard to race, sex, age, color, religion, national origin, veteran status, disability, sexual orientation, gender identity, genetic information or any characteristic protected by law.


San Francisco Fair Chance Ordinance: Pursuant to the San Francisco Fair Chance Ordinance, for all positions located in the city and county of San Francisco, we will consider for employment qualified applicants with arrest and conviction records.


Massachusetts Lie Detector: It is unlawful in Massachusetts to require or administer a lie detector test as a condition of employment or continued employment. An employer who violates this law shall be subject to criminal penalties and civil liability.


Use of Artificial Intelligence (AI): We may use Artificial Intelligence (AI) to support parts of our hiring process, including sourcing, screening, and evaluating candidates. AI helps assess applications and qualifications, but final decisions are made by our hiring team. By applying, you acknowledge and agree that your application may be reviewed using AI tools.

Consigue la evaluación confidencial y gratuita de tu currículum.

o arrastra y suelta tu archivo aquí

Similar jobs

Puestos de trabajo similares que vale la pena comparar

Lead Mechanical Assembly Technician
Lead Mechanical Assembly Technician

TEKsystems • Manassas (VA)

Presencial
USD 55.000 - 78.000
Medical, dental & vision
401(k) Retirement Plan
Pre-tax and Roth post-tax deductions
+6
Construction Manager (Owners Rep / Data Center) - OH
Construction Manager (Owners Rep / Data Center) - OH

TEKsystems • Columbus (OH)

Presencial
USD 136.000 - 194.000
Per diem for relocation/travel
Electrical Technician
Electrical Technician

TEKsystems • Jeffersonville (OH)

Presencial
USD 34.000 - 41.000
Medical, dental & vision
401(k) Retirement Plan
Life Insurance
+1
Data Center Senior Project Manager
Data Center Senior Project Manager

TEKsystems • Saline (MI)

Presencial
USD 103.000 - 172.000
Medical, dental & vision
401(k) Retirement Plan
Per diem assistance
+1
Data Center Technician
Data Center Technician

TEKsystems • Goodyear (AZ)

Presencial
USD 66.000 - 76.000
Data Center Quality Inspector
Data Center Quality Inspector

TEKsystems • West Memphis (AR)

Presencial
USD 34.000 - 39.000
Data Center Engineer
Data Center Engineer

TEKsystems • Memphis (TN)

Presencial
USD 51.000 - 73.000
Medical, dental & vision
401(k) retirement plan
Life Insurance
+5
Mechanical Assembly Technician II
Mechanical Assembly Technician II

TEKsystems • Manassas (VA)

Presencial
USD 48.000 - 68.000
Medical, dental & vision
401(k) Retirement Plan
Life Insurance
+2
UX Designer & Researcher - UX Generalist
UX Designer & Researcher - UX Generalist

TEKsystems • Spring (TX)

Presencial
USD 83.000 - 103.000
Medical, dental & vision
401(k) retirement plan
Life Insurance
+1
Network Engineer (W2 Only)
Network Engineer (W2 Only)

TEKsystems • EE. UU.

Híbrido
USD 62.000 - 90.000
Medical, dental & vision
401(k) Retirement Plan
Life Insurance