Material Coordinator - 2nd Shift (Forklift Certified)

Nutanix

Royal Pines (NC)

On-site

USD 25,000 - 36,000

Full time

8 days ago

Get more replies from employers

Send a job-specific resume in minutes.

Job summary

Eaton is seeking an ATS - Material Coordinator for 2nd shift to ensure material availability and kit assembly per BOM. Responsibilities include pulling BOM packets, staging components, tracking shortages, and coordinating with fabrication and supply chain teams to avoid delays.

A forklift certification and at least two years of direct manufacturing experience are preferred. The role requires strong organizational skills and knowledge of Bills of Materials, with duties spanning tools setup,

Qualifications

  • High school diploma or G.E.D. from an accredited institution.
  • Associates Degree in related field preferred.
  • Two years of direct manufacturing experience preferred.
  • Forklift certification or ability to obtain forklift certification.

Responsibilities

  • Pull BOM Packets and sort through them for drawings and information.
  • Gather Panel Build Steel into kit.
  • Gather Electrical BOM components and stage with steel kit.
  • Cut Dinrail and place Dinrail with parts kit.
  • Retrieve Device labels from Nameplate Area and place with Packet.
  • Assign and prioritize Panel Build units per schedule.
  • Track parts shortages and fill out shortage sheets.
  • Retrieve Wire markers from Nameplate area.
  • Retrieve Wires from Wire machines.
  • Stage and transfer Wires, Built Panel, Wire markers and steel panel and sides at wire station as wire person has need for new work.
  • Transfer panels from wire table and prioritize for Inspection completed wire modules on Inspection conveyor, tower, etc.

Skills

Forklift certification
Manufacturing experience
Strong organizational skills
Understanding of Bills of Material

Education

Associates Degree in related field

Job description

Eaton is seeking an ATS - Material Coordinator for 2nd shift to ensure material availability and kit assembly per BOM. Responsibilities include pulling BOM packets, staging components, tracking shortages, and coordinating with fabrication and supply chain teams to avoid delays.

A forklift certification and at least two years of direct manufacturing experience are preferred. The role requires strong organizational skills and knowledge of Bills of Materials, with duties spanning tools setup,

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Materials & BOM Coordinator, 2nd Shift
Materials & BOM Coordinator, 2nd Shift

Eaton Corporation • Asheville (NC)

On-site
USD 25,000 - 36,000
2nd Shift Materials Coordinator
2nd Shift Materials Coordinator

Eaton • Royal Pines (NC)

On-site
USD 26,000 - 34,000
ATS - Material Coordinator- 2nd shift
ATS - Material Coordinator- 2nd shift

Eaton • Royal Pines (NC)

On-site
USD 26,000 - 34,000
2nd Shift Materials Team Lead - Kanban & Inventory
2nd Shift Materials Team Lead - Kanban & Inventory

Nutanix • Royal Pines (NC)

On-site
USD 30,000 - 39,000
ATS - Material Coordinator- 2nd shift
ATS - Material Coordinator- 2nd shift

Eaton Corporation • Asheville (NC)

On-site
USD 25,000 - 36,000
ATS - Material Coordinator- 2nd shift
ATS - Material Coordinator- 2nd shift

Nutanix • Royal Pines (NC)

On-site
USD 25,000 - 36,000
Aerospace Materials Handler - 2nd Shift
Aerospace Materials Handler - 2nd Shift

Eaton • Los Angeles (CA)

On-site
USD 28,000 - 40,000
Forklift Certified
DOT/IATA Certified
Aerospace Material Handler - 2nd Shift (LA)
Aerospace Material Handler - 2nd Shift (LA)

Nutanix • Pasadena (CA)

On-site
USD 33,000 - 36,000
Material Handler: Lean Logistics & Forklift Expertise
Material Handler: Lean Logistics & Forklift Expertise

Silfex, Inc. - A Division of Lam Research Corporation • Eaton Township (OH)

On-site
USD 35,000 - 45,000
Material Handler - 2nd Shift with Sign-On Bonus
Material Handler - 2nd Shift with Sign-On Bonus

Nutanix • Richmond (VA)

On-site
USD 42,000 - 48,000
Health benefits
Vacation time
Paid holidays
+5