Low Voltage QA/Security Cx Associate (Owners Representative) - Data Center Construction

KALCON

York (SC)

On-site

USD 100,000 - 150,000

Full time

3 days ago
Be an early applicant
Application generator

An application made for this job — a tailored resume and cover letter that speak straight to the posting.

Get past ATS filters

Benefits offered by this job

Medical insurance
Dental insurance
Vision insurance
Life Insurance
Accident Insurance
Long Term Disability
401(k) retirement plan with 4% KALCON?

Job summary

KALCON is seeking a Low Voltage QA/Security Cx Associate (Owners Representative) in York, SC to provide owner representation for data center construction. You will lead field inspections, verify installation quality, and document results in Procore or ACC while coordinating across disciplines and vendors.

Responsibilities include overseeing OSP/ISP pathway installation, conduit rough-in, and network room readiness, plus supporting commissioning activities in Cx Alloy and tracking punch lists to

Qualifications

  • Four-year degree preferred in Construction Management or Electrical Engineering; equivalent field experience considered.
  • Minimum 4 years of experience in low voltage infrastructure installations.
  • Experience with mission-critical or high-tech construction projects.
  • Familiarity with security, network/WAP, and controls cabling systems.
  • Experience with commissioning processes and documenting in Cx Alloy.
  • Proficiency with construction management software (e.g., Procore or ACC).
  • Excellent communication and coordination across disciplines and vendors.
  • Ability to manage punch list resolution and ensure timely corrective actions.

Responsibilities

  • Conduct field inspections to verify progress of low voltage installations.
  • Assess installation quality to ensure compliance with design documents.
  • Document findings using Procore or ACC and confirm corrective actions.
  • Collaborate with Q-Systems for onsite oversight and coordination across disciplines.
  • Oversee installation of Outside Plant (OSP) and Inside Plant (ISP) pathways.
  • Monitor base building low voltage cable tray installation and pathway readiness.
  • Inspect conduit rough-in for compliance with design specs.
  • Ensure network rooms are prepared for equipment installation.
  • Oversee cabling for security, network and WAP systems; BMS and EMPS controls.
  • Witness commissioning activities and document results in Cx Alloy; track punch lists.

Skills

Communication
Coordination
Field oversight
Problem solving
Document management

Education

Bachelor’s degree in Construction Management or Electrical Engineering

Tools

Procore
Autodesk Construction Cloud (ACC)
Cx Alloy

Job description

Low Voltage QA/Security Cx Associate (Owners Representative) - Data Center Construction

York, SC

Seeking a Low Voltage QA/Security Cx Associate to provide Owner Representation on the construction of a data center campus.

Minimum Qualifications:
  • A four-year degree in Construction Management, Electrical Engineering, or a related field is preferred.
  • In lieu of a degree, equivalent field experience in low voltage systems installation and supervision will be considered.
  • Minimum of 4 years of experience in low voltage infrastructure, including cable tray, conduit, and equipment installation.
  • Experience supporting mission critical or high-tech construction projects.
  • Familiarity with security, network/WAP, and controls cabling systems.
  • Experience with commissioning processes, including script assignment and documentation in platforms such as Cx Alloy.
  • Strong understanding of installation quality standards, labeling protocols, and clean workmanship practices.
  • Proficiency in construction management software such as Procore or Autodesk Construction Cloud (ACC).
  • Excellent communication and coordination skills across disciplines and vendors.
  • Ability to manage punch list resolution and ensure timely corrective actions.
Tasks and Responsibilities:
Field Oversight & Inspection
  • Conduct field inspections to verify that low voltage systems installation is progressing according to schedule.
  • Assess installation quality to ensure compliance with design documents.
  • Document findings using platforms such as Procore or Autodesk Construction Cloud (ACC) and follow up to confirm completion of corrective actions.
  • Collaborate with Q-Systems support to provide onsite oversight, direction, and coordination across disciplines.
Pathways
  • Oversee installation of Outside Plant (OSP) and Inside Plant (ISP) pathways.
  • Monitor base building low voltage cable tray installation.
  • Inspect conduit rough-in for compliance and readiness.
  • Ensure network rooms are prepared for equipment installation and meet design specifications.
Low Voltage Cable & Equipment Installation
  • Oversee installation of cabling for:
    • Security systems
    • Network and Wireless Access Points (WAP)
    • Controls systems
  • Verify installation of equipment per design for:
    • Security systems
    • Network and WAP infrastructure
    • Building Management System (BMS) and Emergency Power Supply (EMPS) controls
Physical Inspection
  • Confirm proper installation of devices and equipment.
  • Ensure labeling is accurate and workmanship is clean and professional.
Commissioning (Cx) Support
  • Coordinate and monitor commissioning efforts for security systems.
  • Assign commissioning scripts to equipment within Cx Alloy.
  • Witness commissioning activities and document results in Cx Alloy.
  • Track and follow up on punch list items to ensure resolution and path to completion.
Benefits Offered:
  • Medical insurance
  • Dental insurance
  • Vision insurance
  • Life Insurance
  • Accident Insurance
  • Long Term Disability
  • 401(k) retirement plan with 4% KALCON match when an employee contributes at least 5%
  • 15 days of paid time off
  • 8 paid national holidays
  • Reimbursement for professional licenses and certifications
Submission Requirements:

At a minimum, the candidate's professional resume must include the following:

  • List of all Educational Achievements
  • List of all Professional Licenses or Certificates
  • List of Awards Received
  • Detailed Employment History with each company:
    • o Name of the firm or agency
    • o Start Date and End Date (Month & Year)
    • o Positions Held

At KALCON we are committed to creating an inclusive, diverse, and equitable workplace where every individual isrespected and valued. We are an equal opportunity employer and all applicant and employees will receive consideration for employment as we do not tolerate discrimination of any kind based on race, color, religion, gender, sexual orientation, gender identity, national origin, age, disability, genetics, protected veteran status or any other protected characteristic as outlined by federal, state, or local laws. We believe that a diverse workforce contributes to the success of our company and the innovation behind the exceptional projects we deliver. We encourage and support applicants from all backgrounds, experiences, and perspectives to join our team and thrive. Our hiring and employment practices are guided by principles of fairness, equality, and opportunity for all.

Salary Range

$100,000 - $150,000 USD

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Low Voltage QA/Security Cx Associate (Owners Representative) - Fayetteville, GA
Low Voltage QA/Security Cx Associate (Owners Representative) - Fayetteville, GA

KALCON • Fayetteville (GA)

On-site
USD 100,000 - 150,000
Medical insurance
Dental Insurance
Vision Insurance
+1
Low Voltage QA/Security Cx Associate (Owners Representative) - Data Center Construction
Low Voltage QA/Security Cx Associate (Owners Representative) - Data Center Construction

KALCON • Fayetteville (GA)

On-site
USD 100,000 - 150,000
Medical insurance
Dental insurance
Vision insurance
+7
Low Voltage QA/Security Cx Associate (Owner's Rep) - Data Center Construction
Low Voltage QA/Security Cx Associate (Owner's Rep) - Data Center Construction

KALCON • Eagle Mountain (UT)

On-site
USD 65,000 - 85,000
Medical insurance
Dental Insurance
Vision Insurance
+4
Sr. Construction Manager (Owners Representative) - Data Center Construction
Sr. Construction Manager (Owners Representative) - Data Center Construction

KALCON • Phoenix (AZ)

On-site
USD 150,000 - 225,000
401(k) matching plan
PTO 15 days
8 paid holidays
+7
QA/QC Manager (General Contractor Rep) - Data Center Construction
QA/QC Manager (General Contractor Rep) - Data Center Construction

KALCON • Austin (TX)

On-site
USD 130,000 - 200,000
Medical insurance
Dental Insurance
Vision Insurance
+7
Sr. Construction Manager (Owners Representative) - Data Center Construction
Sr. Construction Manager (Owners Representative) - Data Center Construction

KALCON • Philadelphia

On-site
USD 150,000 - 225,000
401(k) match
Paid time off
Holidays
+1
Low Voltage Project Manager (Owner's Representative) - Data Center Construction
Low Voltage Project Manager (Owner's Representative) - Data Center Construction

KALCON • Portsmouth (OH)

On-site
USD 140,000 - 220,000
Medical insurance
Dental insurance
Vision insurance
+4
Construction Manager (Owner's Representative) - Data Center Construction
Construction Manager (Owner's Representative) - Data Center Construction

KALCON • Phoenix (AZ)

On-site
USD 140,000 - 200,000
401(k) with 4% match
Paid time off 15 days
8 paid holidays
+1
Electrical Project Manager (Owner's Representative) - Data Center Construction
Electrical Project Manager (Owner's Representative) - Data Center Construction

KALCON • Portsmouth (OH)

On-site
USD 140,000 - 220,000
Long Term Disability
401(k) 4% match
Paid time off 15 days
+1
Project Engineer (Owner's Representative) - Data Center Construction
Project Engineer (Owner's Representative) - Data Center Construction

KALCON • Portsmouth (OH)

On-site
USD 80,000 - 120,000
Long Term Disability
401(k) match
Paid time off
+2