Eine vollständige Bewerbung in einer Minute
Maßgeschneiderter Lebenslauf und Anschreiben – versandbereit.
Broward County Public Schools is seeking a LONG TERM SUBSTITUTE for 5th grade at Stephen Foster Elementary in Davie, Florida. This full-time position requires classroom coverage as needed and a stable presence for students.
The minimum qualifications include sixty semester credits from an accredited institution, a preferred Bachelor's degree, completion of the Substitute Teacher Training Workshop, and basic computer skills. Bilingual ability is a plus but not required.
Broward County Public Schools is seeking a LONG TERM SUBSTITUTE for 5th grade at Stephen Foster Elementary in Davie, Florida. This full-time position requires classroom coverage as needed and a stable presence for students.
The minimum qualifications include sixty semester credits from an accredited institution, a preferred Bachelor's degree, completion of the Substitute Teacher Training Workshop, and basic computer skills. Bilingual ability is a plus but not required.