Lead Principal Physical Security Engineer, Hyperscale Data Center Construction (Port Washington, WI)

Oracle

Wisconsin

On-site

USD 135,000 - 306,000

Full time

12 days ago

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Benefits offered by this job

Medical, dental, and vision insurance
401(k) with company match
Paid time off
Relocation assistance

Job summary

Oracle Cloud Infrastructure (OCI) is seeking a Lead Principal Physical Security Systems Engineer to lead design, delivery, and integration of security systems for a hyperscale data center in Port Washington, Wisconsin.

You will coordinate with design, construction, security operations, networking, and vendors to ensure systems meet OCI standards and are ready for operational use, with relocation assistance provided.

Qualifications

  • Experience designing, delivering, or managing physical security in critical facilities.
  • Strong knowledge of access control, video surveillance, intrusion detection, and monitoring.
  • Ability to review drawings, specifications, and commissioning docs.
  • Travel flexibility for project delivery and site reviews.

Responsibilities

  • Technical leadership: review designs, identify gaps, guide teams.
  • Construction delivery: oversee integrators and turnover, manage scope and schedule.
  • Systems integration: coordinate access control, video, intrusion with networks.
  • Quality and commissioning: review tests, track deficiencies to resolution.
  • Operational handover: confirm readiness for OCI security and operations teams.
  • Standards and improvement: improve design standards and turnover requirements.

Skills

Physical security systems
Data center security
Project coordination
Vendor management
Cross-functional collaboration
Travel ability

Education

Bachelor's degree in engineering (or related field)

Tools

LenelS2
Genetec
Avigilon
CCure
Axis

Job description

Job Description

Oracle Cloud Infrastructure (OCI) is expanding its data center portfolio to support global cloud and AI infrastructure. The Physical Security Systems team works across design, construction, commissioning, and operations to deliver reliable security systems for these facilities.

This Lead Principal Physical Security Systems Engineer serves as a senior technical authority for physical security systems on complex data center construction projects. The role works with design, construction, security operations, networking, commissioning, and vendor teams to ensure systems meet OCI standards and are ready for operational use.

NOTE: This is a full-time role located onsite at our new hyperscale facility in Port Washington, Wisconsin. Relocation assistance will be provided.

Required Qualifications
  • Significant experience designing, delivering, or managing physical security systems in data centers, mission-critical facilities, large campuses, or similarly secure environments.
  • Strong knowledge of access control, video surveillance, intrusion detection, intercoms, perimeter security, and security monitoring platforms.
  • Experience reviewing construction drawings, specifications, submittals, device schedules, and commissioning documentation.
  • Understanding of low-voltage construction, structured cabling, device installation, labeling, testing, and system integration.
  • Proven ability to manage integrators, contractors, and vendors while coordinating with cross-functional teams.
  • Ability to identify technical, quality, and schedule risks and communicate clearly with field teams and leadership.
  • Experience reviewing vendor scope, change orders, pricing, and schedule impacts.
  • Bachelor's degree in engineering, construction management, information technology, security management, or a related field, or equivalent practical experience.
  • Ability to travel as needed for project delivery and site reviews.
Preferred Qualifications
  • Experience delivering physical security systems for hyperscale data centers, cloud infrastructure, or other mission-critical facilities.
  • Experience with large campuses, high-density data halls, or projects with phased construction and operational handovers.
  • Familiarity with enterprise access control, video management, intrusion detection, badging, visitor management, and security operations platforms.
  • Experience integrating security systems with networks, building systems, life safety systems, and centralized monitoring.
  • Knowledge of commissioning, integrated systems testing, deficiency tracking, and operational acceptance.
  • Experience working with general contractors, security integrators, low-voltage contractors, design consultants, commissioning agents, and owner's representatives.
  • Experience developing security standards, installation details, inspection checklists, test scripts, or turnover documentation.
  • Familiarity with applicable codes, regional requirements, and secure facility operations.
  • Certifications such as PSP, CPP, PMP, RCDD, or BICSI, or relevant platform certifications for systems such as LenelS2, Genetec, Avigilon, CCure, or Axis.
What Success Looks Like

Security systems are installed consistently, function as intended, and are fully tested and documented before handover. The Principal Engineer identifies issues early, holds vendors accountable, and gives project and operations leaders a clear view of system readiness.

Responsibilities
Key Responsibilities
  • Technical leadership: Review security designs, drawings, specifications, submittals, and installation details. Identify design gaps, integration risks, and operational concerns, and guide teams toward practical solutions.
  • Construction delivery: Oversee security integrators and contractors through installation, configuration, testing, and turnover. Monitor scope, schedule, quality, vendor performance, and change orders.
  • Systems integration: Coordinate access control, video surveillance, intrusion detection, intercom, badging, and perimeter security systems with site networks, monitoring platforms, and operational processes.
  • Quality and commissioning: Review inspection records, test plans, device schedules, configurations, and closeout documents. Participate in field inspections and functional testing, and track deficiencies through resolution.
  • Operational handover: Confirm systems are tested, documented, and ready for acceptance by OCI security and operations teams. Communicate readiness, open risks, and decisions needed to project leadership.
  • Standards and improvement: Help improve design standards, installation practices, testing procedures, and turnover requirements across projects.
Qualifications

Disclaimer:

Certain U.S. based or U.S. customer or client-facing roles may be required to comply with applicable requirements, such as immunization/occupational health mandates, and/or drug testing requirements.

Range and benefit information provided in this posting are specific to the stated locations only

US: Hiring Range in USD from: $135,200 - $306,400 per year. May be eligible for bonus, equity, and compensation deferral.

Oracle maintains broad salary ranges for its roles in order to account for variations in knowledge, skills, experience, market conditions and locations, as well as reflect Oracle's differing products, industries and lines of business.

Candidates are typically placed into the range based on the preceding factors as well as internal peer equity.

Benefits

Oracle US offers a comprehensive benefits package which includes the following:

  • Medical, dental, and vision insurance, including expert medical opinion
  • Short term disability and long term disability
  • Life insurance and AD&D
  • Supplemental life insurance (Employee/Spouse/Child)
  • Health care and dependent care Flexible Spending Accounts
  • Pre-tax commuter and parking benefits
  • 401(k) Savings and Investment Plan with company match
  • Paid time off: Flexible Vacation is provided to all eligible employees assigned to a salaried (non-overtime eligible) position. Accrued Vacation is provided to all other employees eligible for vacation benefits. For employees working at least 35 hours per week, the vacation accrual rate is 13 days annually for the first three years of employment and 18 days annually for subsequent years of employment. Vacation accrual is prorated for employees working between 20 and 34 hours per week. Employees working fewer than 20 hours per week are not eligible for vacation.
  • 11 paid holidays
  • Paid sick leave: 72 hours of paid sick leave upon date of hire. Refreshes each calendar year. Unused balance will carry over each year up to a maximum cap of 112 hours.
  • Paid parental leave
  • Adoption assistance
  • Employee Stock Purchase Plan
  • Financial planning and group legal
  • Voluntary benefits including auto, homeowner and pet insurance

The role will generally accept applications for at least three calendar days from the posting date or as long as the job remains posted.

As part of Oracle's onboarding process and consistent with applicable law, US-based employees are required to complete identity verification, which involves the collection and processing of their biometric information. Accommodations to this requirement may be granted following an individualized assessment.

About Us

Only Oracle brings together the data, infrastructure, applications, and expertise to power everything from industry innovations to life-saving care. And with AI embedded across our products and services, we help customers turn that promise into a better future for all. Discover your potential at a company leading the way in AI and cloud solutions that impact billions of lives.

True innovation starts when everyone is empowered to contribute. That's why we're committed to growing a workforce that promotes opportunities for all with competitive benefits that support our people with flexible medical, life insurance, and retirement options. We also encourage employees to give back to their communities through our volunteer programs.

We're committed to including people with disabilities at all stages of the employment process. If you require accessibility assistance or accommodation for a disability at any point, let us know by emailing accommodation-request_mb@oracle.com or by calling 1-888-404-2494 in the United States.

Oracle is an Equal Employment Opportunity Employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, sexual orientation, gender identity, disability and protected veterans' status, or any other characteristic protected by law. Oracle will consider for employment qualified applicants with arrest and conviction records pursuant to applicable law.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Lead Principal Physical Security Engineer, Hyperscale Data Center Construction (Saline Township, MI)
Lead Principal Physical Security Engineer, Hyperscale Data Center Construction (Saline Township, MI)

Oracle • Michigan

On-site
USD 135,000 - 306,000
Relocation assistance
Lead Principal Security Engineer
Lead Principal Security Engineer

Oracle • Nashville (TN)

On-site
USD 184,000 - 306,000
Medical insurance
Dental insurance
Vision insurance
+2
Lead Principal Security Engineer
Lead Principal Security Engineer

Oracle • Austin (TX)

On-site
USD 130,000 - 306,000
Health insurance
401(k) plan
Paid time off
+1
Lead Principal Security Engineer
Lead Principal Security Engineer

Oracle • Seattle (WA)

On-site
USD 130,000 - 306,000
Medical, dental, vision insurance
401(k) plan with company match
Paid time off and holidays
Principal Program Manager – Central Operations, Physical Security - Nashville TN
Principal Program Manager – Central Operations, Physical Security - Nashville TN

Oracle • Nashville (TN)

On-site
USD 83,000 - 166,000
Medical, dental, and vision insurance
Short/Long term disability
Life insurance and AD&D
+2
Principal Technical Program Manager, Data Centers
Principal Technical Program Manager, Data Centers

Oracle • Kansas City (MO)

On-site
USD 102,000 - 210,000
Medical insurance
Dental insurance
Vision insurance
+2
Principal Data Center Fiber Deployment
Principal Data Center Fiber Deployment

Oracle • Abilene (TX)

On-site
USD 102,000 - 210,000
Medical, dental, and vision insurance
401(k) Savings and Investment Plan
Paid time off
+1
Principal Technical Program Manager, Data Centers
Principal Technical Program Manager, Data Centers

Oracle • United States

On-site
USD 102,000 - 210,000
Medical, dental, and vision insurance
401(k) Savings and Investment Plan
Paid time off
+2
Lead Principal Data Center Construction Manager
Lead Principal Data Center Construction Manager

Oracle • United States

On-site
USD 126,000 - 264,000
Health insurance
401(k) match
Paid time off
+1
Lead Principal Commissioning QA /QC Engineer - Port Washington, WI
Lead Principal Commissioning QA /QC Engineer - Port Washington, WI

Oracle • Port Washington (WI)

On-site
USD 126,000 - 264,000
Medical insurance
Dental insurance
Vision insurance
+13