A complete application in a minute
Tailored resume and cover letter, ready to send.
Wake Technical Community College seeks an Instructor Air Conditioning, Heating, and Refrigeration to provide effective instruction for assigned courses at various Wake Tech Campus Locations. The position is full-time (FLSA exempt) with a 40-hour work week and a salary range of $69,012.00 - $75,912.00 annually plus benefits.
Minimum qualifications include an Associate degree in Heating & Cooling Technology, Air Conditioning, Heating & Refrigeration with three years of field experience, or
Wake Technical Community College seeks an Instructor Air Conditioning, Heating, and Refrigeration to provide effective instruction for assigned courses at various Wake Tech Campus Locations. The position is full-time (FLSA exempt) with a 40-hour work week and a salary range of $69,012.00 - $75,912.00 annually plus benefits.
Minimum qualifications include an Associate degree in Heating & Cooling Technology, Air Conditioning, Heating & Refrigeration with three years of field experience, or