Evening EVS Terminal Cleaner - Part-Time & Impactful OR Prep

ServiceMaster Elite Cleaning Services

Baton Rouge (LA)

On-site

USD 17,000 - 25,000

Part time

39 hours ago
Be an early applicant

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Benefits offered by this job

Competitive pay
Part-time evening schedule
Paid training
Supportive team environment
Advancement opportunities
Impact on patient safety

Job summary

ServiceMaster Elite Cleaning Services in Baton Rouge, LA seeks an EVS Terminal Cleaner for the evening shift. The role cleans operating rooms and surgical areas after procedures to ensure a sanitized, safe environment for the next day.

The position is part-time with a 6:00 PM–10:00 PM schedule, requiring reliable attendance, attention to detail, and the ability to work independently. Training is provided and opportunities for advancement exist.

Qualifications

  • High school diploma or equivalent preferred.
  • Healthcare cleaning experience preferred but not required.
  • Ability to work independently with minimal supervision.
  • Strong attention to detail and commitment to quality.
  • Reliable attendance and punctuality.
  • Ability to stand, walk, bend, lift up to 30 pounds, and perform physical tasks throughout the shift.
  • Must be able to follow written and verbal instructions.

Responsibilities

  • Perform terminal cleaning and disinfection of operating rooms after the final surgical case.
  • Clean and sanitize walls, floors, lights, equipment, furniture, and all high-touch surfaces according to healthcare standards.
  • Remove trash, soiled linens, and biohazard waste following established safety protocols.
  • Restock supplies and prepare operating rooms for the next day's procedures.
  • Follow all infection prevention, OSHA, and hospital safety guidelines.
  • Properly use and maintain cleaning equipment and chemicals.
  • Maintain professionalism, confidentiality, and a positive attitude while working in a healthcare environment.
  • Complete assigned cleaning tasks accurately and efficiently.

Skills

Attention to detail
Independent work
Reliable attendance
Ability to lift 30 lbs
Follow instructions
Healthcare cleaning experience (prefer

Education

High school diploma or equivalent

Job description

ServiceMaster Elite Cleaning Services in Baton Rouge, LA seeks an EVS Terminal Cleaner for the evening shift. The role cleans operating rooms and surgical areas after procedures to ensure a sanitized, safe environment for the next day.

The position is part-time with a 6:00 PM–10:00 PM schedule, requiring reliable attendance, attention to detail, and the ability to work independently. Training is provided and opportunities for advancement exist.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

EVS Terminal Cleaner (Evening Shift)
EVS Terminal Cleaner (Evening Shift)

ServiceMaster Elite Cleaning Services • Baton Rouge (LA)

On-site
USD 17,000 - 25,000
Competitive pay
Part-time evening schedule
Paid training
+3
EVS Surgery Tech (Day Shift) - Clean ORs, Growth
EVS Surgery Tech (Day Shift) - Clean ORs, Growth

ServiceMaster Elite Cleaning Services • Baton Rouge (LA)

On-site
USD 32,000 - 42,000
Competitive pay
Daytime schedule
Paid training
+3
Day-Shift EVS Specialist: Healthcare Cleaning Pro
Day-Shift EVS Specialist: Healthcare Cleaning Pro

ServiceMaster Elite Cleaning Services • Baton Rouge (LA)

On-site
USD 30,000 - 46,000
Competitive pay
Paid training
Opportunities for career growth
EVS Surgery Tech (Day Shift)
EVS Surgery Tech (Day Shift)

ServiceMaster Elite Cleaning Services • Baton Rouge (LA)

On-site
USD 32,000 - 42,000
Competitive pay
Daytime schedule
Paid training
+3
EVS Specialist (Day Shift)
EVS Specialist (Day Shift)

ServiceMaster Elite Cleaning Services • Baton Rouge (LA)

On-site
USD 30,000 - 46,000
Competitive pay
Paid training
Opportunities for career growth
Healthcare EVS Technician - Flexible Schedule & Training
Healthcare EVS Technician - Flexible Schedule & Training

ServiceMaster of the Lakes Area • Alexandria (MN)

On-site
USD 19,000 - 25,000
Free uniforms
Parental leave
401(k) matching
+2
EVS Technician I — Clean, Safe Patient Environments
EVS Technician I — Clean, Safe Patient Environments

St. Tammany Parish Hospital • Covington (LA)

On-site
USD 18,000 - 22,000
EVS Care Specialist: Evening Shift for Clean, Safe Spaces
EVS Care Specialist: Evening Shift for Clean, Safe Spaces

Southeast Health • Dothan (AL)

On-site
USD 15,000 - 18,000
Healthcare EVS Technician — Clean & Safe
Healthcare EVS Technician — Clean & Safe

IICRC • Alexandria (VA)

On-site
USD 17,000 - 25,000
Free uniforms
Parental leave
401(k) matching
+2
OR EVS Aide — Evening Shift, Clean & Safe Environment
OR EVS Aide — Evening Shift, Clean & Safe Environment

Archbold • Thomasville (GA)

On-site
USD 30,000 - 40,000
Medical / Dental
Retirement Plan
PTO and paid life insurance
+2