Evening ABE/HSE Instructor Part-Time Impact

Georgia Power Company

Athens (GA)

On-site

USD 30,000 - 39,000

Part time

4 days ago
Be an early applicant

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

Athens Technical College is seeking a dedicated Part-time Adult Education ABE/HSE Instructor for the Clarke area in the evening. The role focuses on assessing student needs, developing individualized study plans, and delivering effective instruction aligned with curriculum guides for adults seeking to improve literacy and math skills.

The ideal candidate holds a Bachelor’s degree in Adult Education or related field, with Master’s preferred.

Qualifications

  • Bachelor’s degree in Adult Education, Business Education, or a related field.
  • Master’s degree preferred.
  • Knowledge of adult education systems within the Technical College System of Georgia.

Responsibilities

  • Identify student goals and design an appropriate program.
  • Conduct assessments in reading, mathematics, and language to determine strengths and weaknesses.
  • Develop individualized plans of study for each participant.
  • Plan, develop, and implement lessons that use higher‑order thinking skills.
  • Monitor and evaluate progress to modify the individualized program as needed.
  • Perform other duties as assigned.

Education

Bachelor’s degree in Adult Education, Business Education, or a related field
Master’s degree

Job description

Athens Technical College is seeking a dedicated Part-time Adult Education ABE/HSE Instructor for the Clarke area in the evening. The role focuses on assessing student needs, developing individualized study plans, and delivering effective instruction aligned with curriculum guides for adults seeking to improve literacy and math skills.

The ideal candidate holds a Bachelor’s degree in Adult Education or related field, with Master’s preferred.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Evening Part-Time ABE/HSE Instructor
Evening Part-Time ABE/HSE Instructor

Athens Technical College • Memphis (TN)

On-site
USD 25,000 - 41,000
Part-Time ABE/HSE Instructor: Empower Adult Learners
Part-Time ABE/HSE Instructor: Empower Adult Learners

State of Georgia • Memphis (TN)

On-site
USD 28,000 - 50,000
Part-Time ABE/HSE Instructor: Empower Adult Learners
Part-Time ABE/HSE Instructor: Empower Adult Learners

Georgia Power Company • Athens (GA)

On-site
USD 28,000 - 41,000
Evening ABE Teacher | Multilevel Literacy & Tech Skills
Evening ABE Teacher | Multilevel Literacy & Tech Skills

Atlanta Public Schools • Atlanta (GA)

On-site
USD 30,000 - 41,000
Evening Adult Education Lead Teacher - Part Time
Evening Adult Education Lead Teacher - Part Time

Georgia Power Company • Clarkston (GA)

On-site
USD 30,000 - 42,000
Evening Adult Education Lead Teacher (Part-Time)
Evening Adult Education Lead Teacher (Part-Time)

Georgia Department of Revenue • Clarkston (WA)

On-site
USD 30,000 - 42,000
Evening Adult Education Lead Teacher | Part-Time
Evening Adult Education Lead Teacher | Part-Time

Georgia Piedmont Technical College • United States

On-site
USD 30,000 - 42,000
Part-Time ABE Instructor — Lead Adult Education (Tue/Thu)
Part-Time ABE Instructor — Lead Adult Education (Tue/Thu)

State of Georgia • United States

On-site
USD 30,000 - 33,000
Part-Time ABE Instructor for Adult Learners
Part-Time ABE Instructor for Adult Learners

Georgia Power Company • Georgia

On-site
USD 25,000 - 36,000
Part-Time ABE Instructor for Adult Education
Part-Time ABE Instructor for Adult Education

State of Georgia • United States

On-site
USD 25,000 - 36,000