Estimator - Change Order

Power Design Inc.

Saint Petersburg (FL)

On-site

USD 60,000 - 80,000

Full time

14 days+

Get more replies from employers

Send a job-specific resume in minutes.

Job summary

Power Design Inc. in Saint Petersburg, Florida, is seeking an Estimator – Change Order to prepare accurate estimates and cost analyses for project change orders. The ideal candidate will have a Bachelor's degree or equivalent and at least 2 years of estimating experience. Key responsibilities include managing pricing adjustments, collaborating with project teams, and supporting preconstruction efforts. This role is integral to maintaining project profitability and ensuring documentation accuracy. Proficiency in estimating software and strong analytical skills are essential.

Qualifications

  • 2+ years of relevant estimating experience.
  • Ability to read and interpret construction drawings and specifications.
  • Demonstrated ability to manage multiple priorities and meet deadlines.

Responsibilities

  • Prepare detailed estimates for change orders across multiple disciplines.
  • Review design and construction documents for scope changes.
  • Collaborate with project managers and engineers on constructability.

Skills

Proficiency with Microsoft Office Suite
Strong analytical and problem-solving skills
Excellent communication skills

Education

Bachelor’s degree or Journeyman’s license

Tools

Estimating software (ConEST or Accubid)
Bluebeam or other PDF-editing software

Job description

About the Position

As an Estimator – Change Order at Power Design, you’ll be responsible for preparing accurate, timely estimates and cost analyses for project change orders across multiple disciplines. This position plays a key role in maintaining project profitability, supporting operations, and ensuring that change-related work complies with Power Design’s standards of excellence. Working from our state-of-the-art headquarters in St. Petersburg, Florida, this role supports preconstruction and project teams by managing pricing adjustments, verifying scope changes, and ensuring financial accuracy through detailed estimating. You’ll work collaboratively across teams to drive accuracy, efficiency, and customer satisfaction.

Position Responsibilities
  • Prepare detailed and accurate change order estimates for electrical, low voltage, mechanical, and specialty systems.
  • Review design and construction documents to identify changes in scope and quantify cost impacts.
  • Utilize estimating software and internal databases to generate cost projections, material takeoffs, and labor analysis.
  • Collaborate with project managers, engineers, and field personnel to confirm constructability, labor needs, and project conditions.
  • Perform pricing and cost analysis for materials, subcontractors, and labor to ensure accuracy and profitability.
  • Draft and review bid documents, ensuring consistency with Power Design’s standards and client requirements.
  • Support preconstruction and field operations by ensuring all change order estimates are completed in a timely, professional manner.
  • Provide recommendations for cost-saving measures and process improvements.
  • Ensure documentation accuracy and version control in estimating platforms.
  • Participate in onboarding and mentorship for junior estimators and associate team members.
  • Demonstrate and uphold Power Design’s core values of integrity, accountability, teamwork, innovation, and growth.
Here’s What We’re Looking For
  • Bachelor’s degree or Journeyman’s license (or industry equivalent) plus 2+ years of relevant estimating experience.
  • Proficiency with Microsoft Office Suite (Word, Excel, Outlook, PowerPoint) and Bluebeam or other PDF-editing software.
  • Experience using estimating software (such as ConEST or Accubid) required.
  • Strong analytical and problem-solving skills, with attention to accuracy and detail.
  • Ability to read and interpret construction drawings, specifications, and contracts.
  • Excellent communication and collaboration skills across departments and clients.
  • Demonstrated ability to manage multiple priorities and meet deadlines in a fast-paced environment.
  • Understanding of financial and operational drivers that impact project success.
  • Commitment to Power Design’s leadership philosophy and continuous learning culture.

At Power Design, we are committed to providing an environment of mutual respect where equal employment opportunities are available to all applicants and teammates without regard to race, color, religion, sex, pregnancy, national origin, age, physical and mental disability, marital status, sexual orientation, gender identity, gender expression, genetic information, military and veteran status, and any other characteristic protected by applicable law. Power Design believes that diversity and inclusion among our teammates is paramount to our success as a national company, and we seek to recruit, develop and retain the most talented people from a diverse candidate pool nationwide

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Estimator
Estimator

Power Design Resources • Saint Petersburg (FL)

On-site
USD 65,000 - 90,000
Senior Construction Estimator
Senior Construction Estimator

Power Design, Inc. • Saint Petersburg (FL)

On-site
USD 95,000 - 130,000
Estimating Coordinator
Estimating Coordinator

Power Design Resources • Saint Petersburg (FL)

On-site
USD 45,000 - 65,000
Change Order Estimator: Drive Profit & Precision
Change Order Estimator: Drive Profit & Precision

Power Design Resources • Saint Petersburg (FL)

On-site
USD 65,000 - 90,000
Associate Estimator
Associate Estimator

Power Design • Saint Petersburg (FL)

Hybrid
USD 65,000 - 90,000
Competitive salary
Hybrid work options
On-campus amenities
+8
Assistant Lighting Associate
Assistant Lighting Associate

Power Design Resources • Saint Petersburg (FL)

On-site
USD 38,000 - 58,000
Low Voltage Estimator
Low Voltage Estimator

Power Design, Inc. • Saint Petersburg (FL)

On-site
USD 60,000 - 80,000
Senior Estimator, Multi-Disciplined Construction Leader
Senior Estimator, Multi-Disciplined Construction Leader

Power Design, Inc. • Saint Petersburg (FL)

On-site
USD 95,000 - 130,000
Lighting Consultant
Lighting Consultant

Power Design • Saint Petersburg (FL)

On-site
USD 65,000 - 95,000
Lighting Associate
Lighting Associate

Power Design • Saint Petersburg (FL)

On-site
USD 65,000 - 90,000