A complete application in a minute
Tailored resume and cover letter, ready to send.
Blue Ridge Technical Center in Front Royal, Virginia, part of Warren County Schools, seeks a Career and Technical Education teacher in Engineering for a full-time role starting date To Be Determined. Salary range is $54,506 to $80,903 per year, with a Bachelor degree preferred.
Contact Vince Gregg, CTE Director/Principal, for more information. The position requires a strong background in engineering education and a commitment to student success in a technical classroom setting within the county
Blue Ridge Technical Center in Front Royal, Virginia, part of Warren County Schools, seeks a Career and Technical Education teacher in Engineering for a full-time role starting date To Be Determined. Salary range is $54,506 to $80,903 per year, with a Bachelor degree preferred.
Contact Vince Gregg, CTE Director/Principal, for more information. The position requires a strong background in engineering education and a commitment to student success in a technical classroom setting within the county