Data Center Construction Lead - Onsite Excellence

World Wide Professional Solutions

La Porte (IN)

On-site

Full time

14 days+

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job description

WORLD WIDE PROFESSIONAL SOLUTIONS is a project solutions organization committed to lean construction, collaborative contracting, and execution strategies that improve project performance.

WWPS is hiring two Construction Managers to support a large scale data center project in La Porte, Indiana, approximately 40 minutes west of South Bend.

Open positions
  • Civil Lead
  • Vertical Construction Lead

These are full time onsite positions with WWPS. Benefits begin on Day One and include medical, dental, vision, life insurance, disability coverage, a 401(k) with company match, paid holidays, and paid time off.

Local candidates are encouraged to apply. Qualified candidates outside the area may be eligible for per diem, travel support, or relocation assistance.

Each Construction Manager will provide direct field oversight while leading safety, schedule performance, quality, contractor accountability, and coordination. Reporting to the Senior Construction Manager and Project Management leadership, both leads will serve as Owner’s representatives and ensure contractors deliver assigned scopes in accordance with project requirements, milestones, and quality standards.

Civil Lead Responsibilities
  • Clearing, grading, mass excavation, erosion control, and site preparation.
  • Stormwater, sanitary, domestic water, fire water, underground utilities, duct banks, roads, paving, and site concrete.
  • Civil interfaces with foundations, buildings, utilities, and electrical and mechanical infrastructure.
  • Earthwork quantities, soil conditions, compaction, excavation, and material placement.
  • Third party soils, concrete, and civil material testing.
  • Civil drawings, specifications, RFIs, submittals, and contractor work plans.
  • Contractor sequencing, manpower, equipment, and material readiness.
  • Inspections, permitting, and utility connections.
  • Underground utility risks, access constraints, scope conflicts, and weather impacts.
Vertical Construction Lead Responsibilities
  • Foundations, structural concrete, structural steel, precast, building envelope, roofing, interiors, and fit out.
  • Coordination among structural, architectural, mechanical, electrical, plumbing, fire protection, and controls contractors.
  • Interfaces with civil infrastructure, central utility systems, equipment installation, and commissioning.
  • Drawings, specifications, RFIs, submittals, shop drawings, and contractor work plans.
  • Progress by area, elevation, system, and construction zone.
  • Installation readiness for major mechanical and electrical equipment.
  • First in place reviews for structural, architectural, and building system installations.
  • Constructability issues, access constraints, trade stacking, and incomplete predecessor work.
  • Building dry in, permanent power readiness, equipment room turnover, and other critical milestones.
Field Leadership and Execution
  • Serve as the primary onsite field leader for the assigned scope and represent the Owner’s interests.
  • Maintain a visible field presence and conduct daily site walks.
  • Identify safety concerns, coordination issues, quality deficiencies, and schedule risks.
  • Support a behavioral based safety culture and high contractor safety standards.
  • Lead daily and weekly progress meetings with contractors, project management, design, and commissioning teams.
  • Hold contractors accountable for planned work, manpower, milestones, and issue resolution.
  • Communicate and escalate significant field issues.
Schedule and Productivity
  • Monitor progress against the integrated Primavera P6 schedule.
  • Confirm field activities support critical path milestones and turnover dates.
  • Track labor, installed quantities, concrete placement, excavation volumes, linear footage, and completed work areas.
  • Lead or participate in three week look ahead planning.
  • Identify manpower, material, equipment, access, design, and predecessor constraints.
  • Develop recovery plans when progress falls behind.
  • Review contractor schedule updates, milestone reporting, and progress claims.
Quality and Technical Oversight
  • Inspect work for compliance with contract documents, approved drawings, specifications, and quality requirements.
  • Lead first in place reviews and establish quality benchmarks.
Risk, Coordination, and Reporting
  • Evaluate risks to safety, schedule, quality, cost, access, and turnover.
  • Develop mitigation strategies with project leadership and contractors.
  • Track RFIs, submittals, design clarifications, field issues, and open decisions.
  • Support contractor change order reviews and verify schedule and cost impacts.
  • Coordinate among project management, design, engineering, quality, safety, commissioning, contractors, vendors, utilities, and local authorities.
  • Coordinate Owner furnished equipment deliveries, access, installation readiness, and commissioning integration.
  • Prepare daily field reports and weekly updates covering progress, manpower, safety, quality, milestones, risks, contractor performance, and recovery actions.
  • Maintain records of meetings, photos, inspections, progress metrics, and issue resolution.
Commissioning and Closeout
  • Support startup, testing, functional verification, and integrated systems commissioning.
  • Monitor turnover sequencing for building, mechanical, electrical, and system completion.
  • Coordinate contractor support for equipment startup and commissioning.
  • Drive punch list completion through ownership, tracking, and field verification.
  • Oversee as built drawings, operations and maintenance manuals, warranties, inspection records, and turnover packages.
Minimum Qualifications
  • Bachelor’s degree in Construction Management, Civil Engineering, Structural Engineering, Architecture, or a related field is preferred. Equivalent field experience will be considered.
  • At least 10 years of progressive experience managing large scale commercial, industrial, mission critical, advanced manufacturing, or data center construction.
  • Civil Lead candidates must have significant experience with site development, earthwork, underground utilities, stormwater, roads, paving, and site concrete.
  • Vertical Construction Lead candidates must have significant experience with structural, architectural, core and shell, building envelope, interiors, and building systems.
  • Data center or mission critical construction experience is strongly preferred.
  • Demonstrated field leadership, schedule management, quality control, contractor coordination, and issue resolution experience.
  • Ability to read and interpret drawings, specifications, schedules, submittals, and technical documents.
  • Proficiency with Microsoft Office and construction management platforms such as Primavera P6, Procore, or similar systems.
  • Strong communication, leadership, analytical, and problem solving skills.
  • Ability to work onsite in a fast paced construction environment.
  • Lean construction or continuous improvement experience is preferred.
Benefits
  • Medical, dental, and vision insurance.
  • Short term and long term disability coverage.
Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Construction Manager - Data Center
Construction Manager - Data Center

World Wide Professional Solutions • La Porte (IN)

On-site
Confidential
Construction Manager, Data Centers
Construction Manager, Data Centers

World Wide Professional Solutions • Wichita Falls (TX)

On-site
USD 85,000 - 120,000
Medical, dental, and vision insurance
Life insurance
Disability coverage
Construction Manager - Data Center
Construction Manager - Data Center

World Wide Professional Solutions • Vernon (TX)

On-site
USD 90,000 - 140,000
Medical, dental, and vision insurance
Life insurance
Short-term and long-term disability
Preconstruction Manager, La Porte, Indiana - Data Center
Preconstruction Manager, La Porte, Indiana - Data Center

World Wide Professional Solutions • La Porte (IN)

On-site
USD 100,000 - 170,000
Per diem eligibility
Travel support available
Relocation assistance
Project Manager, Data Centers
Project Manager, Data Centers

World Wide Professional Solutions • Vernon (TX)

On-site
USD 120,000 - 180,000
Medical, dental, and vision insurance
Life insurance
Disability coverage
Construction Manager, Data Centers
Construction Manager, Data Centers

World Wide Professional Solutions • Wichita Falls (TX)

On-site
USD 120,000 - 190,000
Medical, dental, and vision insurance
Life insurance
Short-term and long-term disability coverage
+2
Director, Site Manager - Data Center
Director, Site Manager - Data Center

World Wide Professional Solutions • Vernon (TX)

On-site
USD 180,000 - 250,000
Relocation assistance
Per diem
Benefits package
Project Executive – Data Center Construction
Project Executive – Data Center Construction

Peter Kazella and Associates, Inc • Chesterton (IN)

On-site
USD 120,000 - 210,000
Competitive salaries
Medical insurance
401(k) plan
+1
Project Executive - Data Center Construction
Project Executive - Data Center Construction

Gilder Search Group • Chesterton (IN)

On-site
USD 100,000 - 150,000
Competitive salary
401(k) plan
Medical insurance
CSA Project Manager - Data Center Construction
CSA Project Manager - Data Center Construction

Gilder Search Group • Chesterton (IN)

On-site
USD 120,000 - 180,000
Medical insurance
401(k) plan