Data Center Construction Land Surveyor

Actalent

West Fargo (ND)

On-site

USD 45,000 - 65,000

Full time

3 days ago
Be an early applicant

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

Actalent is seeking a Land Surveyor to support large-scale hyperscale data center developments in North Dakota and Texas. The role requires field operations, construction layout, utility surveying, as-built documentation, and QA/QC verification on major infrastructure projects.

You'll collaborate with engineers, project managers, and contractors to maintain schedules and ensure precise measurements in a fast-paced, onsite construction environment.

Qualifications

  • 3+ years of construction surveying experience.
  • Experience on large commercial, industrial, utility, or infrastructure projects.
  • Strong construction layout and as-built surveying.
  • QA/QC verification experience.
  • Ability to read civil/utility/electrical drawings.
  • Experience coordinating with field teams.
  • Strong organizational and communication skills.
  • Valid driver's license and ability to travel.

Responsibilities

  • Perform construction layout and control for utility and infrastructure installations.
  • Support underground utilities, electrical distribution, duct banks, and site development.
  • Establish project control networks and benchmarks.
  • Verify installation accuracy via field inspections and QA/QC.
  • Produce and maintain as-built documentation.
  • Coordinate with teams to resolve field conflicts and maintain schedules.
  • Interpret drawings, site plans, and specifications.
  • Support project managers and superintendents in daily operations.
  • Assist interface coordination between contractors.
  • Collect survey data using modern surveying technologies.

Skills

Construction surveying
Field coordination
QA/QC verification
Driver's license
Travel readiness

Tools

Leica
Trimble
Topcon
GPS/GNSS
Robotic total station

Job description

Land Surveyor - Hyperscale Data Center Construction

Help Build the Infrastructure Powering the Future

A leading mission-critical construction team is seeking a Land Surveyor to support large-scale hyperscale data center developments in North Dakota and Texas. This role is ideal for a survey professional who thrives in fast-paced construction environments and enjoys being at the center of complex utility, civil, and electrical infrastructure projects.

You will play a critical role in supporting field operations through construction layout, utility surveying, as-built documentation, QA/QC verification, and coordination between contractors, engineers, and project stakeholders. Your work will directly impact the successful delivery of some of the largest and most technically advanced data center campuses in the country.

What You'll Be Doing
  • Perform construction layout and control for major utility and infrastructure installations.
  • Support underground utility, electrical distribution, duct bank, stormwater, and site development activities.
  • Establish and maintain project control networks and benchmarks.
  • Verify installation accuracy through field inspections, measurements, and QA/QC processes.
  • Produce and maintain accurate as-built documentation throughout the project lifecycle.
  • Coordinate with civil, electrical, and construction teams to resolve field conflicts and maintain project schedules.
  • Interpret engineering drawings, site plans, utility plans, and specifications.
  • Work closely with project managers and superintendents to support day-to-day construction operations.
  • Assist with interface coordination between multiple contractors and disciplines.
  • Collect and process survey data using modern surveying technologies and software.
Required Qualifications
  • 3+ years of construction surveying experience.
  • Proven experience supporting large-scale commercial, industrial, utility, or infrastructure projects.
  • Strong understanding of construction layout, control, and as-built surveying.
  • Experience performing QA/QC verification for installed work.
  • Ability to read and interpret civil, utility, and electrical construction drawings.
  • Experience coordinating directly with field construction teams.
  • Strong organizational and communication skills.
  • Valid driver's license and ability to travel as needed.
Preferred Experience
  • Data center, mission-critical, power generation, utility, renewable energy, or industrial construction experience.
  • Experience working with electrical infrastructure, substations, medium-voltage systems, or underground utilities.
  • Familiarity with Leica, Trimble, Topcon, GPS/GNSS, and robotic total station equipment.
  • Experience supporting projects exceeding $100M in construction value.
  • Knowledge of BIM, Civil 3D, AutoCAD, or digital construction workflows.
Why This Opportunity?
  • Work on high-profile hyperscale data center campuses.
  • Long-term project pipeline across North Dakota, Texas, and future U.S. locations.
  • Exposure to cutting-edge construction and infrastructure projects.
  • Opportunity to work alongside industry-leading mission-critical construction teams.
  • Competitive compensation, travel support, benefits, and career advancement opportunities.
Ideal Backgrounds

Candidates with experience as any of the following are encouraged to apply:

  • Land Surveyor
  • Construction Surveyor
  • Survey Party Chief
  • Survey Technician
  • Site Engineer
  • Field Engineer
  • Utility Surveyor
  • Geomatics Technician
  • Construction Layout Specialist
  • Civil Surveyor
Make Your Mark

If you enjoy being in the field, solving complex construction challenges, and contributing to some of the largest data center developments in North America, we want to hear from you. Join a team helping deliver the infrastructure that powers the digital world.

Job Type & Location

This is a Contract to Hire position based out of West Fargo, ND.

Pay And Benefits

The pay range for this position is $40.00 - $40.00/hr.

Individual compensation offered for this position within this range will depend on many factors, including qualifications, skills, relevant experience, job knowledge, geographic location, internal equity, and other pertinent job-related factors.

Eligibility requirements apply to some benefits and may depend on your job classification and length of employment. Benefits are subject to change and may be subject to specific elections, plan, or program terms. If eligible, the benefits available for this temporary role may include the following: Medical, dental & vision Critical Illness, Accident, and Hospital 401(k) Retirement Plan Pre-tax and Roth post-tax contributions available Life Insurance (Voluntary Life & AD&D for the employee and dependents) Short and long-term disability Health Spending Account (HSA) Transportation benefits Employee Assistance Program Time Off/Leave (PTO, Vacation or Sick Leave)

Job Type & Location

This is a Contract to Hire position based out of West Fargo, ND.

Application Deadline

This position is anticipated to close on Nov 18, 2026.

Workplace Type

This is a fully onsite position in West Fargo,ND.

About Actalent

Actalent is a global leader in engineering and sciences services and talent solutions. We help visionary companies advance their engineering and science initiatives through access to specialized experts who drive scale, innovation and speed to market. With a network of almost 20,000 consultants and 5,000 clients across the U.S., Canada, Asia and Europe, Actalent serves many of the Fortune 500. We are proud to be an Engineering News-Record (ENR) Top 500 Design Firm for our engineering design services and a ClearlyRated Best of Staffing winner for both client and talent service.

The company is an equal opportunity employer and will consider all applications without regard to race, sex, age, color, religion, national origin, veteran status, disability, sexual orientation, gender identity, genetic information or any characteristic protected by law.

If you would like to request a reasonable accommodation, such as the modification or adjustment of the job application process or interviewing process due to a disability, please email actalentaccommodation@actalentservices.com for other accommodation options.

San Francisco Fair Chance Ordinance: Pursuant to the San Francisco Fair Chance Ordinance, for all positions located in the city and county of San Francisco, we will consider for employment qualified applicants with arrest and conviction records.

Massachusetts Lie Detector: It is unlawful in Massachusetts to require or administer a lie detector test as a condition of employment or continued employment. An employer who violates this law shall be subject to criminal penalties and civil liability.

Use of Artificial Intelligence (AI): We may use Artificial Intelligence (AI) to support parts of our hiring process, including sourcing, screening, and evaluating candidates. AI helps assess applications and qualifications, but final decisions are made by our hiring team. By applying, you acknowledge and agree that your application may be reviewed using AI tools.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Land Surveyor
Land Surveyor

Actalent • West Fargo (ND)

On-site
USD 45,000 - 65,000
Land Surveyor - Traveler
Land Surveyor - Traveler

Actalent • West Fargo (ND)

On-site
USD 45,000 - 65,000
Medical, dental & vision
401(k) Retirement Plan
PTO / Vacation
Data Center Land Surveyor
Data Center Land Surveyor

Actalent • Ellendale (ND)

On-site
USD 45,000 - 65,000
Medical, dental & vision
401(k) Retirement Plan
Life Insurance
Traveling Surveyor
Traveling Surveyor

Actalent • El Paso (TX)

On-site
USD 45,000 - 65,000
Superintendent
Superintendent

Actalent • Fargo (ND)

On-site
USD 100,000 - 180,000
Competitive base salary
Weekly per diem
Vehicle allowance
+3
SURVEYOR / FIELD ENGINEER
SURVEYOR / FIELD ENGINEER

Actalent • Temple (TX)

On-site
USD 75,000 - 115,000
Medical, Dental, Vision coverage
Paid time off
Nationally recognized projects
+3
SURVEYOR / FIELD ENGINEER
SURVEYOR / FIELD ENGINEER

Actalent • Boyce (LA)

On-site
USD 75,000 - 115,000
Medical, Dental, Vision Coverage
Paid Time Off & Holidays
Relocation assistance
+3
Project Engineer - Data Center
Project Engineer - Data Center

Actalent • Mount Pleasant (WI)

On-site
USD 55,000 - 76,000
Vehicle allowance
Comprehensive benefits
Bonus potential
Project Engineer
Project Engineer

Actalent • Cedar Rapids (IA)

On-site
USD 46,000 - 56,000
Medical, dental & vision
401(k) Retirement Plan
Life Insurance
+2
Construction Survey Project Manager
Construction Survey Project Manager

Actalent • Dallas (TX)

On-site
USD 120,000 - 160,000
Health benefits
Work-life balance
Professional development