Data Center Construction Carpenter – Formwork & Platforms

Maven Ventures

Southaven (MS)

On-site

USD 30,000 - 47,000

Full time

14 days+

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

SpaceXAI is hiring a Construction Carpenter to support data center construction in the Memphis/Southaven area. You will lay out, cut, assemble, and turn over temporary and permanent wood structures, formwork, platforms, stairs, and rails to enable other trades to work safely at height.

This hourly position expects overtime and requires travel between Southaven, MS and Memphis, TN. You will work on diverse tasks across civil, concrete, plumbing, electrical trades and must be able to lift 50 lbs

Qualifications

  • High school diploma or equivalent.
  • 3+ years of commercial/industrial carpentry experience.
  • Ability to read construction drawings, details, elevations, and work packages.
  • Proficiency with hand and power tools and layout tools.
  • Working knowledge of construction safety, fall protection, and PPE requirements.
  • Ability to lift 50+ lbs, work at heights and outdoors in all weather.

Responsibilities

  • Build, set, and strip concrete formwork, bulkheads and embeds for foundations and walls.
  • Construct work platforms, stairs, ladders, railings, and access structures for safe multi-trade work.
  • Frame and finish wood/light-gauge structures per drawings and specs.
  • Layout and cut lumber and related materials to drawings and site standards.
  • Maintain temp facilities and safety structures throughout construction.
  • Read drawings, produce as-built markups, and coordinate with other trades.
  • Follow fall protection, LOTO, PPE, hot-work and permit requirements on site.
  • Operate hand/power tools; climb structures; stage and store materials.
  • Coordinate with civil/concrete/plumbing/electrical teams for proper landings.
  • Support punch-list turnover with engineers and vendors.
  • Document work performed and keep as-built records.
  • Operate company vehicles and PPE storage routines.

Skills

Commercial carpentry
Read drawings
Tools & layout
Safety PPE
Lifting 50 lbs

Education

High school diploma

Tools

Laser level
Power saws
Nailers

Job description

SpaceXAI is hiring a Construction Carpenter to support data center construction in the Memphis/Southaven area. You will lay out, cut, assemble, and turn over temporary and permanent wood structures, formwork, platforms, stairs, and rails to enable other trades to work safely at height.

This hourly position expects overtime and requires travel between Southaven, MS and Memphis, TN. You will work on diverse tasks across civil, concrete, plumbing, electrical trades and must be able to lift 50 lbs

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Carpenter, Construction - Memphis
Carpenter, Construction - Memphis

X.ai • Southaven (MS)

On-site
USD 30,000 - 47,000
Field Materials Specialist - Data Center Construction
Field Materials Specialist - Data Center Construction

SpaceXAI • Southaven (MS)

On-site
USD 42,000 - 63,000
Field Materials Specialist - Data Center Construction
Field Materials Specialist - Data Center Construction

SpaceX Super Intelligence • Southaven (MS)

On-site
USD 22,000 - 36,000
Onsite Senior Data Center Construction Lead (Memphis)
Onsite Senior Data Center Construction Lead (Memphis)

X.ai • Southaven (MS)

On-site
USD 120,000 - 180,000
Data Center Construction Lead – Memphis (Onsite)
Data Center Construction Lead – Memphis (Onsite)

Precision Labs • Memphis (TN)

Hybrid
USD 120,000 - 180,000
Data Center Construction Lead — Memphis (Onsite)
Data Center Construction Lead — Memphis (Onsite)

SpaceXSI • Southaven (MS), Memphis (TN)

On-site
USD 110,000 - 170,000
Construction Manager, Structural - Memphis
Construction Manager, Structural - Memphis

Maven Ventures • Southaven (MS)

On-site
USD 120,000 - 180,000
Field Material Handler – Data Center Construction
Field Material Handler – Data Center Construction

Maven Ventures • Southaven (MS)

On-site
USD 21,000 - 30,000
Construction Manager, Electrical - Memphis
Construction Manager, Electrical - Memphis

Maven Ventures • Southaven (MS)

On-site
USD 110,000 - 160,000
Senior Structural Construction Lead, Data Center
Senior Structural Construction Lead, Data Center

xAI • Southaven (MS)

On-site
USD 120,000 - 180,000