Get a reply from this employer
Your resume and cover letter, tailored to exactly what they’re hiring for.
Insight Global is seeking a CSA Project Engineer to lead QA/QC and commissioning for mission-critical data center projects. You will develop and manage project-specific quality plans, oversee inspections, CAPAs, and supplier qualifications, and coordinate with field teams to ensure ISO 9001/QMS alignment and safety compliance on site.
You will drive the 3-phase QC process, coordinate with third-party testers, and contribute to commissioning plans, startup activities, and final turnover
Job Description
The CSA Project Engineer plays a critical role in ensuring the delivery of high-quality infrastructure through rigorous quality assurance and commissioning practices. This position leads the implementation of the project-specific quality and commissioning plan, driving excellence from project initiation through final turnover. The ideal candidate is detail-oriented, results-driven, and passionate about powering and securing mission-critical facilities.
Key Responsibilities:Quality Assurance & ControlDevelop, implement, and manage the project-specific Quality Control Plan.Lead the 3-Phase Quality Control process: preparatory, initial, and follow-up inspections.Conduct inspections of electrical installations per NEC, NFPA, IEEE, and project specifications.Document inspections, test results, and non-conformance reports (NCRs).Manage discrepancy notices, corrective actions, and preventive actions (CAPA).Oversee receipt inspections of all procured materials.Create and maintain detailed installation checklists and inspection logs.Coordinate with third-party testing agencies and implement recommendations.Support internal audits and ensure compliance with contract documents and specifications.
Commissioning & StartupAssist in developing and executing commissioning plans and startup documentation (MOPs, SBSs).Coordinate and supervise testing and startup activities.Ensure only approved equipment and materials are installed.Provide final quality documentation turnover packages.
Project Management & CoordinationCollaborate with project managers, engineers, subcontractors, and field teams.Attend and contribute to daily Operational Risk Management (ORM) and safety meetings.Participate in Owner/Architect/Contractor meetings and resolve quality issues.Track project performance and provide feedback to regional QA/Cx leadership.Support scheduling of quality, vendor, and commissioning activities to meet milestones.
Compliance & SafetyEnsure adherence to safety protocols including LOTO and arc flash.Represent the organization as a safety leader onsite.Conduct safety audits and participate in incident investigations.
rate is between 45-90/hr
Skills and Requirements
We are a company committed to creating diverse and inclusive environments where people can bring their full, authentic selves to work every day. We are an equal employment opportunity/affirmative action employer that believes everyone matters. Qualified candidates will receive consideration for employment without regard to race, color, ethnicity, religion, sex (including pregnancy), sexual orientation, gender identity and expression, marital status, national origin, ancestry, genetic factors, age, disability, protected veteran status, military or uniformed service member status, or any other status or characteristic protected by applicable laws, regulations, and ordinances. If you need assistance and/or a reasonable accommodation due to a disability during the application or the recruiting process, please send a request to HR@insightglobal.com.