An application made for this job — a tailored resume and cover letter that speak straight to the posting.
SFMTA, San Francisco, seeks a Project Manager I to oversee the surface level integration of the new CBTC system with existing traffic signal infrastructure. You will coordinate systems engineering, ensure compatible functionality, and work with staff and consultants to deliver timely transit improvements.
The role requires in-depth knowledge of traffic signal systems and ITS, including MUTCD, FHWA/FTA standards, and experience integrating ITS devices with D4 controller software.
The Planning and Delivery subdivision of the San Francisco Municipal Transportation Agency (SFMTA) is responsible for providing a safe, reliable and connected multimodal network. We are a team committed to transforming how projects are delivered and how people move. Our vision is rooted in vertical integration across the entire project delivery lifecycle and horizontal integration across all modes of transportation – including walking, biking, driving, and transit. The Muni Forward teamleads the development of projects aimed at reducing transit delays and enhancing the safety and comfort of Muni customers across all routes.
SFMTA is currently in the process of developing a new train control system. The Train Control Upgrade Project (TCUP) is a critical, once-in-a-generation investment to modernize and grow Muni Metro for decades to come. TCUP aims to replace the outdated system that currently controls our Metro trains in our subways with a new, state-of-the-art Communication-Based Train Control (CBTC) system, and extend the new system to all on-street Metro corridors.
APPOINTMENT TYPE:Temporary Exempt:This position is excluded by the Charter from the competitive Civil Service examination process and shall serve at the discretion of the Appointing Officer. The duration of this appointmentshall not exceed 36 months.
Application Opening:November 7, 2025
Application Deadline to Apply:November 21, 2025
Division:Streets
Section/Unit:Planning and Delivery/Muni Forward
Work Location:1 South Van Ness 7th Floor, San Francisco, CA 94103
Work Schedule:Monday through Friday, 8:30AM - 5:30PM
The Project Manager I (PM1) is responsible for the surface level integration of the new CBTC system with SFMTA’s existing traffic signal infrastructure. The work will include systems engineering to integrate various pieces of infrastructure to ensure compatible functionality (e.g. CBTC can communicate with traffic signal controller software and output the desired signal outcomes). The PM1 should possess expertise in traffic signal systems and Intelligent Transportation Systems (ITS), including but not limited to: signal timing parameters, traffic signal design, Transit Signal Priority (TSP), network communication protocols and devices, as well as familiarity with the Manual on Uniform Traffic Control Devices (MUTCD) and the systems engineering architecture and standards established by the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA). The candidate must also have prior experience overseeing the integration of ITS devices, such as TSP and emergency vehicle preemption, with the D4 traffic signal controller software.
The stated desirable qualifications may be used to identify candidates advancing to the interview process and/or to identify job finalist(s) at the end of the selection process when referred for hiring.
Falsifying one’s education, training, or work experience or attempted deception on the application may result in disqualification for this and future job opportunities with the City and County of San Francisco.
All your information will be kept confidential according to EEO guidelines.
This recruitment may be utilized to fill similar positions in this classification at SFMTA.
For questions or inquiries, please contact: Wilson Hoang, Human Resources Analyst at Wilson.Hoang@sfmta.com.
The City and County of San Francisco encourages women, minorities and persons with disabilities to apply. Applicants will be considered regardless of their sex, race, age, religion, color, national origin, ancestry, physical disability, mental disability, medical condition (associated with cancer, a history of cancer, or genetic characteristics), HIV/AIDS status, genetic information, marital status, sexual orientation, gender, gender identity, gender expression, military and veteran status, or other protected category under the law.