Thesis Work - Digital Factory (layout planning)

Scania Group

Södertälje kommun

Vor Ort

SEK 201.000 - 268.000

Vollzeit

14 Tage+

Erhalte eine Antwort von diesem Arbeitgeber

Dein Lebenslauf und dein Anschreiben, genau auf das zugeschnitten, was gesucht wird.

Schaffe es an den ATS-Filtern vorbei

Zusammenfassung

Scania CV AB in Södertälje invites Master’s students to work on a PFEP-driven multi-objective optimization of line-side material presentation and factory layout. You will review the PFEP rack generator and the previous layout optimization framework to formulate the station- or area-level problem and implement suitable optimization methods.

The project starts January 2027 for about 20 weeks, with 1-2 students, and includes evaluating solutions against a PFEP baseline and producing traceable

Qualifikationen

  • Master's degree in Applied Mathematics, Industrial Engineering, CS/AI, or Production Engineering.
  • Experience with optimization/OR, algorithms or simulation.

Aufgaben

  • Review the PFEP rack generator and previous layout optimization framework.
  • Formulate the station- or area-level problem.
  • Implement suitable optimization methods.
  • Define a traceable PFEP change set for article reassignment, rack reconfiguration and resource relocation.

Kenntnisse

Optimization
OR methods
Algorithms
Simulation
PFEP

Ausbildung

Master's in Applied Mathematics
Industrial Engineering
Computer Science/AI
Production Engineering

Jobbeschreibung

30 hp – Plan for Every Part-driven multi-objective optimization of line-side material presentation and factory layout
Introduction

Thesis work is an excellent way to get closer to Scania and build relationships for the future. Many of today's employees began their Scania career with their degree project.

Background

Digital factory planning requires continuity between material planning, resource configuration and factory layout. PFEP datasets describes article-level needs such as point of use, packaging, quantity, weight, and more. Ongoing Scania work uses PFEP datasets to generate line-side racks and pallets configurations in a virtual factory environment as part of a broader concept in production-and-logistics (P&L) data backbone. The next step is to utilize these PFEP generated configurations in virtual environment of station- or area-level multi-objective optimizations.

Objective

Develop and evaluate a multi-objective approach for jointly reconfiguring and positioning PFEP-generated line-side resources. Decision variables may include rack pose, rack and shelf configuration, article or package reassignment and within-shelf placement. Preserve PFEP traceability and return accepted results as structured PFEP change proposals.

Job Description

Review the PFEP rack generator and previous layout optimization framework; formulate the station- or area-level problem; and implement suitable optimization methods. Constraints may include geometry, package fit, access and material-flow rules. Objectives may include worker well-being, material flow or walking, logistics handling, area use and reconfiguration effort. Compare optimized solutions with a PFEP baseline in an industrial case and evaluate quality, robustness and computational performance. Define a traceable, user-approved PFEP change set for article reassignment, rack reconfiguration and resource relocation.

Education/program/focus

Master's in Applied Mathematics, Industrial Engineering, Computer Science/AI, Production Engineering or similar, with focus on optimization/OR, algorithms or simulation.

Number of students: 1-2

Start date for the thesis work: January 2027, or as agreed

Estimated time required: 20 weeks

Contact persons and supervisors

Scania CV AB, Global Industrial Development, Södertälje.

Andreas Lind, andreas.lind@scania.com

A background check might be conducted for this position. We are conducting

interviews continuously and may close the recruitment earlier than the date specified.

Hol dir deinen kostenlosen, vertraulichen Lebenslauf-Check.

oder ziehe deine Datei hierhin.

Similar jobs

Ähnliche Jobs, die dir auch gefallen könnten

Thesis: Digital Factory Layout & Multi-Objective Optimization
Thesis: Digital Factory Layout & Multi-Objective Optimization

Scania Group • Södertälje kommun

Vor Ort
SEK 201.000 - 268.000
Thesis Work - Shaping the Future of Production Planning with Digitalization and AI
Thesis Work - Shaping the Future of Production Planning with Digitalization and AI

Volvo Construction Equipment • Eskilstuna kommun

Vor Ort
SEK 201.000 - 268.000
Thesis Work - Automation utilizing Computer Vision
Thesis Work - Automation utilizing Computer Vision

Scania Group • Södertälje kommun

Vor Ort
SEK 134.000 - 179.000
AI-Enhanced Production Planning: Digitalization Thesis
AI-Enhanced Production Planning: Digitalization Thesis

Volvo Construction Equipment • Eskilstuna kommun

Vor Ort
SEK 201.000 - 268.000
Thesis Work - Developing a Training Approach for Data-Driven Production
Thesis Work - Developing a Training Approach for Data-Driven Production

Volvo Construction Equipment • Eskilstuna kommun

Vor Ort
SEK 201.000 - 268.000
Thesis worker - Design of a Combined Endurance and Vibration Test Rig for Embedded Actuator Validati
Thesis worker - Design of a Combined Endurance and Vibration Test Rig for Embedded Actuator Validati

Scania Group • Södertälje kommun

Vor Ort
SEK 156.000 - 201.000
Academic collaboration
Industrial exposure
Project Manager
Project Manager

SCANIA CV AKTIEBOLAG • Ströpsta

Vor Ort
SEK 750.000 - 1.100.000
Health center access
Wellness allowance
Result bonus
+2
Thesis Student
Thesis Student

Scania Group • Södertälje kommun

Vor Ort
SEK 134.000 - 167.000
Project Manager
Project Manager

Scania CV AB • Södertälje kommun

Vor Ort
SEK 900.000 - 1.150.000
Health centre Gröndal
Wellness allowance
Performance bonus (result bonus)
+3
Project Manager
Project Manager

SCANIA Aktiebolag • Södertälje kommun

Vor Ort
SEK 850.000 - 1.100.000
Health benefits
Wellness allowance
Performance bonus
+3