Radiologic Tech Instructor: Part-Time & Impactful

ICCT Colleges Foundation Inc.

Cainta

On-site

PHP 167,400 - 256,680

Part time

14 days+

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

ICCT Colleges Foundation Inc. in the Rizal area invites applications for a Part Time Radiologic Technology Instructor at the Cainta Campus.

The successful candidate will teach consistently high quality lessons in radiologic technology and serve as a role model for students. The role requires a BS Radiologic Technology, a PRC license, and teaching experience is an advantage; a Master’s degree in a medical-related field is preferred.

Qualifications

  • BS Radiologic Technology graduate.
  • PRC license; teaching experience an advantage.
  • Master's degree preferred in a medical-related field.

Responsibilities

  • Teach consistently high quality lessons
  • Be a role model for students, inspiring them to be actively interested in their field of specialization
  • To follow the school policies and procedures
  • To maintain discipline in accordance with the school procedures and to encourage good practice with regard to punctuality, behavior, standards of work and homework
  • Ensuring a high quality learning environment within their field of specialization
  • Willing to work in Rizal area

Skills

Teaching
Role modelling

Education

BS Radiologic Technology
Master's Degree in medical-related field

Job description

ICCT Colleges Foundation Inc. in the Rizal area invites applications for a Part Time Radiologic Technology Instructor at the Cainta Campus.

The successful candidate will teach consistently high quality lessons in radiologic technology and serve as a role model for students. The role requires a BS Radiologic Technology, a PRC license, and teaching experience is an advantage; a Master’s degree in a medical-related field is preferred.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Radiologic Technology Instructor — Inspire, Teach, Lead
Radiologic Technology Instructor — Inspire, Teach, Lead

ICCT Colleges Foundation, Inc. • Cainta

On-site
PHP 335,000 - 502,000
Radiologic Technology Instructor: Inspire Students
Radiologic Technology Instructor: Inspire Students

ICCT Colleges Foundation Inc. • Cainta

On-site
PHP 180,000 - 360,000
Radiologic Technology Instructor (Part Time)
Radiologic Technology Instructor (Part Time)

ICCT Colleges Foundation Inc. • Cainta

On-site
PHP 167,400 - 256,680
Radiologic Technology Instructor (Full Time)
Radiologic Technology Instructor (Full Time)

ICCT Colleges Foundation, Inc. • Cainta

On-site
PHP 335,000 - 502,000
Medical Technology Instructor - Part-Time Educator
Medical Technology Instructor - Part-Time Educator

ICCT Colleges Foundation, Inc. • Cainta

On-site
PHP 167,000 - 246,000
Radiologic Technology Instructor (Full Time)
Radiologic Technology Instructor (Full Time)

ICCT Colleges Foundation Inc. • Cainta

On-site
PHP 180,000 - 360,000
Medical Technology Educator: Inspire Learning & Standards
Medical Technology Educator: Inspire Learning & Standards

ICCT Colleges Foundation, Inc. • Cainta

On-site
PHP 279,000 - 502,000
Part-Time Medical Technology Educator | Inspire Future MedTech
Part-Time Medical Technology Educator | Inspire Future MedTech

ICCT Colleges Foundation Inc. • Rizal

On-site
PHP 134,000 - 268,000
Medical Technology Instructor (Part Time)
Medical Technology Instructor (Part Time)

ICCT Colleges Foundation Inc. • Rizal

On-site
PHP 134,000 - 268,000
Radiologic Technology Instructor & Mentor (RRT/BSRT)
Radiologic Technology Instructor & Mentor (RRT/BSRT)

St. Jude College Dasmariñas, Cavite Inc. • Dasmariñas

On-site
PHP 279,000 - 446,000
Government Mandatory Benefits (SSS, PH
13th Month Pay
Top locations