A complete application in a minute
Tailored resume and cover letter, ready to send.
The National Grid Corporation of the Philippines (NGCP) seeks personnel to implement contracted and in-house parcellary survey projects. You will assist in land, topographic, hydrographic, and construction surveys, perform field data gathering, measurements and site verification, and operate ETS, GNSS, and CAD tools such as Civil 3D, GIS, and NMax.
Coordination with engineers and field staff is essential to ensure accurate outputs and compliance with safety standards.
Responsible for the implementation of contracted and in-house parcellary survey projects;
Assist in conducting land, topographic, hydrographic, and construction surveys
Perform field data gathering, measurements, and site verification activities
Operate surveying equipment such as (but not limited to) Electronic Total Stations (ETS), Global Navigation Satellite System (GNSS), and in computer aided drawings such as (but not limited to) Civil 3D, GIS, NMax, or its equivalent.
Coordinate with engineers, clients, and field personnel regarding project requirements and updates
Ensure accuracy, completeness, and proper documentation of survey outputs
Monitor compliance with project specifications, safety standards, and surveying regulations
The National Grid Corporation of the Philippines (NGCP) holds the franchise to operate and maintain the Philippines’ electricity transmission network. It delivers safe and reliable electricity throughout the archipelago.
As the system operator of the power grid, NGCP balances the demand and supply of electricity to efficiently serve all of its customers which are generators, private distribution utilities, electric cooperatives, government-owned utilities, ecozones, industries, and directly connected companies.
As the only transmission utility firm in the country, NGCP performs a significant role in nation building by providing the necessary infrastructure to deliver electricity where it is needed --whether in far flung communities or in urban centers.
History
Incorporated in 2008, the private corporation won the bidding for the franchise to operate and maintain the country's transmission network. It was the biggest government auction conducted in efforts to reform the local power sector.
The 50-year franchise provides NGCP with the right to operate, maintain, expand and further develop the country's power transmission system which involves 19, 425 circuit kilometers of transmission lines and 23, 853 megavolt amperes (MVA) of substation capacity.
The National Grid Corporation of the Philippines (NGCP) holds the franchise to operate and maintain the Philippines’ electricity transmission network. It delivers safe and reliable electricity throughout the archipelago.
As the system operator of the power grid, NGCP balances the demand and supply of electricity to efficiently serve all of its customers which are generators, private distribution utilities, electric cooperatives, government-owned utilities, ecozones, industries, and directly connected companies.
As the only transmission utility firm in the country, NGCP performs a significant role in nation building by providing the necessary infrastructure to deliver electricity where it is needed --whether in far flung communities or in urban centers.
History
Incorporated in 2008, the private corporation won the bidding for the franchise to operate and maintain the country's transmission network. It was the biggest government auction conducted in efforts to reform the local power sector.
The 50-year franchise provides NGCP with the right to operate, maintain, expand and further develop the country's power transmission system which involves 19, 425 circuit kilometers of transmission lines and 23, 853 megavolt amperes (MVA) of substation capacity.