Job Summary
We are looking for an experienced Project Manager to lead the end-to-end execution of Supply, Installation, Testing Commissioning (SITC) projects for LV/MV electrical panels. The role owns projects from order receipt through drawing approval, manufacturing coordination with the plant, site installation, testing, commissioning and final handover. Hands-on experience in data centre projects is Beneficial, zas is a willingness to travel to and stay at project sites as required.
Key Responsibilities
- 1. Project Planning Execution Prepare detailed project execution plans, schedules (MS Project / Primavera) and resource plans from the purchase order and technical specifications.
- Drive projects through the full SITC cycle - engineering, procurement, manufacturing, dispatch, installation, testing, commissioning and handover.
- Track progress against baseline schedule, cost and quality targets; publish regular progress reports to management and customers.
- Manage project budgets, variations, change orders and billing milestones to protect margins and cash flow.
- 2. Customer Management Act as the single point of contact for customers, consultants, PMCs and EPC contractors throughout the project.
- Conduct kick-off meetings, progress reviews and site coordination meetings; maintain minutes and action trackers.
- Manage customer expectations, resolve technical and commercial issues promptly, and build long-term relationships for repeat business.
- Coordinate customer inspections, Factory Acceptance Tests (FAT) and witness tests.
- Ensure timely collection of payments and closure of punch points, handover documents and completion certificates.
- 3. Drawing Document Approval Coordinate with the design team for preparation of GA drawings, SLDs, schematics, wiring diagrams, BOMs and cable schedules.
- Submit drawings and technical documents to customers/consultants, track comments and secure approvals within agreed timelines.
- Manage revision control and ensure only approved drawings are released to the plant for manufacturing.
- Prepare and submit QAP, test procedures, OM manuals and as-built drawings.
- 4. Internal Plant Operations Coordination Coordinate with design, purchase, production, QA/QC, stores and dispatch teams to meet manufacturing and delivery schedules.
- Release approved drawings and BOMs to production and follow up on material availability and long-lead items (breakers, busbars, relays, enclosures).
- Monitor shop-floor progress, resolve bottlenecks and ensure in-house testing and quality checks are completed before dispatch.
- Plan logistics, packing and dispatch in line with site readiness.
- 5. Site Execution, Testing Commissioning Travel to project sites to supervise installation, cable termination, testing and commissioning of panels.
- Manage site engineers, technicians and subcontractors; ensure adherence to safety (HSE) norms and statutory requirements.
- Coordinate pre-commissioning checks, IR / HV tests, relay testing, functional checks and integration with other systems (DG, UPS, BMS/EPMS).
- Close punch lists, obtain SAT sign-off and ensure smooth handover to the customer.
- 6. Planning Risk Mitigation Identify technical, commercial, schedule and site risks early; maintain a risk register with mitigation and contingency plans.
- Anticipate delays in approvals, materials or site readiness and take corrective action proactively.
- Ensure contractual compliance, including LD clauses, warranties and scope boundaries.
- Conduct project close-out reviews and capture lessons learned for future projects.
- Data Centre Project Experience
- Main LT Panels (PCC/MCC), Power Distribution Units (PDUs), UPS input/output panels, AMF/synchronisation panels and busduct interfaces.
- Understanding of redundancy architectures (N, N+1, 2N) and Tier III / Tier IV design requirements.
- Working within fast-track schedules, strict quality documentation and multi-stakeholder environments (owner, consultant, PMC, EPC).
- Integrated System Testing (IST) and Level 1-5 commissioning processes.
Required Qualifications Experience
- B.E. / B.Tech in Electrical Engineering.
- Minimum 5 years of experience in project management of SITC of LV/MV electrical panels.
- Proven track record of delivering at least one data centre project end to end.
- Sound knowledge of relevant standards - IEC 61439.
- Working knowledge of AutoCAD (reading/reviewing drawings), MS Project / Primavera and MS Office.
- PMP or equivalent project management certification will be an advantage.
Key Skills Competencies
- Planning: Strong project planning, scheduling and cost control.
- Customer Handling: Confident, professional communication with customers and consultants.
- Coordination: Ability to align design, production and site teams toward common deadlines.
- Problem Solving: Quick, practical decision-making under site pressure.
- Leadership: Leading site teams and subcontractors safely and efficiently.
- Mobility: Willing to