EMS Planner - PPC

Exicom

Hyderabad

Presencial

INR 1 200 000 - 1 800 000

Tempo integral

Há 6 dias
Torna-te num dos primeiros candidatos

Recebe uma resposta deste empregador

O teu currículo e carta de apresentação, adaptados exatamente ao que estão a contratar.

Ultrapassa os filtros ATS

Resumo da oferta

Exicom in Hyderabad is seeking a seasoned PCBA Planner to own end-to-end planning for a diverse PCBA portfolio, coordinating with Supply Chain to secure components and align with box-build schedules.

You will manage SKU-level production plans for 50+ PCB types, optimize line utilization, manage WIP, and support NPI/ECO transitions in a fast-paced electronics manufacturing environment.

Qualificações

  • 10+ years of experience in production/materials planning within electronics.
  • Experience planning across high-mix, variable-volume portfolios.
  • Proficient in ERP/MRP and BOM management.

Responsabilidades

  • Develop SKU-level PCBA production plans for 50+ board types.
  • Coordinate with Supply Chain to secure components and manage shortages.
  • Align PCBA schedules with box-build and NPI/ECO transitions.

Conhecimentos

Supply chain planning
Production planning
Data analysis
Cross-functional collaboration

Formação académica

Bachelor’s degree in Supply Chain Management
Electronics/Electrical Engineering

Ferramentas

SAP
Oracle
NetSuite
Excel
Power BI

Descrição da oferta de emprego

PCBA Planner

Electronic Component & Production Planning

DEPARTMENT

Production Planning


REPORTS TO

Production Planning Manager


EMPLOYMENT TYPE

Full-Time


LOCATION

On-site, Manufacturing Facility, HYD


Job Summary

We are seeking a detail-oriented PCBA Planner to own end-to-end planning for printed circuit board assembly (PCBA) across a diverse product portfolio of 50+ board types, ranging from low-complexity, high-volume boards to high-complexity, low-volume boards. This role sits at the intersection of supply chain and production planning: it requires close coordination with Supply Chain / Procurement to secure the availability of electronic components, and detailed, SKU-level PCBA build planning that is tightly synchronized with the system-level and box-build (final assembly) production plan. The ideal candidate combines strong analytical and organizational discipline with a practical understanding of electronics manufacturing, and is comfortable managing complexity and ambiguity across many concurrent programs.


Key Responsibilities

1. Component Availability & Supply Chain Coordination

  • Work closely with Supply Chain, Procurement, and Commodity Managers to track and confirm availability of electronic components (ICs, passives, connectors, modules, etc.) required for each PCBA build.
  • Proactively identify component shortages, long lead-time items, allocation risks, and single-source exposure; elevate early with clear impact statements (which PCBAs, which builds, which dates are at risk).
  • Translate PCBA build plans into time-phased component requirements (MRP/MPS logic) and reconcile against supplier commitments, purchase orders, and inventory on hand.
  • Coordinate expedites, alternate/second-source parts, and substitutions with engineering and supply chain, ensuring BOM and approved-vendor-list (AVL) compliance.
  • Maintain visibility of incoming material (ETA tracking) and proactively resequence PCBA builds when shortages or delays occur, minimizing line stoppages.

2. PCBA Build Planning & Scheduling

  • Develop and maintain detailed, SKU-level production plans and schedules for 50+ PCBA types, spanning high-volume/low-complexity boards and low-volume/high-complexity boards, balancing SMT line capacity, kitting readiness, and labor availability.
  • Sequence and prioritize PCBA runs to maximize SMT/THT line efficiency minimizing changeovers, setup time, and stencil/feeder changes while protecting on-time delivery.
  • Convert system-level and box-build (final product) plans into the corresponding PCBA demand and build schedule, ensuring the right boards are ready in the right quantities at the right time for downstream assembly.
  • Continuously reconcile the PCBA plan against the box-build plan as demand, engineering changes, or supply constraints shift, keeping both plans synchronized.
  • Plan and track work-in-process (WIP) buffers, safety stock, and kit completeness to avoid starving or overloading assembly lines.
  • Support new product introduction (NPI) and engineering change order (ECO) transitions by planning cut-in points, phase-out of legacy boards, and material disposition.

3. Efficiency, Loss Reduction & Cross-Functional Alignment

  • Identify and drive opportunities to improve planning efficiency, reduce excess/obsolete (E&O) inventory, minimize scrap, and lower carrying costs across the PCBA portfolio.
  • Monitor and report key planning metrics: schedule adherence, line utilization, component fill rate, shortage aging, inventory turns, and E&O exposure.
  • Participate in daily/weekly production and S&OP (sales & operations planning) meetings, representing the PCBA plan and flagging risks to overall production targets.
  • Partner with manufacturing engineering, quality, and test teams to align capacity plans with real line performance and yield.
  • Maintain accurate planning data in the ERP/MRP system (BOMs, routings, lead times, lot sizes) and drive continuous improvement of planning parameters.

Required Qualifications & Experience

  • Bachelor’s degree in Supply Chain Management, Industrial Engineering, Electronics/Electrical Engineering, Operations Management, or a related field (equivalent experience considered).
  • 10+ years of experience in production/materials planning, supply chain, or manufacturing operations within an electronics or PCBA/EMS manufacturing environment.
  • Demonstrated experience planning across a large, mixed portfolio of part numbers/products (high-mix, variable-volume environment).
  • Working knowledge of electronic components, BOM structures, and SMT/PCBA manufacturing processes (SMT, THT, reflow, AOI, ICT/functional test).
  • Hands-on experience with ERP/MRP systems (e.g., SAP, Oracle, NetSuite, Infor, or similar) for demand planning, material requirements, and scheduling.
  • Strong proficiency in Excel (pivot tables, lookups, data analysis); experience with planning/BI tools (e.g., Power BI, Tableau) is a plus.
  • Strong analytical, organizational, and problem-solving skills with proven attention to detail and accuracy in high-volume data environments.

Preferred / Desired Skills

  • Experience planning in both high-volume/low-mix and low-volume/high-mix (or high-complexity) manufacturing environments simultaneously.
  • Familiarity with S&OP, capacity planning, and finite/constraint-based scheduling concepts.
  • Exposure to supplier management, component obsolescence management, and second-sourcing strategies.
  • Understanding of Lean/Six Sigma or continuous-improvement methodologies applied to planning and inventory efficiency.
  • APICS/ASCM certification (CPIM, CSCP) or equivalent is a plus.
  • Experience supporting NPI programs and coordinating with engineering during design/BOM transitions.

Key Competencies

  • Detail-oriented and highly organized — able to manage complex, high-SKU planning without losing accuracy.
  • Systems thinker — able to connect component-level constraints to PCBA schedules to the overall box-build/system plan.
  • Strong cross-functional communicator — comfortable coordinating daily with supply chain, procurement, manufacturing, and engineering.
  • Proactive and data-driven — anticipates risk rather than reacting to it, and backs decisions with data.
  • Resilient under ambiguity — comfortable re-planning quickly as components, demand, or engineering changes shift.

Success Metrics (Illustrative)

  • On-time PCBA availability to meet box-build/system production schedule.
  • Component shortage incidents and average shortage-to-resolution time.
  • SMT/PCBA line utilization and changeover efficiency.
  • Inventory turns and excess & obsolete (E&O) inventory levels.
  • Forecast/plan accuracy at the PCBA and component level.
Obtém a tua avaliação gratuita e confidencial do currículo.

ou arrasta e larga o ficheiro aqui.

Similar jobs

Ofertas semelhantes que vale a pena comparar

Electronic Component & Production Planning - PPC
Electronic Component & Production Planning - PPC

Exicom • Hyderabad

Presencial
INR 1 800 000 - 2 600 000
PCBA Planner
PCBA Planner

Exicom • Hyderabad

Presencial
INR 1 800 000 - 2 400 000
Assistant Manager - PPC (Production Planning & Control)
Assistant Manager - PPC (Production Planning & Control)

Cyient DLM • Mysuru

Presencial
INR 1 500 000 - 2 100 000
Production Engineer
Production Engineer

Tata Electronics Limited • Vemagal

Presencial
INR 900 000 - 1 500 000
Production Planner
Production Planner

Undo World • Gurugram District

Presencial
INR 900 000 - 1 500 000
Production Engineer
Production Engineer

Tata Electronics (TEPL) • Vemagal

Presencial
INR 1 500 000 - 2 300 000
Planning Lead- Supply Chain Management
Planning Lead- Supply Chain Management

Tata Electronics • Assam

Presencial
INR 4 000 000 - 7 000 000
"Site Supply Planner (Electronic Manufacturing Company)”
"Site Supply Planner (Electronic Manufacturing Company)”

Aarna HR Solutions Pvt Ltd • Bengaluru

Presencial
INR 800 000 - 1 200 000
Production Planning Manager
Production Planning Manager

Cyient Limited • Mysuru

Presencial
INR 1 200 000 - 2 600 000
Planner
Planner

Cavalier Wireless • Kochi

Presencial
INR 400 000 - 700 000