Eine vollständige Bewerbung in einer Minute
Maßgeschneiderter Lebenslauf und Anschreiben – versandbereit.
Amelia Coal Mine in Madhya Pradesh invites an experienced Mining Planning professional to drive monthly and quarterly planning, optimizing equipment utilization and coal quality in line with site ground conditions.
The role requires close collaboration with site teams to achieve production targets, ensure safety compliance, and implement continuous improvement, training, and capability-building for future leaders in mining operations.
BUSINESS_UNIT-1 Amelia Coal Mining Limited
BUSINESS_UNIT-2 Amelia Coal Mining Limited
BUSINESS_UNIT-3 Amelia Coal Mining Limited
DEPARTMENT-1 Mining Services
Country India
Function Mining
Planning
DXPF3.Bachelor of Engineering
Amelia Coal Mine is located in the Main basin of Singrauli Coalfield, Singrauli District of Madhya Pradesh (~37 km from Singrauli City). The block has been allotted to THDC India Limited, a Mini Ratna Public Sector Undertaking (Joint Venture of NTPC Limited and Government of Uttar Pradesh). THDC has appointed Amelia Coal Mining Limited as their MDO. In FY2023, ACML has begun Overburden Removal and Coal Production. State of Art Technology utilized in Amelia Coal Mine is combination of shovels and dumpers and Surface Miners. Amelia Coal Mine is currently in the ramp-up phase with Peak Rated Capacity (PRC) of 5.6 Million Tonnes Per Annum. Scope of the MDO includes Access to Site, Finance, deploy HEMM, Operate and Maintain Mine, excavate and deliver coal; Construction and Maintain of Coal Handling Plant (CHP), infrastructure including Conveyor (Mine to Railway Siding), Railway Siding, Approach and Access Roads; Arrange Power Supply, Undertake Land Acquisition, R&R, obtain possession of land, procure and renew EC, FC, licenses, permits, etc. Job Challenges: Some of the major challenges includes achievement and maintain peak coal production and overburden removal, ensure safe operation, maintain coal quality, shifting of Project PDFs, facilitate land acquisition, physical possession of land, implementation of R&R policy, construction, operation and maintenance of Coal Handling Plant (CHP), Coal Conveyor and Railway Siding, compliance with statutory norms, renewal/ amendment of statutory clearances, undertake progressive mine closure, facilitate smooth operation and comply with the requirements as per terms of contract with THDC, Contractors, Sub-Contractors, etc.