A complete application in a minute
Tailored resume and cover letter, ready to send.
Focus Management Consultants is seeking a senior engineering leader to run Indras Design & Engineering for mechanical, piping, E&I and CAD. You will sign the Engineering Release within 14 days of every PO, co-sign costing, and own the BOQ as the procurement basis.
You will lead a multi-disciplinary team, review P&IDs, layouts and SLDs, and drive milestone delivery with a 14-day clock. Location: Thane, Mumbai with site visits.
Your role is to run Indras Design & Engineering department process, mechanical and piping, electrical and instrumentation, and CAD and to sign the Engineering Release for every project within 14 days of purchase order. You co-sign the costing before a PO is accepted, you hold the released bill of quantities as the only basis for procurement, and you are accountable for the design quality of every plant Indra hands over.
You will be measured on a published scorecard. In outline:
1. Sign the Engineering Release. Within 14 days of PO for every project, all sizes: P&ID, equipment and civil layouts, piping isometrics, technical submittal, load list, I/O list, control philosophy and BOQ including the site spares kit. A partial issue is not a release. Nothing is bought before your signature
2. Co-sign the costing. Review every proposals cost build-up before a PO is accepted; what you sign is the baseline the project is measured against at handover.
3. Own the BOQ. The released BOQ is the only purchasing basis; additions after release count against Design & Engineering. Track them to zero.
4. Run the department to the clock. Set internal milestones inside the 14 days (process by day 7, mechanical and E&I by day 12), review the release board weekly, and know on day 7 whether day 14 is at risk.
5. Lead the engineers and CAD. Two process, two mechanical, one E&I, three CAD at full strength. Set and review each persons scorecard monthly; hire to fill the gaps in your first six months.
6. Attribute and reduce rework. Maintain the drawing revision log; agree attribution with the Project Manager on every revision; bring D&E-caused rework to two or fewer per project.
7. Build the standards. Standard P&IDs, module layouts and BOQ templates for the ElectroX range (51,000 KLD), so that release time falls with every repeat
We hire for attitude, not just skill. Skills can be taught; attitude cannot. The right candidate demonstrates:
Your signature on an Engineering Release is final: nobody buys around it, including the founders and the sales team. You will have the engineers to hold the 14-day clock.
If you are interested then share your Updated resume on recruit5@focusonit.com