Off Track Build Lead (Sport Signage)

Wasserman

Orpington

Hybrid

GBP 70,000 - 120,000

Full time

12 days ago

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

THE·TEAM seeks an Off-Track Build Lead to drive safe, efficient delivery of the off-track build scope for Formula 1 events. You will lead on-site teams, coordinate labour, materials, tools and plant, and ensure builds meet design intent within strict deadlines.

You will translate scope into practical plans, manage procurement, oversee health and safety, and collaborate with design and installation teams across international venues.

Qualifications

  • Significant practical experience in event build, bespoke fabrication, temporary structures, signage or a comparable environment.
  • Experience leading on-site build teams and coordinating labour, materials, tools and plant.
  • Strong practical understanding of construction and assembly methods relevant to temporary event delivery.
  • Experience reading drawings and technical information and delivering to immovable deadlines.
  • Strong safety awareness and practical problem-solving capability.
  • International event or motorsport experience is advantageous; Formula 1 experience is highly advantageous.
  • Event build management and crew leadership.
  • Build sequencing, practical construction and assembly.
  • Reading technical drawings and applying build methodologies.
  • Resource, materials, tools and plant planning.
  • Quality management, H&S implementation and problem solving.
  • Productivity management, cost awareness and cross-functional coordination.

Responsibilities

  • 1. Scope & Pre-Event Planning: Understand deliverables, locations, drawings, specifications, programme and completion requirements.
  • 2. Build Programme & Sequencing: Break scope into work packages and establish dependencies and handover points.
  • 3. Team Leadership: Lead employees, contractors, freelancers and specialist personnel; provide direction and requirements.
  • 4. Design & CAD Interface: Work with Design to understand buildability and use CAD for drawings and methods.
  • 5. Materials, Procurement & Assets: Identify material requirements and coordinate with Procurement and Operations.
  • 6. Tools, Plant & Logistics: Determine tools, access equipment and coordinate delivery, storage and returns.
  • 7. Interfaces with Installation & Compound: Define boundaries and handovers with installation and compound teams.
  • 8. Health, Safety & Quality: Implement H&S controls; stop work if unsafe; manage quality and snagging.
  • 9. Scope, Cost & Productivity: Track scope, manage additional requests, monitor labour and materials.
  • 10. Dismantling & Continuous Improvement: Plan dismantling and capture lessons for future events.

Skills

Event build management
Team leadership
Construction methods
Reading drawings
Safety awareness
Motorsport experience
Productivity management
Resource planning
Quality management
Cross-functional coordination
Materials planning

Tools

CAD

Job description

THE·TEAM is proud to provide representation and marketing services to talent, brands and properties across 28 countries and more than 70 cities worldwide. Shaped by our belief in the unifying power of sports, music and entertainment, THE·TEAM leads with intelligence, ideas and influence. For more information, please visit the.team. This role sits within our Sport Signage group. Sport Signage specialises in racetrack and sports-event signage, offering end-to-end services from creative design and production to logistics, installation and software solutions. Backed by decades of global experience, our skilled team delivers bespoke design concepts, on-site printing, ground painting, LED displays and sustainable materials to transform circuits into completely immersive, branded environments. Sport Signage are looking for a Off-Track Build Lead to join our Operations / F1 Event Delivery team. The Off-Track Build Lead is responsible for the safe, efficient and high-quality delivery of the assigned off-track build scope at Formula 1 events.

KEY INFORMATION:

Office Location: This role can be based in either the Amberg, Germany or Orpington, London office

Office Policy: Hybrid – 3 days in the office

Travel requirement: Extensive international travel throughout the Formula 1 season

WHAT YOU WILL BE DOING:
  1. 1. Scope & Pre-Event Planning

    Understand the agreed deliverables, locations, drawings, specifications, programme and completion requirements.

    Translate the scope into a practical build plan covering labour, materials, plant, access, storage, technical information and dismantling.

    Identify missing information, unrealistic assumptions or resourcing gaps early enough for corrective action before mobilisation.

  2. 2. Build Programme & Sequencing

    Break the scope into clear work packages and establish critical activities, dependencies and handover points.

    Coordinate sequencing with the Operations Manager and other event workstreams.

    Monitor progress continuously and implement recovery actions where delivery falls behind programme.

  3. 3. Team Leadership

    Lead assigned employees, contractors, freelancers and specialist personnel.

    Provide clear daily direction, task allocation, expected output, methodology, quality and safety requirements.

    Allocate resources according to skill and experience, monitor productivity and address performance issues appropriately.

  4. 4. Design & Technical/CAD Interface

    Work with Design to understand design intent and identify buildability issues before mobilisation.

    Use Technical/CAD for technical drawings, details, build methodology, connections, fixing approaches and technical problem solving.

    Do not independently change approved design or technical intent where review or approval is required.

  5. 5. Materials, Procurement & Assets

    Identify material requirements and communicate them early to Procurement and the Operations Manager.

    Work with Inventory & Asset Management to ensure owned assets are available, prepared, controlled on site and correctly returned.

    Raise shortages, incorrect materials, damage or quality concerns promptly and avoid unnecessary emergency purchasing.

  6. 6. Tools, Plant & Logistics

    Determine required tools, access equipment, lifting equipment, vehicles and specialist plant.

    Coordinate delivery timing, unloading, storage, build‑area access, plant positioning, returns and onward movements with Logistics.

    Ensure equipment is suitable and used by competent or authorised personnel where required.

  7. 7. Interfaces with Installation & Compound

    Agree clear boundaries and handovers with the Installation Manager where workstreams interact.

    Coordinate shared labour, plant, access or site areas through the Operations Manager.

    Work with the Compound Manager on storage, tools, consumables, waste and other compound support.

  8. 8. Health, Safety & Quality

    Implement the applicable H&S controls, methodologies, venue rules, PPE, lifting, work-at-height and housekeeping requirements in the workstream.

    Stop work where it cannot safely continue and elevate significant concerns.

    Inspect quality throughout the build, manage snagging and resolve defects before handover wherever reasonably possible.

  9. 9. Scope, Cost & Productivity

    Understand the approved scope and ensure additional requests are visible to the Operations Manager before being accepted.

    Maintain awareness of labour, overtime, freelance resource, materials, plant hire, logistics, local purchasing, damage and rework.

    Challenge inefficient methods and accurately record reasons for significant unplanned resource or expenditure.

  10. 10. Dismantling & Continuous Improvement

    Plan dismantling, asset segregation, packing, loading priorities and onward-event requirements as part of the original build plan.

    Complete dismantling within venue deadlines and report asset damage or loss.

    Capture lessons on methodology, labour, materials, technical information, suppliers, plant, logistics, quality and safety for future events.

THE SKILLS AND EXPERIENCE YOU NEED:
  • Significant practical experience in event build, bespoke fabrication, temporary structures, exhibition build, signage or a comparable environment.
  • Experience leading on-site build teams and coordinating labour, materials, tools and plant.
  • Strong practical understanding of construction and assembly methods relevant to temporary event delivery.
  • Experience reading drawings and technical information and delivering to immovable deadlines.
  • Strong safety awareness and practical problem-solving capability.
  • International event or motorsport experience is advantageous; Formula 1 experience is highly advantageous.
  • Event build management and crew leadership.
  • Build sequencing, practical construction and assembly.
  • Reading technical drawings and applying build methodologies.
  • Resource, materials, tools and plant planning.
  • Quality management, H&S implementation and problem solving.
  • Productivity management, cost awareness and cross-functional coordination.
WICHTIGE INFORMATIONEN:

Arbeitsort: Diese Position kann entweder im Büro in Amberg, Deutschland, oder in Orpington, London, angesiedelt sein

Büroregelung: Hybrid - 3 Tage im Büro

Reisetätigkeit: Umfangreiche internationale Reisetätigkeit während der gesamten Formel-1-Saison

IHRE AUFGABEN:
  1. 1. Leistungsumfang und Planung vor der Veranstaltung

    Vereinbarte Ergebnisse, Standorte, Zeichnungen, Spezifikationen, Zeitplan und Fertigstellungsanforderungen verstehen.

    Den Leistungsumfang in einen praktischen Aufbauplan überführen, der Personal, Materialien, Maschinen, Zugang, Lagerung, technische Informationen und Abbau abdeckt.

    Fehlende Informationen, unrealistische Annahmen oder Ressourcenlücken früh genug erkennen, damit vor der Mobilisierung Korrekturmaßnahmen erfolgen können.

  2. 2. Aufbauzeitplan und Arbeitsabfolge

    Den Leistungsumfang in klare Arbeitspakete aufteilen und kritische Aktivitäten, Abhängigkeiten und Übergabepunkte festlegen.

    Die Arbeitsabfolge mit der operativen Eventleitung und anderen Veranstaltungsbereichen koordinieren.

    Den Fortschritt kontinuierlich überwachen und Aufholmaßnahmen umsetzen, wenn die Umsetzung hinter dem Zeitplan zurückbleibt.

  3. 3. Teamführung

    Zugewiesene Mitarbeitende, Auftragnehmer, freie Mitarbeitende und Fachpersonal führen.

    Klare tägliche Anweisungen, Aufgaben, erwartete Ergebnisse, Methoden sowie Qualitäts- und Sicherheitsanforderungen vorgeben.

    Ressourcen nach Fähigkeit und Erfahrung zuteilen, Produktivität überwachen und Leistungsprobleme angemessen bearbeiten.

  4. 4. Schnittstelle zu Design und Technik/CAD

    Mit Design zusammenarbeiten, um die gestalterische Absicht zu verstehen und Probleme der baulichen Umsetzbarkeit vor der Mobilisierung zu erkennen.

    Technik/CAD für technische Zeichnungen, Details, Aufbaumethodik, Verbindungen, Befestigungsansätze und technische Problemlösung nutzen.

    Genehmigtes Design oder technische Zielsetzungen nicht eigenständig ändern, wenn eine Prüfung oder Freigabe erforderlich ist.

  5. 5. Materialien, Beschaffung und Betriebsmittel

    Materialbedarf identifizieren und frühzeitig an Beschaffung und operative Eventleitung kommunizieren.

    Mit Bestands- und Betriebsmittelmanagement sicherstellen, dass eigene Betriebsmittel verfügbar, vorbereitet, vor Ort kontrolliert und korrekt zurückgegeben werden.

    Engpässe, falsche Materialien, Schäden oder Qualitätsbedenken unverzüglich melden und unnötige Notkäufe vermeiden.

  6. 6. Werkzeuge, Maschinen und Logistik

    Erforderliche Werkzeuge, Zugangstechnik, Hebegeräte, Fahrzeuge und Spezialmaschinen bestimmen.

    Lieferzeiten, Entladung, Lagerung, Zugang zum Aufbaubereich, Maschinenpositionierung, Rückgaben und Weitertransporte mit der Logistik koordinieren.

    Sicherstellen, dass Ausrüstung geeignet ist und gegebenenfalls von fachkundigem oder befugtem Personal verwendet wird.

  7. 7. Schnittstellen zu Montage und Compound

    Klare Abgrenzungen und Übergaben mit der Montageleitung vereinbaren, wo Arbeitsbereiche ineinandergreifen.

    Gemeinsam genutztes Personal, Maschinen, Zugänge oder Geländeflächen über die operative Eventleitung koordinieren.

    Mit der Compound-Leitung Lagerung, Werkzeuge, Verbrauchsmaterial, Abfälle und weitere Compound-Unterstützung abstimmen.

  8. 8. Arbeitsschutz und Qualität

    Geltende Arbeitsschutzmaßnahmen, Methoden, Geländeregeln sowie Anforderungen an persönliche Schutzausrüstung, Hebearbeiten, Höhenarbeiten, Ordnung und Sauberkeit im Arbeitsbereich umsetzen.

    Arbeiten stoppen, wenn sie nicht sicher fortgesetzt werden können, und wesentliche Bedenken eskalieren.

    Die Qualität während des gesamten Aufbaus prüfen, Mängelbeseitigung steuern und Defekte nach Möglichkeit vor der Übergabe beheben.

  9. 9. Leistungsumfang, Kosten und Produktivität

    Den genehmigten Leistungsumfang verstehen und sicherstellen, dass zusätzliche Anfragen der operativen Eventleitung bekannt sind, bevor sie angenommen werden.

    Personal, Überstunden, freie Mitarbeit, Materialien, Maschinenmiete, Logistik, lokale Käufe, Schäden und Nacharbeit im Blick behalten.

    Ineffiziente Methoden hinterfragen und Gründe für wesentliche ungeplante Ressourcen oder Ausgaben korrekt dokumentieren.

  10. 10. Abbau und kontinuierliche Verbesserung

    Abbau, Betriebsmitteltrennung, Verpackung, Verladeprioritäten und Anforderungen nachfolgender Veranstaltungen als Teil des ursprünglichen Aufbauplans planen.

    Den Abbau innerhalb der Fristen des Veranstaltungsorts abschließen und Betriebsmittelschäden oder -verluste melden.

    Erkenntnisse zu Methodik, Personal, Materialien, technischen Informationen, Lieferanten, Maschinen, Logistik, Qualität und Sicherheit für künftige Veranstaltungen erfassen.

ERFORDERLICHE FÄHIGKEITEN UND ERFAHRUNGEN:
  • Umfassende praktische Erfahrung in Veranstaltungsaufbau, Sonderfertigung, temporären Bauten, Messebau, Beschilderung oder einem vergleichbaren Umfeld.
  • Erfahrung in der Führung von Aufbauteams vor Ort und Koordination von Personal, Materialien, Werkzeugen und Maschinen.
  • Fundiertes praktisches Verständnis relevanter Konstruktions- und Zusammenbaumethoden für temporäre Veranstaltungen.
  • Erfahrung im Lesen von Zeichnungen und technischen Informationen sowie in der Umsetzung zu unverrückbaren Terminen.
  • Ausgeprägtes Sicherheitsbewusstsein und praktische Problemlösungsfähigkeit.
  • Internationale Veranstaltungs- oder Motorsporterfahrung ist von Vorteil; Formel-1-Erfahrung ist von großem Vorteil.
  • Veranstaltungsaufbaumanagement und Teamführung.
  • Aufbauabfolge, praktische Konstruktion und Zusammenbau.
  • Lesen technischer Zeichnungen und Anwendung von Aufbaumethoden.
  • Planung von Ressourcen, Materialien, Werkzeugen und Maschinen.
  • Qualitätsmanagement, Umsetzung von Arbeitsschutz und Problemlösung.
  • Produktivitätsmanagement, Kostenbewusstsein und bereichsübergreifende Koordination.

This job advertisement has been translated using AI. While every effort has been made to ensure accuracy, some wording or nuances may differ from the original version.

Hinweis zur Übersetzung: Diese Stellenanzeige wurde mithilfe künstlicher Intelligenz (KI) übersetzt. Obwohl größtmögliche Sorgfalt auf die Genauigkeit der Übersetzung verwendet wurde, können einzelne Formulierungen oder sprachliche Nuancen von der Originalfassung abweichen.

THE·TEAM does not discriminate on the basis of race, sex, color, religion, age, national origin, marital status, disability, veteran status, genetic information, sexual orientation, gender identity or any other reason prohibited by law in provision of employment opportunities and benefits.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Compound Manager (Sport Signage)
Compound Manager (Sport Signage)

Wasserman • Orpington

Hybrid
GBP 36,000 - 54,000
CAD Technician / Technical CAD Designer (Sport Signage)
CAD Technician / Technical CAD Designer (Sport Signage)

LE149 Sport Signage UK Limited • Orpington

Hybrid
GBP 42,000 - 60,000
CAD Technician / Technical CAD Designer (Sport Signage)
CAD Technician / Technical CAD Designer (Sport Signage)

THE·TEAM • Orpington

Hybrid
GBP 32,000 - 46,000
Account Manager, Event Branding & Signage (Motorsports)
Account Manager, Event Branding & Signage (Motorsports)

Wasserman • Orpington

Hybrid
GBP 42,000 - 66,000
Account Executive, Event Branding & Signage (Motorsports)
Account Executive, Event Branding & Signage (Motorsports)

LE003 The.Team: SME Management EMEA Limited • Orpington

Hybrid
GBP 28,000 - 42,000
Senior Applications Engineer (Telemetry & On Car)
Senior Applications Engineer (Telemetry & On Car)

Formula One Management Limited • Biggin Hill

On-site
GBP 70,000 - 110,000
Private Healthcare scheme
Dental Care
4 x Grand Prix Paddock passes per pass
+8
Account Executive, Event Branding & Signage (Motorsports)
Account Executive, Event Branding & Signage (Motorsports)

THE • Orpington

Remote
GBP 32,000 - 54,000
Account Manager, Event Branding & Signage (Motorsports)
Account Manager, Event Branding & Signage (Motorsports)

THE • Orpington

Remote
GBP 42,000 - 62,000
Senior Paddock Operations Manager
Senior Paddock Operations Manager

Formula One Management Limited • Greater London

On-site
GBP 85,000 - 115,000
Private healthcare
Dental care
Staff shuttle
+4
Electrician
Electrician

Formula One Management Limited • Biggin Hill

On-site
GBP 38,000 - 52,000
Private Healthcare
Dental Care
Annual leave 25 days
+5