Data Center Construction Logistics Lead

Turner-

Valencia

On-site

EUR 70,000 - 100,000

Full time

14 days+

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

GE Vernova in Barcelona seeks a ROC Technical Lead for Remote Operations Center (Wind Energy). You monitor turbine performance, support commissioning and service via remote diagnostics, and collaborate with field teams to maintain safe, efficient operation.

You will read electrical schematics, use SCADA tools, analyze data, and travel up to 20% as needed. Fluent English is required; relocation to Barcelona may be needed.

Qualifications

  • Bachelor’s or Master’s degree in Engineering or equivalent.
  • Hands-on experience with wind turbines or similar systems in operational environments.
  • Ability to read electrical schematics and troubleshoot.

Responsibilities

  • Monitor turbine performance and respond to alarms or abnormal conditions.
  • Support commissioning and service activities through remote diagnostics and troubleshooting.
  • Assist field teams in resolving technical issues and restoring performance.
  • Escalate complex issues with clear technical information.
  • Collaborate with engineering and support teams to resolve problems.
  • Analyse operational data to identify faults, trends, and improvement opportunities.
  • Support reporting and communication of technical findings.
  • Contribute to process improvement and operational optimisation.
  • Support grid outages when required, prioritising safety and compliance.

Skills

Wind turbine experience
SCADA familiarity
Analytical thinking
English fluency
Collaborative mindset

Education

Bachelor's or Master's in Engineering

Tools

SCADA software
Diagnostic tools

Job description

ROC Technical Lead - Wind Remote Operations

**Job Description Summary**
**Job Description**
**ROC Technical Lead - Remote Operations Center (Wind Energy)**
Barcelona, Spain

**About us**
At GE Vernova, you are part of a global mission to electrify the world and accelerate the transition to more sustainable energy. With a legacy of engineering excellence and innovation, you help deliver reliable, affordable, and lower‑carbon power that supports communities, industries, and everyday life.
Your work directly contributes to shaping the future of energy.

**About the role**
As a ROC Technical Lead, you support the safe and efficient operation of advanced offshore wind assets from a remote operations center. You play a key role across both commissioning and service phases, helping ensure turbines perform reliably throughout their lifecycle.
You work closely with site teams and engineering experts to detect, analyze, and resolve technical issues, ensuring stable operations and continuous improvement.

What you'll do
  • Monitor turbine performance and respond to alarms or abnormal conditions
  • Support commissioning and service activities through remote diagnostics and troubleshooting
  • Assist field teams in resolving technical issues and restoring performance
  • Escalate complex issues with clear and structured technical information
  • Collaborate with engineering and support teams to resolve problems
  • Analyse operational data to identify faults, trends, and improvement opportunities
  • Support reporting and communication of technical findings
  • Contribute to process improvement and operational optimisation
  • Support grid outages when required, prioritising safety and compliance
  • Work on a rotating weekday shift schedule with occasional on‑call support during weekends and public holidays
What you bring
  • Bachelor's or Master's degree in Engineering, or equivalent experience in the wind energy sector
  • Hands‑on experience with wind turbines or similar electromechanical systems in operational environments
  • Ability to read electrical schematics and apply them in troubleshooting and field support situations
  • Experience with SCADA systems and other digital monitoring tools
  • Strong analytical and problem‑solving skills with clear technical communication, calm structured approach under pressure, and a collaborative, proactive mindset
  • Availability to travel up to 20% of the time, if required.
  • Fluent English (spoken and written), willingness to relocate to Barcelona and EU work eligibility.
Nice to have
  • Control room or remote operations experience
  • Offshore wind or commissioning experience
  • Exposure to advanced turbine control systems (e.g., MarkVIe or similar)
  • Experience working in multicultural teams
  • Fluent in Spanish (spoken and written)
Ways of working
  • You work on a rotating weekday shift schedule (Monday to Friday), covering morning and afternoon shifts.
  • You also take part in an on‑call rotation for occasional weekend and public holiday support.
Our culture

At GE Vernova, you help drive the transition to a more sustainable energy future. Every contribution matters as we work to deliver reliable power worldwide.
We support your growth through learning, development, and internal mobility, helping you build a career that evolves with you.
We are committed to inclusion and diversity, creating an environment where everyone can thrive and contribute.

Join us

If you want to work at the forefront of wind energy and help shape the future of global power systems, this is your opportunity to make an impact.

**Additional Information**
**Relocation Assistance Provided:** No
GE Vernova is an Equal Opportunity Employer. Employment decisions are made without regard to race, color, religion, national or ethnic origin, sex, sexual orientation, gender identity or expression, age, disability, protected veteran status or other characteristics protected by law.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Remote Roc Technical Lead — Wind Operations
Remote Roc Technical Lead — Wind Operations

Amentum • Mieres

Remote
EUR 90,000 - 120,000
Wind Remote Operations Technical Lead
Wind Remote Operations Technical Lead

Hoff • Elche

Remote
EUR 80,000 - 110,000
Remote Wind Operations Lead — Technical Strategy
Remote Wind Operations Lead — Technical Strategy

E484 Sulzer Pumps Spain S.A. • Burgos

Remote
EUR 90,000 - 130,000
Wind Remote Operations Lead (Roc)
Wind Remote Operations Lead (Roc)

Veeva Systems • Valencia

Remote
EUR 90,000 - 120,000
Data Product Lead
Data Product Lead

Jobgether • Valencia

On-site
EUR 80,000 - 110,000
Lead Landscape Architect: Urban Planning & Site Supervision
Lead Landscape Architect: Urban Planning & Site Supervision

Batlle I Roig • Barcelona

Remote
EUR 90,000 - 130,000
Product Lead (Test, Evolve & Launch)
Product Lead (Test, Evolve & Launch)

Alsvior Global LTD • Barcelona

On-site
EUR 90,000 - 130,000
Senior Production & Studio Operations Coordinator
Senior Production & Studio Operations Coordinator

Aimsport • Madrid

On-site
EUR 70,000 - 100,000
Autonomous Vehicle Safety Driver & Test Operations
Autonomous Vehicle Safety Driver & Test Operations

Renrui HR • Madrid

On-site
EUR 70,000 - 100,000
Remote Media Operations Lead | Multi-Brand Coordination
Remote Media Operations Lead | Multi-Brand Coordination

Ace Alliance • Gijón

Remote
EUR 90,000 - 120,000