Turn this role into an interview — a resume and cover letter built around what this employer wants.
NES Fircroft in Canada seeks a Commissioning Operator for the Power Block Unit to support the initial startup, testing, and stabilization of Baker Hughes Gas Turbines (LT16 x3) and Mitsubishi Heavy Industries STG. You will ensure safe energization and bring systems to full production capacity in line with Air Products safety standards.
The role involves significant field work with vendors and engineering, troubleshooting, and training Operations personnel.
Reporting to the Commissioning Coordinator for the Power Block, the Commissioning Operator (Power) will support the initial startup, testing, and stabilization of the Baker Hughes Gas Turbines (model LT16 x 3) and the Mitsubishi Heavy Industries (MHI) STG.
Scope includes ensuring all equipment is safely energized, tested, and brought to full production capacity in compliance with Air Products safety standards.
The position requires working with Vendors and subcontractors and significant hands-on field activities; troubleshooting equipment, verifying system performance against design specifications, and training Operations personnel.
Power Engineer (min 4th Class)
Minimum 5 years of hands-on operator experience with Gas Turbine Generators (GTGs) and/or Steam Turbine Generators. Experience in the commissioning & startup of this equipment is highly preferred.
Strong understanding of GTG and/or STG operation required.