Wind Turbine Commissioning Electrician – FIFO (QLD)

GE Vernova Onshore Wind Projects

Rockhampton

On-site

AUD 149,000 - 202,000

Full time

2 days ago
Be an early applicant

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

GE Vernova Onshore Wind Projects in Rockhampton, QLD, is hiring a Wind Turbine Commissioning Electrician FIFO/DIDO for Boulder Creek Wind Farm. The 12‑month contract requires 3:1 rotation, full FIFO from Australia, and an attractive daily rate including superannuation.

January start is available. You will conduct electrical commissioning across WTGs, perform testing, energisation and fault diagnosis, and maintain documentation and safety standards.

Qualifications

  • Australian A Grade Electrical License is required.
  • GWO BST & ART certifications required.
  • HV switching operations - willing to train before start date.
  • Valid Driver's License and White Card.
  • Windfarm service tech/MCU/construction experience.
  • Ability to read electrical schematics and single line diagrams.
  • Experience with reporting and documentation management.
  • Network and SCADA systems experience.
  • Instrumentation, automation, PLC, rotating machinery experience (desired).
  • Experience mentoring or leading commissioning teams (desired).

Responsibilities

  • Execute electrical commissioning activities in accordance with approved procedures.
  • Perform electrical installation work related to commissioning.
  • Conduct electrical testing, verification and fault finding.
  • Apply, control and remove electrical and mechanical LOTO where authorized.
  • Execute turbine energization and de-energization under HV procedures.
  • Perform electrical fault diagnosis on ELV, LV, and HV systems.
  • Lead commissioning activities at turbine level with safety and quality focus.
  • Ensure commissioning documentation and checklists are up-to-date.
  • Adhere to EHS and site electrical safety rules.

Skills

AC/DC electrical systems
SCADA systems
Reading schematics & diagrams
Leadership/mentoring

Education

Certificate III or IV Instrumentation

Tools

PLC programming

Job description

GE Vernova Onshore Wind Projects in Rockhampton, QLD, is hiring a Wind Turbine Commissioning Electrician FIFO/DIDO for Boulder Creek Wind Farm. The 12‑month contract requires 3:1 rotation, full FIFO from Australia, and an attractive daily rate including superannuation.

January start is available. You will conduct electrical commissioning across WTGs, perform testing, energisation and fault diagnosis, and maintain documentation and safety standards.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Wind Turbine Commissioning Electrician FIFO/DIDO
Wind Turbine Commissioning Electrician FIFO/DIDO

GE Vernova Onshore Wind Projects • Rockhampton

On-site
AUD 149,000 - 202,000
Wind Turbine Commissioning Electrician – Contract
Wind Turbine Commissioning Electrician – Contract

Atlas NextWave • Queensland

Remote
AUD 120,000 - 150,000
Mobilisation
Accommodation
Car provided
Electrician – Wind Farm (On-site Housing + FIFO)
Electrician – Wind Farm (On-site Housing + FIFO)

Fuse Recruitment • Sydney

On-site
AUD 76,000 - 83,000
Accommodation provided on site
$80 LAHA per day
Overtime available
+2
Wind Turbine Commissioning Electrician - 12m Contract (Car & Accom)
Wind Turbine Commissioning Electrician - 12m Contract (Car & Accom)

Atlas NextWave • Queensland

Remote
AUD 120,000 - 150,000
Mobilisation
Accommodation
Car provided
Wind Farm Commissioning Electrician – 3:1 Roster NSW
Wind Farm Commissioning Electrician – 3:1 Roster NSW

Brunel • Wellington

On-site
AUD 83,000 - 124,000
Flights provided
Shared accommodation
Vehicle provided
Commissioning Technician Electrician
Commissioning Technician Electrician

Brunel • Wellington

On-site
AUD 83,000 - 124,000
Flights provided
Shared accommodation
Vehicle provided
HV Commissioning Electrician — 2:1 FIFO, WA
HV Commissioning Electrician — 2:1 FIFO, WA

NES Fircroft • Western Australia

On-site
AUD 119,000 - 170,000
2:1 FIFO roster from Perth
12-month contract with extension
NES Fircroft consultant support
Commissioning Engineer - HV Substations & Renewables (FIFO)
Commissioning Engineer - HV Substations & Renewables (FIFO)

UGL • Sydney

On-site
AUD 120,000 - 170,000
FIFO from major Australian cities
Attractive remuneration package
Job security with project pipeline
+2
Wind Farm Electrical Technician – Field Service
Wind Farm Electrical Technician – Field Service

GE Vernova • Bodangora

On-site
AUD 80,000 - 110,000
Senior Onshore Wind Commissioning Leader
Senior Onshore Wind Commissioning Leader

Ge Vernova • Sydney

Remote
AUD 180,000 - 240,000
Top locations