Job Search and Career Advice Platform

Enable job alerts via email!

Senior Project Controls Specialist: Cost, Schedule & Risk

Manpower Group Middle East

Dubai

On-site

AED 120,000 - 200,000

Full time

Today
Be an early applicant

Generate a tailored resume in minutes

Land an interview and earn more. Learn more

Job summary

A leading consulting firm in Dubai is looking for an expert in project controls who will lead analytical activities relating to cost analysis, scheduling, and risk tracking. The ideal candidate will have between 6–8 years of experience in the field, with a strong proficiency in tools like Primavera P6 and Ares Prism. A Bachelor’s degree in a related field is required, along with preferred certifications. This role ensures data integrity within the project control systems and supports effective decision-making.

Qualifications

  • 6–8 years of experience in project controls within mining or large infrastructure projects.
  • Professional certifications such as CCP, PSP, or PMI‑SP are preferred.

Responsibilities

  • Lead analytical activities related to project controls including cost analysis and scheduling.
  • Monitor progress against approved cost and schedule baselines, analyzing variances and trends.
  • Coordinate with various teams to ensure consistency in project control information.

Skills

Advanced proficiency in Primavera P6
Data visualization tools (e.g., Power BI)
Strong understanding of cost control
Analytical skills
Strong communication skills

Education

Bachelor’s degree in Engineering, Project Management or related field

Tools

Primavera P6
Ares Prism
MS Excel
Job description
A leading consulting firm in Dubai is looking for an expert in project controls who will lead analytical activities relating to cost analysis, scheduling, and risk tracking. The ideal candidate will have between 6–8 years of experience in the field, with a strong proficiency in tools like Primavera P6 and Ares Prism. A Bachelor’s degree in a related field is required, along with preferred certifications. This role ensures data integrity within the project control systems and supports effective decision-making.
Get your free, confidential resume review.
or drag and drop a PDF, DOC, DOCX, ODT, or PAGES file up to 5MB.